Loading...
HomeMy WebLinkAboutBLD01-049Watnman & Ka~auilding 181 Quinry Strut, Suite 301 Port Towmmd, WA98368 Phase: (360) 37A3206 Faz: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOl-O49 Issued: 3/12/01 Parcel Number: 948301003 Job Address: Port of Port Townsend Shigvard: 305 8u' Street Zoning: M-IIA Type: VV=N Occupancy: U-1 Nature of Work: Build Temnorarv Structure - 2400 square foot boat shed. Prgperty Owner: Port of Port Townsend Contractor/Owner: Schooner Martha Foundation NOTE: This permit expires 3/12/02. One extension may be granted for a period not to exceed one year from the Port of Port Townsend The permit extension fee is 547.00; contact the Building and Community Development Department at 379-3208 to request the extension. GENERAL CONDITIONS APPLY -SEE LAST PAGE ELECTRICAL - a separate electrical permit is required for any electrical work. Contact Labor and Industries at (360) 417-2700 if needed. FRAMING/FINAL -Framing Inspection may be done at Final Inspection if all elements are visible for inspection Positive connection/Holdowns Longitudinal Bracing End Bracing Plywood Gussets per photographs Storage of flammable products not allowed. On-site quantities and storage offlammable products must be in approved Liquid Storage Cabinets per Uniform Fire Code provisions. Contact Tom Aumock, Fire Department at 385-2625 with questions. Final -Fire Department 2-A:10-B;C minimum rated fire extinguisher required. Final -Building Department Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BLDOI-049 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A . minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to scheduline the Buildine DeuartmenPs final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2