Loading...
HomeMy WebLinkAboutBLD01-058Wazennan &. Katz Building 78I Quincy Street Suite 301 Part Town end WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $LDO1-O58R-1 Issued: 06/01/01 Parcel Number: 985203608 Job Address: 2150 Ash Street Zoning R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 612 Nature of Work: Rev #1• Revised engineering reQardin¢ pier pads, I-foists. web stiffeners and stud spacinE. See attached letters dated May 10 and 17. Owner: LBR Construction dba Anderson Homes. LLC Contractor: LBR Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: electrical -Contact Labor & Industries @ 360-417-2702 See also Original Permit BLDO1-O58 for required inspections. RF(liTiRF.l7 iNCPF,('TiONS APPROVED/DATE FOOTINGS: (per 5!17/01 letter) 2 foot square pier pads @ porch posts Reinforcement - 2 - #4 each way Simpson CB66 post bases ~// ~/~~Q~ ( ~/ `~/ FLOOR FRAMING: ~ 2~ d BCI -see engineering letter 5/10/07 re: web stiffeners Joists - 2" x 12" OK @ balcony floor per engineering letter 5/17/01 FRAMING: (per 5/10/Ol letter) Walls -spacing OK @ 24" o.c.; shear walls with stub spacing @ 24" o.c. require horizontal sheathing with all joists blocked Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemril p BLDOI-O56 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Pu61ic Works inspection call 385-2294. A minimum of twenty-tour hours notice is required. Public Works approval must be received prior to scheduling the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal apd approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-024-5555 Page 2 of 2 Wz4rmen & Katz Buflding 181 QuIMy 54ee4 Su14 301 Porl Townund, WA 98368 Phone: 360J79-5086 Foz 360-385-7675 CITY OF PORT TOWNSEND J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MU5T BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-OS8 Issued: 04/27/01 Parcel Number: 985203608 1 I'I S V S{reef Job Address: "`^~ Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 612 Nature of Work: Construct Sinele-family DwellinE with earaee Owner: LBR Construction dba Anderson Homes, LLC Contractor: LBR Construction GENERAL CONDITIONS APPLY: See last paPe 1. G- (~. f SS vED 9/Z~/Oj SEPARATE PERMITS REQUIRED: (~TC.17~/2G'~ 1 j(I C ~ t Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 N TE: All engineered details including holdowns, shear waNs & connections require inspection prior to cover RF,OTTTRF,D TNSPF.CTTONS APPRO VED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks ~.-/ ~~J/ ©~ Footings ` Forms Reinforcement Interior Footings Porch/Deck Piers /~ CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 8uildmg Pmnil #OIASB REQUIRED INSPECTIONS APPROVED/DATE .J FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers -per engineering 7/8" @ 10"o.c. and %s" @ IS" o.c. Foundation Vents - 9 required Crawl Access Post-to-Fdn. Wall Positive Connections Engineered Holdowns ~ ~//?/O J t FLOOR FRAMING NOTE: Engineered BCII joist plan on-site and available to the Inspector at inspection time Girders Joists Blocking Shield under Post Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts & Washers ~ PLUMBING Rough-In (D-V-T & Clean outs) ~(,(J1J ~ (,(JS 7// o/(~~ ®,J " Water Supply ! l Gas Supply Water Hammer Arrestor Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit #OIA58 RF,OTITRF,D TNSPECTTONS APPROVED/DATE MECIIANICAL LPG Fireplace - Heat Pump - HSPF =/> 6.8; COP =/> 3.0 G~~/~ f Ducts & duct insulation (supply and return air ducts R-8; supply ducts in conditioned space R-4) Whole house ventilation Integrated system 7" minimum smooth duct (8" min. flex) Automatic (electric) damper -certification from installer required at final Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfm) and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING -Street Development Permit to be issued ~ / ~ prior to Framing ~~~ ?~ Walls Engineered Shear Walls -block all panel edges ~ Roof -engineered truss plan to be on-site at time of ~ ` ~ Inspection Truss positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be an windows & doors at time of inspection Air Seal Fireblocking Weather Resistive Battier INSULATION off ~ ~J/~~ ~- ~~~,~~ ~_ +a'" ~r-~~1 ~ ~~~ Floor (R-19 required) % 71i ~ Walls (R-19 including garage/house common wall) Ceiling (R-30) Baffles Vapor Barrier - 4 mil poly on walls; ceiling?? 6 mil black poly in crawl space -seams lapped 12" t, ~ Ca1148 hours before you dig for utility line locates 1-500-4245555 Page 3 of 5 Building Permit #01-038 RE UIRED INSPECTIONS DRYWALL NAILING Walls ~~ Ceiling ~ GaragelHouse Occupancy Separation Enclosed Usable Space under Stairs FINAL Public Works Sign-off House Numbers - 5" numbers. Plumbing MechanicaVHeating Fresh air certification from installer Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building APPROVED/DATE GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. . once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted 6y required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aaaroval must 6e received prior to scheduling the Building Deaartment's final inspection. Ca1148 hours before you dig for utility tine Locates I-800-424-5555 Page 4 of 5 Building Pertnil #O1-058 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, ar if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates -~ 1-800-424-5555 Page 5 of 5 ..