Loading...
HomeMy WebLinkAboutBLD01-055Wateman ffi. Kalz Building 78I Quinry Strce1, Suite 301 ti. Port 7ow~eod WA 98368 Phone: (360)379-3208 Fax: (360)365-7675 i CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLDO1-OSS Issued: 4/6/01 Parcel Number: 991100021 Job Address: 426 Woodland Avenue Zoning: RR=H Type: VV=N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct sinele-family residence Owner: Habitat for Humanity Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 i Note: during dry weather, RoseWind shall require that the construction areas be watered to suppress dust; no chemical dust suppressants shall be used. RR(ITTTRFII TNSPF('TTnNS ~J APPRnVF.D/DATE TEMP EROSION & SEDIMENT CONTROL See General Conditio~t No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks /1 ~/Q Footings Forms Reinforcement Interior Footings Porch Piers UFER Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 4 Pmnit k BLDOI-055 ti,~ r RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms /jn Reinforcement 5~( l `l`/ Beam Pockets Anchor Bolts w/ Z" x 2" x 3/16" washers Foundation Vents - 9 required (not less than 1 sq. ft per 150 sq. ft of under-floor area) Crawl Space Access FLOOR FRAMING Girders j Joists -engineered BCI floor joist plan to be on site at ~ ~ ~~ I time of inspection. ` Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers Foundation Vents - 9 required (not less than 1 sq. ft per 150 sq. ft of under-floor area) Crawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs) ~/ ~~~ n D Water Supply `", { Water Hammer Arrestor @ clothes and dishwasher ' Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan -Bathroom C/ ~ n ) b V l Source Specific Fans in laundry area and kitchen Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3'from o enin Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pemtit p BLDOIA55 i RF.(1TiTRRn iNSPF.C'TTONS APPROVED/DATE FRAMING Walls (/ ~~~~ ; Alternate Braced Wall Panel ~ D Ceilings Roof Truss Positive Connection Attic Venting -ridge Windows -escape Window safety glazing Windows Ufactor - .40 or better. NFRC windww sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Fire Blocking Weather Resistive Bamer INSULATION f J/p / ~ Floor (R=30 } ~' X / ~+ - / ( ~ Walls (R-21) ( % Ceiling (R-30 under unfinished attic; R-38 for ( remainder of ceiling space) Baffles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALLNAII,ING Walls ~ /Z/~~ Ceiling ' FINAL Public Works Sign-Off / /~~/~ House Numbers 6 Plumbing MechanicaVlleating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Prnnit#BI.D01-055 .~ ~ GF.NF.RAi, CONDiTfONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until, Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is repaired. Public Works aouroval must be received prior to scheduling the Buildine Department's final inspection. ~ 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- • residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Deparlanent (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility liue locates 1-800-424-5555 Page 4 of 4