Loading...
HomeMy WebLinkAboutBLD01-042r • r CITY OF PORT TOWNSEND Wa4nnan & Kale Beading I81 Quhscy 54ee4 Su14 301 Port Townsend, WA 98368 Phone: 360J793308 Fet 360J83-7673 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDO1-O42 Issued: 3115/01 Parcel Number: 948310202 Job Address: 1270 12`h Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 4/2 Nature of Work: New Single-family Dwelling with Attached Garage Owner: James Carlson Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Graveled driveway for construction entrance to prevent soil from being tracked onto City rights- of-way See General Condition Number Z FOOTINGS ///f Setbacks ~Z ~~~~ (~/ Footings Forms Reinforcement Interior Footings P lers ~~~ / v vL FOUNDATION Stem Wall /~// ~1/~ 9 /~1 /'// Forms ~~//( `` ! l Y Reinforcement ( ABWP hold downs @ garage end wall Anchor Bolts w/ 2" x 2" x 3/16" square washers Beam Pockets Vents - 13 typical foundation vents required Crawl Access Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 4 .~ _ Permit#BLDOI-042~~' REQUIRED INSPECTIONS APPROVED/DATF. FLOOR FRAMING Street Development Permit to be issued prior to framing inspection. / NOTE: Engineered joist plan shall be on-site at ~ ~ D ~ / fame of inspection Girders Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets. Treated Wood to Concrete Anchor Bolts & Washers FDN Vents PLUMBING: Rough-In (D-V-T & Clean Outs) i //~~1®t ` Water Supply t~ Hose Bibs (backflow protection required) Pipe Insulation Pressure Reduction Valve if> 80 psi Water Heater I8" A.F.F. Seismic Restraint - 2 places R-10 under Pressure relief valve drain to exterior MECHANICAL Whole House Fan -Utility Room `~~~~~ ~ ~ Source Specific Fan Environmental Air Exhaust ducting, insulation and terminus (located 3' from opening) FRAMING: NOTE: Engineered truss plan shall be on-site at ' L U -( `~Il l time of inspection Walls Alternate Braced Wall Pane( Ceilings Roof Rafter/Truss Positive Connection Attic Venting Posts, beams & headers • t Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~.. ~-`I Li • • Permit # BLDUI-042 RE UIRED INSPECTIONS APPROVED/DATE FRAMING (Continued) Windows Ufactor - .40 max. NFRC sticker shall be on windows at time of inspection Windows -egress Air Seal Fresh Air Intake (Window) Door UFactor -.20 max. (+ one free door) Fire Blocking Weather Resistive Bamer INSULATION =~~~"~ ` ~f Floor (R-30) <.L%,, ~ ~ ; Wall (R-19) Ceiling (R-38) Baflles Vapor Barrier: Paint 6 mil black poly in crawl space DRY WALL NAILING Wal-s _ ~~~ J~~ ~ j~~ ~ r Ceiling ' Interior Braced Wall Panels Garage/House Occupancy Separation FINAL Public Works Sign-Off House Number Plumbing Mechanical Insulation Certificate Vapor Barrier Paint Certificate ~ Smoke Detectors ~ ~ ~ f Deck ~ ~ Final - HouseJgarage Cai148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 r~~nBwu~-0az'~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary. erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S-2294. Measures shall include installation of silt fencing and graveled construction entrance (see, attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. .All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works auoroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits eapire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes iq the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4