Loading...
HomeMy WebLinkAboutBLD01-053` Watermnn & Kalz Building 181 Quinq Slree4 Suite 301 Port Townsend, WA 98368 Phone: 360S79J208 Fax 360J85-7675 CITY OF PORT TOWNSEND n ~J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-OS3 Issued: 415101 Parcel Number: 999100032 Job Address: 2058 Victoria Avenue Zoning: R_II Type: VV=N Occupancy: RR=3 Total Occupant Load: 8 Nature of Work: Set New Manufactured Home Owner: Scott Riegs Contractor: Vallev Proaerties & Construction WAINS#1690 ****Installer: See Attached Installer Tag**** L ~J GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIlZED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Set-up manual shall be on-site at time of inspection. RF.f)TTiRF.TI iNCPF.('TiONC APPRnVFn/IIATE TEMP EROSION & SEDIMENT CONTROL See general condition #2 Silt Fence as needed Drive Off Mat to prevent sediment from leaving the site FOOTINGS/SLAB Setbacks s~ ~Q/ Forms Reinforcement FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual,- clearance of I S"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual specifies, otherwise area around home graded to provide runoff away from home. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 PerndI NBLDOI-053 RE UIRED INSPECTIONS APPROVED/DATE PLUMBING: Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to " home, min. '/, diameter, same as supply pipe ~ Pressure Reduction Valve if> 80 psi ~ ~ Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space cl r Pressure Test -100 p.s.i. for IS minutes p r l b o \ Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24"above ground Drainage Piping -sloped min. %. "per foot ~- MECHANICAL 1 ~ Ducts & Duct Insulation ' \~ , Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; ~ ~ O ~ follow dryer marmfacturer's instructions; total combined ~ / length of ducting not to exceed 14' w/ 2-90° elbows I b G- FRAMING: ~ Entry Porch/Decks ~ n~ 6 , '0 01 VAPOR BARRIER 6 mil black poly ground cover (not required where area 1 G ~ b b ~ under home is concrete slab floor with a minimum _' ~ ' ~ ~ thickness of 3-% inches) FINAL ~~ ~ , Public Works Sign-Off -, OIL ' Electrical (L & I) Sign-Off D~`~ ~ ~~ ~ ~ ` Ouse Number - muumum numbers Plumbing a 1~ ~'b G Mechanical ~ ti~ $ ~ o ti Final - Buildin No holes or gaps greater than %. "allowed in skirting. Crawl space ventilation per installation manual @ 1/150 (]8 required), located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access. to all areas under home, minimum 18 " x 24 ", covered with vinyl, ~ l~~O f pressure treated wood or metal. I Call 48 hours before you dig for. utility line locates 1-800-424-5555 Page 2 of 3 Permit ttBLD01-053 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. . 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 3