Loading...
HomeMy WebLinkAboutBLD01-045Wateman & Rnlz Building I Bl Qtimy Street, Suite 301 Pwt Tow°und W'198368 PMne: (360) 379-3?A8 Fu: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOI-O45 Issued: 03/06/01 Parcel Number: 965701901 Job Address: 907 Pierce Street Zoning: RR=1I Type: VV=N Occupancy: R_3 Nature of Work: Remove existing rooting, replace sheeting, install composition roofing material, provide ventilation Owner: Charlie Haniford Contractor: Hooe Roofing 385-5653 GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.OT1TRRn 1NCPF,C'TT(1NS J APPROVED/DA~'E DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Structural roof sheathing requires 8d @ 6" o.c. edges & 12" field or 1 3/d' staples @ 6" o.c. edges and field. ROOF VENTING Ridge Net free venSlation azea shall not be less than 1 square foot per 150 square feet of the azea of the space ventilated, unless 50% of the required vent opening azea is provided in the upper portion of the roof and therefore the rate may be reduced to 1 square foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant''/s" mesh. ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter I5. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pwtit NBLWI-095 FINAL House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building ENERAL CONDITION 1. Contractors working on this project are required to Gave a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished.. 2. If temporary erosion and sediment control (TESL) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Feud Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at k:ast one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Department (n3 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2