Loading...
HomeMy WebLinkAboutBLD01-057wstermm ~ xztz auitaing I81 Quinry Sheet, Suite 301 Pat Toamsend WA 98368 Phone: (360) 379-3206 Faz: (360) 386-7676 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-OS7R-1 Issued: 06/07/01 Parcel Number: 985203609 Job Address: 1151 V Street Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 712 Nature of Work: Rev #1 • Revised enpineerina reQardinE floor foists, stairway column, and shear wall #1 and 4 near office and dinin¢ room. See attached letter dated Mav 24. Owner: LBR Construction dba Anderson Homes, LLC Contractor: LBR Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: .Electrical -Contact Labor & Industries @ 360-417-2702 See also Original Permit BLDOl-057 for required inspections. RF.OiIiRF.D INSPECTIONS APPROVED/DATE FOOTING: Ribbon footing FOUNDATION: Engineered holdowns per item #d FRAMING: 1 6 x 8 column and straps per item #b ~~" ~~® Shear wall #1 per item #c Shear wall #4 per item #d Pony wall per item #d Call 48 hours before you dig for utility -ine locates 1-800-424-5555 Page 1 of 2 PamiLNBLD01-05771-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 38 5-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. Far Public Works inspection ca11385-2294. A scheduline the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 . c P r. Waterman & Kab Building 181 Quincy Sheet, Suile 301 Port TownsenQ WA 98368 Phone: 360479-5086 Fna 360385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 Tor Inspection Permit Number: BLDO1-OS7 Issued: OS/04/Ol Parcel Number: 985203609 Job Address: 1151 V Street Zoning: R_II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 7/2 Nature of Work: Construct Single-family Dwellin¢ with earaee Owner: LBR Construction dba Anderson Homes. LLC Contractor: LBR Construction GENERAL CONDITIONS APPLY: See last Wage i SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 N TF: All engineered details including holdowns, shear walls & connections require inspection prior to cover RFnTiTRF>) TNSPFCTTnNS APPRnVF,n/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Graveled construction entrance required to prevent ' dirt and sediment from leaving the site FOOTINGS Setbacks / ,~ / ~/ /~j/~~ Footings ((( Forms Reinforcement Interior Footings Po eck Piers ~~~ CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Pemtit #O1-051 RE UIRED INSPECTIONS APPROVED/DATE a 1 T .. 'n FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers -per engineering Foundation Vents -12 required Crawl Access Post-to-Fdn, Wall Positive Connections Engineered Holdowns ~'/Z~ ~Q, FLOOR FRAMING NOTE: Engineered BCII joist plan on-site and available to the Inspector at inspection time //2 , /~O~ n n V `f`/ `(~j / Girders ~ - Joists Blocking Shield under Post Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts & Washers Rough-In (D=V-T &'Clean outs) Water Su l C~ ~ ~~ ,,~~77 ~~'' G '' ~ pp y 6L~D ~ ~ (v , ~ Gas Sup ater Hammer Arrest r Hose Bi - ow protection require Pipe Insulation (R-3) ok ~ G ~ Pressure Reduction Valve if> 80 psi ~ 1 ~' ~ °~ Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 • Building Permit ilOlA57 REQUIRED INSPECTIONS APPROVED/DATE MECHANICAL LPG Fireplace ~~ G (//'~ ;/~ ~ Heat Pump - HSPF =h 6.8; COP =h 3.0 t Ducts & duct insulation (supply and return air ducts R-8; supply ducts in conditioned space R-4) Whole house ventilation Integrated system 7" minimum smooth duct (8" min. flex) Automatic (electric) damper -certification from installer required at final Source Specific Exhaust Fans @ bathrooms (SOcfin), kitchen (100 cfrn) and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) .FRAMING -Street Development Permit to be issued prior to Framing ~ u ~ ~~~ ~ /~ Walls / ,/ Engineered Shear Walls -block all panel edges Roof -engineered truss plan to be o~:-site at time of Inspection Truss positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be on windows, skylights & doors at time of inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-19 required) (,(~~ ~3~D Walls (R-19 including garage/house common wall) Ceiling (R-30) Baflles Vapor Barrier - 4 mil poly on walls 6 mil black poly in crawl space -seams lapped 12" Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pemtit #01-057 REQUIRED INSPECTIONS APPROVF.D/l)ATF. ~. . . DRYWALL NAILING Wails //~~ n Cj //ll~l ! Il/ Ceiling (1 I~':IY Garagell ouse Occupancy Separation Enclosed Usable Space under Stairs FINAL Public Works Sign-off House Numbers - 5" numbers. Plumbing Mechanical/Heating Fresh air certifrcation from installer Insulation Certificate Smoke Detectors Final -building L / o GENERAL CONDITIONS r 1. Contractors working on this project are required to have a Labor & Industries contractor's. registration number and a City business license. Failure to provide proof of this documentation • prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced. wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Buildine Department's final inspection. Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 4 of 5 Building Permit #01-057 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval riot to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 n U