HomeMy WebLinkAboutBLD01-052Waterman and Katz Building
l81 Quincy Street Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (36D) 385-7675
CITY OF PORT. TOWNSEND
~,
J
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O52R-1 Issued: 06/19!01 Parcel Number: 948 002 0(11
Job Address: 1134 Umatilla Avenue Zoning: R-II Type: VV=N
Occupancy: RR=3 Total Occupant Load: N/C
Nature o(Work: Revision #1: reduce main floor bath to half-bath, and create full bath upstairs. Move
upstairs closet and add upstairs window.
Owner: Michael Gessin¢er Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
See original permit BLDOl-052 for other inspections.
RF(1TTTRF.TI TNCPFCTT(1NC
APPRnVRn/DATF
PLUMBING l~ ~~~
~f
Rough-In (drains, vents, traps and clean outs) ~
/
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve in > 80 psi
MECHANICAL %~ ~~? ~/
`
~ ~~ ~
/ (
Bathroom Fans -
,
~
Environmental Air Exhaust ducting (w/ backdraft
damper), insulation (R-4) and terminus (located 3'
from openings)
FRAMING f
~7/
Air Seal ~~/
D%
Window U-factor - .65 or better
FINAL -refer to original inspection record
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Perntit #BLDOI-052R-1
GENERAL CONDITIONS °
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Adjacent rights-of way sha11 be kept free of dirt and debris. Any soils exposed during construction shall
be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP), require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required aker any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11 385-2 294; a
minimum of twenty-tour hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within sia months, or if no inspections ais
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. ContaM the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 boors before you dig for utility line locates
1-800-424-5555
Page 2 of 2
C~
Waterman $ Kazz Building
181 Quimy Sveel, Suile 301
Pal Townund, WA 98366
Phone: (360)379-3208 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-O52 Issued: 04/06!01 Parcel Number: 948 002 001
Job Address: ADU: 1134 Umatilla Avenue Zoning: RR=II Type: VV=N Total Occupant Load: 2
Occupancy: R-3 Nature of Work: Construct ADU
Owner: Michael Gesineer Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRF.T) TNSPF.('TTONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the-site
FOOTINGS
Setbacks
J// ~~(~
Footings " l
Forms
Reinforcement
Interior Footings
Por eck Piers
R C2C~" i~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
PamitMBLTMI-053
RE UIRED INSPECTIONS APPROVED/DATE '~
FOUNDATION
Stem Wall
Forms
~/~ //®~
1ri
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" washers
Vents - 4 required
Crawl Access
Beam Pockets
FLOOR FRAMING
Girder
joists S/2~~01
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts and Washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestor
Gas Supply
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Whole House Fan -Bath
Kitchen Fan
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
Hsu 4a Hours oe~ure you u3g wr uuuiy une ~ucaies
1-800-424-5555
Page 2 of 4
Permit K ]3LD01-052
i
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING:
Walls
Treated Wood to Concrete
Ceiling
Roof
Rafter Positive Connection
Roof Venting - @ eaves & gable ends
Windows -escape
Windows -safety glazing
Windows/Skylights U-factor - .65 or better
NFRC window sticker must be on windows and
doors at inspection time
Door U-factor - .40 or better
Air Seal
Fresh Air Intake (Window Ports)
Fire Blocking
Weather Resistive Barrier
INSULATION ~` f
~
~
~
~
~
~ ~
~ ~~~
Floors (R=19) '
~if.
~
<-
~ i
~
Walls (R_19) L
Ceiling (R=30)
Baffles
Vapor Barrier: paint
6 mil black poly in crawl space
DRY WALL NAILING
Walls / /
~~~ 5~~/
Ceiling
FINAL
House Numbers - 5" minimum
Plumbing
Mechanical/Heating (I,PG) ~~~~ Q/,~~Q(
'
Insulation Certificate. (if applicable) /~
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building 3/~~/d~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
r~~ns~.na.os~ ~
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required Public Works anoroval must be received urior to
scheduling the Building Department's final insnection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, ar if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aetive.
9. Revisions require submittal and approval riot to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4