HomeMy WebLinkAboutBLD01-042r
•
r
CITY OF PORT TOWNSEND
Wa4nnan & Kale Beading
I81 Quhscy 54ee4 Su14 301
Port Townsend, WA 98368
Phone: 360J793308 Fet 360J83-7673
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O42 Issued: 3115/01 Parcel Number: 948310202
Job Address: 1270 12`h Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/2 Nature of Work: New Single-family Dwelling with Attached Garage
Owner: James Carlson Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Graveled driveway for construction entrance to
prevent soil from being tracked onto City rights-
of-way
See General Condition Number Z
FOOTINGS ///f
Setbacks ~Z ~~~~
(~/
Footings
Forms
Reinforcement
Interior Footings
P lers
~~~ / v
vL
FOUNDATION
Stem Wall /~//
~1/~ 9 /~1 /'//
Forms ~~//( `` ! l
Y
Reinforcement (
ABWP hold downs @ garage end wall
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Beam Pockets
Vents - 13 typical foundation vents required
Crawl Access
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 4
.~ _
Permit#BLDOI-042~~'
REQUIRED INSPECTIONS APPROVED/DATF.
FLOOR FRAMING
Street Development Permit to be issued prior
to framing inspection. /
NOTE: Engineered joist plan shall be on-site at ~ ~
D
~ /
fame of inspection
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets.
Treated Wood to Concrete
Anchor Bolts & Washers
FDN Vents
PLUMBING:
Rough-In (D-V-T & Clean Outs)
i //~~1®t
`
Water Supply t~
Hose Bibs (backflow protection required)
Pipe Insulation
Pressure Reduction Valve if> 80 psi
Water Heater
I8" A.F.F.
Seismic Restraint - 2 places
R-10 under
Pressure relief valve drain to exterior
MECHANICAL
Whole House Fan -Utility Room
`~~~~~ ~ ~
Source Specific Fan
Environmental Air Exhaust ducting, insulation
and terminus (located 3' from opening)
FRAMING:
NOTE: Engineered truss plan shall be on-site at ' L U
-( `~Il l
time of inspection
Walls
Alternate Braced Wall Pane(
Ceilings
Roof
Rafter/Truss Positive Connection
Attic Venting
Posts, beams & headers
•
t
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~..
~-`I
Li
•
•
Permit # BLDUI-042
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING (Continued)
Windows Ufactor - .40 max.
NFRC sticker shall be on windows at time of
inspection
Windows -egress
Air Seal
Fresh Air Intake (Window)
Door UFactor -.20 max. (+ one free door)
Fire Blocking
Weather Resistive Bamer
INSULATION
=~~~"~
`
~f
Floor (R-30) <.L%,,
~
~
;
Wall (R-19)
Ceiling (R-38)
Baflles
Vapor Barrier: Paint
6 mil black poly in crawl space
DRY WALL NAILING
Wal-s _ ~~~
J~~ ~ j~~ ~
r
Ceiling '
Interior Braced Wall Panels
Garage/House Occupancy Separation
FINAL
Public Works Sign-Off
House Number
Plumbing
Mechanical
Insulation Certificate
Vapor Barrier Paint Certificate
~
Smoke Detectors ~
~
~ f
Deck ~
~
Final - HouseJgarage
Cai148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
r~~nBwu~-0az'~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary. erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca1138S-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see, attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. .All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works auoroval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits eapire if no progress has been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes iq the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4