Loading...
HomeMy WebLinkAboutBLD01-041City of eon rowmsend Waterman & Katz Building 181 Quincy Street, Port Townsend, WA 98368 (360) 379-3208 Fax (360) 379923 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOl-041R-2 Issued: 09!11(02 Parcel Number: 101341014 Job Address: 792 58'" Street Zoning: RR=II Type: VV=N Totat Occupant Load: N~ Occupancy: R-3/U-1 Nature of Work: Revision #2: Revise st base for new arbor and fence around existin coa ard. Owners: Jeffrey Saeeer & Linda Sullivan Contractor: Owner (206) 789-5992 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEE BLDOl-041R-1 for other insuections for the fence/arbor and BLDOl-041 for the single-family residence. RF,OUIRED INSPECTIONS APPROVED/DATE FOOTINGS Reinforcement -Simpson Post Base AB/ABA with 5/8" threaded rod epoxied to existing concrete with Simpson ET22 FINAL Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BU)(Il-04tR-2 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & IndnsMes contractor's ~~ regLctrstIon number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning rnnstraction; cafi 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheetlng, etc. Soils shall be permanently stsbilihed with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All eleme~s of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are rnmpleted. 6. The Building Department is unable to pass final inspeMfon on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works anoroval must be received urior to schedulia¢ the Bnfidin2 Department's final insnectton. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. ContaM the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SIT'E WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of PoA Townsend Waterman 8c Katz 13uilting 181 Quincy Street, Port Toumsrnd, WA 98368 (360) 379-3208 Fax (360) 379-6923 CITY OF PORT TOWNSEND u i CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-041R-1 Issued: 08/23102- Parcel Number: 101 341 014 Job Address: 792 58'" Street Zoning: RR=II Type: VV=N Total Occupant Load: N/C Occupancy: R-3/U-1 Nature of Work: New arbor and fence around eaistine courtyard. Owners: Jeffrey Saeeer & Linda Sullivan Contractor: Owner (206) 789-5992 GENERAL CONDTTIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Post Footings Reinforcement -Simpson Post Base ABU66 with 5/8" threaded rod epoxied to existing concrete with Simpson ET22 FRANIING All engineered elements require inspection prior to cover Arbor Walls Posts Lag Bolts Bracing FINAL House Numbers - 5" minimum Smoke Detectors throughout existing construction per 1997 UBC Final -Building Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 2 Permit N BI.DOI-041R•1 GENERAL CONDITIONS _ • 1. Contractors working on this project are required to Gave a Labor tit Industries contractor's registration number and s City business Gcensa Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of sik fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. So~7s exposed during wnstruction shall be temporarily stabilized with mulching, plastic sheering, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including asiling, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection caU 3852294. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress bas been made within six months, or if no inspections are done by the Building Department, within erne year. Call for at least one inspection per year to keep your budding permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to malting changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH TILE APPROVED PLANS. u Call 48 boon before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Watamen 83:atzBwlding 181 Qwrcy Stred, Swb 301 Pal Tavmmd, WA98366 Phase: (360) 379-3208 Faz: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-O41 Issued: 3126/01 Parcel Number: 101 341 014 Job Address: 792 58th Street Zoning: RR=II Type: VV=N Total Occupant Load: 3 Occupancy: R-3 Nature of Work: Construct Single family residence Owner: Jeffrey Saeeer & Linda Sullivan Contractor: TBD ****All elements of engineering including holdowns, framing, nailing and other engineered connections require inspection prior to cover**** GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS -Contractor shall offer proof of compliance with State and local licensing 'f/~~~ f~ Setbacks L!/ Footings Forms Reinforcement - #5 Interior Footings - (4) #4 Piers tenor deck Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 1 of 5 Permit p HLD01-061 RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement -per engineered details, sheet A2 7l ~ ~l " i Anchor Bolts & Washers - 5/8" @ 2' o.c. @ WI & W3; 4' elsewhere Engineered Holdowns Vents - 8 required Crawl Access Beam Pockets FLOOR FRAMING NOTE: Engineered TJI floor joist plan to be on-site at time of Inspection ,/ /1 n ?~~~Ql ( (/ Girder l x . Joists Posts - 6 x 6 center post: DF#1 Radiant Heat Tubing Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts and Washers PLUMBING: Rough-In (D-V-T & Clean outs) ~ ~ i ( /',7, , r l~ ~ /~ ~~~ (/ O / V `~ N/ Water Supply ~ Gas Supply Water Hammer Arrestor @ clothes and dishwasher r ` J Q~ ~~j (~ ~ ~ 1 / (S'/o Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above. ground 1 Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 5 Pvmil # BLD01-hll REQiTIRED INSPECTIONS ____ APPROVED/DATE s MECHANICAL Boiler -installation instructions shall be on-site at time of inspection Whole House Fan - F-1 bath Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) / ~Z / O l FRAMING: ~ / ~ S/O~ Walls -engineered panel walls p G~ ~ Engineered Straps & Framing Anchors -Simpson A35 @ 2' o.c.; l6" o.c. @ porch Treated Wood to Concrete Engineered Posts, Beams & Headers Ceiling/Roof -per engineered panel system Roof Positive Connection Roof Venting -where applicable Windows -escape Windows -safety glazing Windows U-factor - .40 or better • NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Wall or Wall Ports required) Doors U-factor - .40 or better Fire Blocking Weather Resistive Barrier / l ~ JZ / D` 66 ` V INSULATION Floor - (R=25) / , , ~/~ ~ ~ - Walls - (R-19: ok per wall panels) L~ (~ ,(~x~y Ceiling - (R-30. ok per roof panels) Y n' Baflles (if applicable) ~©~~ / Yl/ Vapor Barrier required ~ DRY WALL NAILING Walls Ceiling Enclosed Usable Space under Stairs Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 ~auoo~~, FINAL Public Works Sign-Off House Numbers - 5" LPG Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building e~~. ~~ G, ~l~~S~~d 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-ot way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. • 3. Al! elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report coi•reMions are completed. 6. The Building Department is unable to pass final inspection on your.project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aparoval must be received urior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential projeM. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Pamil#BLDO7-041 ' 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • u CaII 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5