Loading...
HomeMy WebLinkAboutBLD01-044 ~' CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaI1385-2294 for Inspection W emrman & Katz Bwlding 181 Quinry Svee4 Sui[e 301 Pori TowosrnQ WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND Permit Number: BLDOl-044 Issued: 04/16/01 Parcel Number: 957303102 Job Address: 1807 Washineton Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Nature of Work: SFR Interior Remodel: see attached scone of work. Owner: Steahen and Deborah Lewis Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFf1iTiRF.II iN~PF,C'TiONS APPROVED/DATE PLUMING Yough-In (D-V-T & Clean Outs) Water Supply Pipe Insulation (R-3) Pressure Reduction Valve if pressure > 80 psi MECHANICAL Source Specific Fans (if applicable) Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4), and terminus (located 3' from openings into building) FRAMING Walls Ceiling Windows -escape Window U-factor..40 or better ~/L l . ~ , , NFRC label shall be on windows and doors at time of inspection Window Safety Glazing Air Seal Fire Blocking Deck -see attached preservative information Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 PermitMBLD01-044 ~ RE UIRED INSPECTIONS APPROVED/DATE DRYWALL/NAILING (as applicable) Walls Ceilings INSULATION. Fill exposed cavities Vapor Barrier Req'd: 4 mil poly, vapor barrier paint, etc. FINAL House Numbers -check for 5" numbers Final -Plumbing Final -Mechanical Final -Deck Insulation Certificate (if applicable) Vapor Barrier Paint Certificate (if applicable) Smoke Detectors in existing construction per '97 UBC Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license: Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspeMion report corrections sre completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. J Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Pertnil #BLD01-004 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. ~8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 3 ~~-.