HomeMy WebLinkAboutBLD01-049Watnman & Ka~auilding
181 Quinry Strut, Suite 301
Port Towmmd, WA98368
Phase: (360) 37A3206 Faz: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOl-O49 Issued: 3/12/01 Parcel Number: 948301003
Job Address: Port of Port Townsend Shigvard: 305 8u' Street Zoning: M-IIA
Type: VV=N Occupancy: U-1 Nature of Work: Build Temnorarv Structure - 2400 square foot boat shed.
Prgperty Owner: Port of Port Townsend Contractor/Owner: Schooner Martha Foundation
NOTE: This permit expires 3/12/02. One extension may be granted for a period not to exceed one year
from the Port of Port Townsend The permit extension fee is 547.00; contact the Building and Community
Development Department at 379-3208 to request the extension.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
ELECTRICAL - a separate electrical permit is required for any electrical work. Contact Labor
and Industries at (360) 417-2700 if needed.
FRAMING/FINAL -Framing Inspection may be done at
Final Inspection if all elements are visible for
inspection
Positive connection/Holdowns
Longitudinal Bracing
End Bracing
Plywood Gussets per photographs
Storage of flammable products not allowed. On-site
quantities and storage offlammable products must be
in approved Liquid Storage Cabinets per Uniform Fire
Code provisions. Contact Tom Aumock, Fire
Department at 385-2625 with questions.
Final -Fire Department
2-A:10-B;C minimum rated fire extinguisher required.
Final -Building Department
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLDOI-049
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A .
minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to
scheduline the Buildine DeuartmenPs final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2