CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOl-047R-2 Issued: 05/29/03 Parcel Number: 972 903 101
Job Address: 1356 54`s Street Zoning: RR=I Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 2 Nature of Work: Rev #2: Finish ADU above earaee/shop.
Owner: William Torell Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2'702
For other inspections, see original inspection record BLD01-0478-1 for garage/studeo/shop, and
BLD01-047 for house (1354 54`" Street).
RF,OTITRF,D TNSPF,CTIONS
APPROVED/DATE
PLUMBING
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint Straps
Pressure Relief Valve Drain to exterior;
Elbow down, terminal 6" - 24" A.F.G.
MECHANICAL
LPG Stove
Manufacturer's Installation Instructions to be
on-site @ time of inspection
Whole House Fan
Bathroom Fan
Kitchen Fan
Environmental Air Exhaust ducting, termination and
Insulation
Ca1148 hours before you dig for utility line locates
1-500-424-5555
Page 1 of 3
Building Permit #BLDOI.047R-2
REQUIRED INSPECTIONS APPRnVED/DATF.
FRAMING -see also original inspection record
Walls
Ceiling
Windows -escape provided @ door
Door U-Factor .20 or better
Windows Ufactor - .40 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
Fresh Air: wall port
INSULATION
Floor (R-30)
Walls (R-21)
Vaulted Ceiling (R-30)
Baffles
Vapor Barrier (paint, faced batts or 4 mil. poly)
DRYWALL NAII.ING
`
Walls t 03
~l
Ceiline __-_____-__ __
Verify occupancy separation R-3/U-1
FINAL -see also original permit BLDOl-047
Plumbing
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate (if applicable)
LPG
Smoke Detector
Stairs, Handrails, Guardrails
Final -Building
GENERAL CONDITIONS
1. ContraMors working on this project are required to have a Labor 8c Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching; plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Pemtit kBLD01-04~R-2
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspeMion per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
_.~
w,ceman s x~eu:ta~
1 el Quincy Street, Suite 301
Pat Tavmend WA96368
Phone: (360) 379-3208 Faz: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOI-O47R-I Issued: 4111/01 Parcel Number: 972-903-101
Job Address: 1354 54`° Street Zoning RR=1 Type: V-N Occupancy: U-1 (BLDOl-047R-1)
Total Occupant Load: 6 Nature of Work: Construct Detached Garaee/Shop (see BLDOl-047 for
house
Owner: William Tore1l
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-4I7-2702
****AlT engneered details require inspection prior to cover****
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat to prevent sediment from leaving
the site
MONOLITHIC SLAB
Setbacks
~~ZO R~v~,!,.,~,~,is~r.~ ~p/ZD~D~
Footings (,
Forms
Reinforcement
Interior Footings
Anchor Bolts
Engineered Holdowns
LIFER
Ca11 48 hours before you dig for utility line locates
1-500-424-5555
Page 1 of 4
`,
~~ a awo~.oam-p
REQUIRED INSPECTIONS APPROVF.>n/f)AT F.
FLOOR FRAMING
NOTE: Engineered BCI joist plan shall be on-site for the /1~/ ~ // /
!''
/ O~
inspector at inspection time (
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
Shield Under Posts
PLUMBING: ` ~' _ ~/~ P fa.
Rough-In (D-V-T & Clean Outs)
s`
Water Supply ~ ~ ~ (j a
~-3' t~ Z
Water Hamner Arrestor @ clothes washer
Hose Bibs (backflow protection required)
ipe Insu anon
Pressure Reduction Valve if > 80 psi
MECHANICAL
Dryer Ducting with backdraft damper
Utility Room Fan
Environmental Air Exhaust ducting (with
backdraft dampers), insulation (R-4) and
terminus (located 3' from opening)
FRAMING:
NOTE: Engineered elements require inspection prior to
cover
Walls
E
i
d Sh
ll
W
ng
neere
ear
a
s
Roof /
1~~~~y
Attic Venting -gable end & eave
Ceilings
Posts,beams&headers-4"x l2"DF#1@garage
0.~.
door per. engineering
.Engineered Ridge Beam ~ l
o
Windows -safety glazing (if applicable)
Air Seal s . Z j • Off.
Rafter Positive Connection - Hl
Fire Blocking
Weather Resistive Barrier
,,
~,
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
REQUIRED INSPECTIONS APPROVED/DATE ~, „
Prnnit#HLD01 -067R-1
DRY WALL NAILING
walls
(~/2, 1~~~ ~-
Ceiling
R-3/CT-I Occupancy Occupation
FINAL
LPG
Public Works Sign-Off
House Numbers - 5"
Plumbing
MechanicaVHeating
Insulation Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. AI- elements of engineering including nailing, hotdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
CaII 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
_. ~ - ,
~~ «B~~ aa~a.~ .
8. All building permits expire if no progress has been made within six months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require submittal and approval arior to making changes in the field. ContaM the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 4
Waterman & ICNZBuilding
In Qaiary Street, Stite 301
Pan Towrend, WA 98368
Phmw: (360) 379-3208 Fac (360) 355-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaII 385-2294 for Inspection
Permit Number: BLDOI-047 Issued: 4/11101 Parcel Number: 972-903-101
Job Address: 1354 54t° Street Zoning RR=1 Type: V-N Occupancy: R-3/U-1 (BLDOl-047R-11
Total Occupant Load: 216 Nature of Work: Construct Sinele-family Dwelline (see BLDOl-047R-1 for
ara e
Owner: William Torell
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
****All eneineered details require inspection prior io cover****
RF.nTTTRF,T) TNSPF.('TIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Silt Fence as needed
Drive OffMat to prevent sediment from leaving
the site
FOOTINGS
Setbacks
~~'~
~'N"~-ti . ~/2O/4J~
Footings J
Forms
Reinforcement
Interior Footings
Chimney Footings
Porch Piers
UFER
L)~ ° ' ~~
Call 48 hours before you dig for utility line locates
/ / , / /
1-800-424-5555
Page 1 of 4
r~mastno~.oa~
REQUIRED INSPECTIONS APPROVED/DAT E
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts -per engineering
Vents - 9 required
Crawl Access
Beam Pockets
Engineered holdowns
FLOOR FRAMING
NOTE: Engineered BCI joist plan shall be on-site for the ~//
/
inspector at inspection time ~ ~
O
~ yl
Girders
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
Shield Under Posts
Beam Pockets
Girder to Concrete
Anchor Bolts & Washers
PLUMBING:
R
h
I
(D
T & Cl
n O
t
V
) L P l+cst~ ~/`'~ Q
®
P
-
n
-
oug
-
ea
u
s „-~, ,
~
(/
Water Supply
di
h
h
W
r
l
h ~
er
ater Hammer Ar
estor @ c
ot
es &
s
was ~
Gas Supply /~
rr~~
Hose Bibs (backflow protection required) ~"
,,
~(~~o `~ ' ~ 3 . ~ '~'
/ .
.:''Pressure Reduction Vatve if> 80 psi
Water Heater
Seismic Restraint -strap @ 1/3 points
Pressure relief valve drain to exterior;
6" - 24" above ground
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pemtit N BLD01-047
RF.OIIIRED INSPECTIONS APPROVED/DATE
MECHANICAL
Fireplace -combustion air, hearth, glass doors
LPG Furnace -manufacturer's installation
instructions on-site at time of inspection
Heating Ducts - R-8 in unconditioned space
Whole House Fan -bath
Environmental Air Exhaust ducting (with
backdraft dampers), insulation (R-4) and
terminus (located 3' from opening)
FRAMING:
NOTE: Engineered nailing, strapping and blacking
require inspection prior to cover
Walls
~
Engineered Shear Walls
Roof ~~~~~~ ~~
l
Attic Venting -gable end & eave
Ceilings
Posts, beams & headers
Engineered Ridge Beam &ridge-supporting beam
Windows -egress
Windows -safety glazing (if applicable)
Windows Ufactor - .65 or better 1
~{ 1/ (~
NFRC window sticker must be on ~T
windows & doors at inspection time ~ -y
~~ z3"
Air Seal
Fresh Air Intake (wall)
Door UFactor - .40 or better ~
b
Rafter Positive Connection - HI p
Fire Blocking
Weather Resistive Barrier
INSULATION ~~
Floor (R-19) 8 U
®~O
Wall(R-19) '
Ceiling (R-30 )
Baflles
Vapor Barrier: faced Batts
Crawl Space - 6 mil black poly
DRY WALL NAILING
Walls
C'`¢=-~1~9r~3
Ceiling
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
?p
rn,~axa~nm-pay 'l'
LPG
Public Works Sign-Off
House Numbers - 5"
Plumbing
MechanicaVHeating
Insulation Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to
schedulin¢ the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4