CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOI-O48 Issued: 03/15/01 Parcel Number: 948324701
Job Address: 902 Sims Wav Zoning: RR=II Type: VV=N Occupancy: RR=3
Nature of Work: SFR Interior Remodel: see attached scone of work
Owner: Norman Nason; Project Manaeer Marshall Ranev Contractor: Owner
(303-9720)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REOiJIRED INSPECTIONS
APPROVED/DATE
PLUMBING ~~
Rough-In (D-V-T & Clean Outs) ~/~~~~/ C' ~/
Water Supply l /(
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80 psi
MECHANICAL
Source Specific Fans ~~ g ~,~D~
~/
Environmental Air Exhaust ducting (with backdraft
dampers), insulation (R-4), and terminus (located 3' from
openings into building) .
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 3
PmniI HBI.DOI-076 `
FRAMING
Walls ^
5
~ /~
Ceiling ` ~
~Vl t
/ l~''
U
Windows - e l
indow U-factor:.65 or better
NFRC label shall be on windows and at time of
Jn
indow Safety Glazin
Air e
Fire Blocking
DRYWALL/NAII..ING (as applicable)
Walls
~~~~~~~ ,~ /J
(`'~
/
Ceilings ~
INSULATION
Fill exposed cavities
Vapor Barrier Req'd: 4 mid poly, vapor barrier paint, etc.
FINAL
House Numbers -check for 5" numbers
Final -Plumbing
Final -Mechanical
Insulation Certificate (if applicable)
Vapor Barrier Paint Certificate (if applicable)
Smoke Detectors in existing construction per '97 UBC
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Prnnit NBT.D01-0A8
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty four hours notice is required Public Works approval must be received prior to
• scheduline the Buildine Department's final insuection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555