Loading...
HomeMy WebLinkAboutBLD01-046City of Port Townsend Waterman & Katz Building 181 Quincy Street Suite 307 Port Townsend WA 98368 Pfione (360) 379-3208 Fax (360} 385-7675 CITY OF PORT TOWNSEND r~ CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDG 1-046 Issued: 3/12/01 Parcel Number: 989704301 Job Address: WATER & MADISON Zoning: C-III Type: VV=N Occupancy: B Nature of Work: Does AFoot-Lean-To! Temnorarv Structure Owner: John Sheehan 385-1708 Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 APPROVED/DATE FRAMING FINAL 3 /iy~a i i~ ~S~ Final-Fire Department Final-Health Department Final-Building Department ~/ ~ ~ S~Ci1 RE UIRED INSPECTIONS Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 oft BLDOI-046 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's r~istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours. before you dig for utility line locates 1-800.424-5555 Yage 2 of 2 "~ _ »-