HomeMy WebLinkAboutBLD01-046City of Port Townsend
Waterman & Katz Building
181 Quincy Street Suite 307
Port Townsend WA 98368
Pfione (360) 379-3208 Fax (360} 385-7675
CITY OF PORT TOWNSEND
r~
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDG 1-046 Issued: 3/12/01 Parcel Number: 989704301
Job Address: WATER & MADISON Zoning: C-III Type: VV=N Occupancy: B
Nature of Work: Does AFoot-Lean-To! Temnorarv Structure
Owner: John Sheehan
385-1708
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
APPROVED/DATE
FRAMING
FINAL 3 /iy~a i i~ ~S~
Final-Fire Department
Final-Health Department
Final-Building Department ~/
~ ~ S~Ci1
RE UIRED INSPECTIONS
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 oft
BLDOI-046
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
tree of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construMion is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3.
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours. before you dig for utility line locates
1-800.424-5555
Yage 2 of 2
"~ _
»-