Loading...
HomeMy WebLinkAboutBLD01-052Waterman and Katz Building l81 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (36D) 385-7675 CITY OF PORT. TOWNSEND ~, J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-O52R-1 Issued: 06/19!01 Parcel Number: 948 002 0(11 Job Address: 1134 Umatilla Avenue Zoning: R-II Type: VV=N Occupancy: RR=3 Total Occupant Load: N/C Nature o(Work: Revision #1: reduce main floor bath to half-bath, and create full bath upstairs. Move upstairs closet and add upstairs window. Owner: Michael Gessin¢er Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 See original permit BLDOl-052 for other inspections. RF(1TTTRF.TI TNCPFCTT(1NC APPRnVRn/DATF PLUMBING l~ ~~~ ~f Rough-In (drains, vents, traps and clean outs) ~ / Water Supply Pipe Insulation (R-3) Pressure Reduction Valve in > 80 psi MECHANICAL %~ ~~? ~/ ` ~ ~~ ~ / ( Bathroom Fans - , ~ Environmental Air Exhaust ducting (w/ backdraft damper), insulation (R-4) and terminus (located 3' from openings) FRAMING f ~7/ Air Seal ~~/ D% Window U-factor - .65 or better FINAL -refer to original inspection record Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Perntit #BLDOI-052R-1 GENERAL CONDITIONS ° 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Adjacent rights-of way sha11 be kept free of dirt and debris. Any soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP), require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required aker any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11 385-2 294; a minimum of twenty-tour hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within sia months, or if no inspections ais done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. ContaM the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 boors before you dig for utility line locates 1-800-424-5555 Page 2 of 2 C~ Waterman $ Kazz Building 181 Quimy Sveel, Suile 301 Pal Townund, WA 98366 Phone: (360)379-3208 Faz: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-O52 Issued: 04/06!01 Parcel Number: 948 002 001 Job Address: ADU: 1134 Umatilla Avenue Zoning: RR=II Type: VV=N Total Occupant Load: 2 Occupancy: R-3 Nature of Work: Construct ADU Owner: Michael Gesineer Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTTRF.T) TNSPF.('TTONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the-site FOOTINGS Setbacks J// ~~(~ Footings " l Forms Reinforcement Interior Footings Por eck Piers R C2C~" i~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 PamitMBLTMI-053 RE UIRED INSPECTIONS APPROVED/DATE '~ FOUNDATION Stem Wall Forms ~/~ //®~ 1ri Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Vents - 4 required Crawl Access Beam Pockets FLOOR FRAMING Girder joists S/2~~01 Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts and Washers PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan -Bath Kitchen Fan Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) Hsu 4a Hours oe~ure you u3g wr uuuiy une ~ucaies 1-800-424-5555 Page 2 of 4 Permit K ]3LD01-052 i REQUIRED INSPECTIONS APPROVED/DATE FRAMING: Walls Treated Wood to Concrete Ceiling Roof Rafter Positive Connection Roof Venting - @ eaves & gable ends Windows -escape Windows -safety glazing Windows/Skylights U-factor - .65 or better NFRC window sticker must be on windows and doors at inspection time Door U-factor - .40 or better Air Seal Fresh Air Intake (Window Ports) Fire Blocking Weather Resistive Barrier INSULATION ~` f ~ ~ ~ ~ ~ ~ ~ ~ ~~~ Floors (R=19) ' ~if. ~ <- ~ i ~ Walls (R_19) L Ceiling (R=30) Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Walls / / ~~~ 5~~/ Ceiling FINAL House Numbers - 5" minimum Plumbing Mechanical/Heating (I,PG) ~~~~ Q/,~~Q( ' Insulation Certificate. (if applicable) /~ Vapor Barrier Paint Certificate Smoke Detectors Final -Building 3/~~/d~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 r~~ns~.na.os~ ~ 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works anoroval must be received urior to scheduling the Building Department's final insnection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, ar if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aetive. 9. Revisions require submittal and approval riot to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4