Loading...
HomeMy WebLinkAboutBLD01-038Wateman & KetzBUildirg 181 Quincy Slreel, Suite 301 Purl Townsard, WA 98368 Phone: (360)379-37A8 Faz: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaII 385-2294 for Inspection Permit Number: BLDG 1-O38R-2 Issued: 04/30/Ol Parcel Number: 988 802 004 Job Address: 1035 Monroe Street Zoning: RR=II Type: VV=N Total Occupant Load: 6 (basement) Occupancy: R-3 Nature of Work: Revision #2: Revise S wall of basement with LVL beams to suauort eravity loads Owner: Jim and Bonnie Buckley Contractor: Townsend Builders ****All elements of engineering including footings, reinforcing steel, anchor bolts and steel beam connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • FRAMING: 5 '/z" x 5 '/<" LVL Beams (3)'h" lag or through bolts 11': 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Call 48 hours before you dig for utility line locates I-800-424-5555 Page ] of 2 PamiIRBLD01-038R-2 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. - 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep .your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. r, ~J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 181 Quincy Street Suite 301 Post Townsend, WA 98368 Phone (360) 379-3208 (Fax) 385-7675 CITY OF PORT TOWNSEND BUILDER'S PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD01-038R-1 Issued: 3/5101 Parcel # 988802004 Job Location: 1035 Monroe Street Zoning: R_11 'Use/Nature of Work: Demo existing basement & excavate far future basement Owner: Jim & Bonnie Buckley Contractor: Townsend Builders Temporary erosion control and sediment control measures, i.e. silt fencing or straw bale barriers and graveled construction entrance, shall be installed, and inspected prior fo any clearing or grading activity for house site. INSPECTOR TE • Adjacent rights-of--way shall be kept clean of mud and debris. from the site. Failure to comply will result in all work on the site being stopped. • Excavation and grading per scope of work only; future construction activities shall be covered under a separate permit, BLDOl-038. Any change to this proposed schedule shall receive prior approval of fhe Building Official. • Overburden stored on-site shall be covered within fwo days with mulching or plastic covering. If materials are to be exported from the site, contact the Building Department prior to their removal. • Grading activity shall not impact neighboring properties U CITY OF PORT TOWNSEND watan~an ~ KatzHuilding 1 BI Quuxy Street, Suite 301 Pat Tavroend, WA 98368 Phone: (360)379-3208 Fax: (360)383-1675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD01-~38 Issued: 04/04/01 Parcel Number: 988 802 004 Job Address: 1035 Monroe Street Zoning: RR=1I Type: VV=N Total Occupant Load: 6 (basement) Occupancy: R-3 Nature of Work: Construct new basement foundation Owner: Jim and Bonnie Buckley Contractor: Townsend Builders ****All elements of engineering including footings, reinforcing steel, anchor bolts and steel beam connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: . Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site; rights-of--way shall be kept clean of dirt and debris FOOTINGS Setbacks -existing footprint ~/~Q/Q ~ Footings Forms Reinforcement Interi Footings - 4' x 4' x ]2 "with (SJ #4 each way E ~~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pnmit#BL-O1~o38 • REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION 3 © j ~~`~urok~%~'M~~r~f Stem Wall Forms Reinforcement Anchor Bolts & Washers - @ 36" o.c. Waterproofing SLAB R-10 ,, (~ (P/l ~~-( (' I 1 Hydronic Heat Tubing / `"~., PLUMBING: ~lll~ ~~~~~ Or Rough-In (D-V-T & Clean outs) 1 Water Supply (if applicable) ~ ~ DwV Hose Bibs (backflow protection required) ~// /©/ / ` [~(~ Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi MECHANICAL $oiler -installation not included as part of this permit Source Specific Fans Environmental Air Exhaust ducting (w/ backdraR dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: Walls Engineered Steel Beams and Posts Treated Wood to Concrete Engineered Connections Windows -escape Windows -safety glazing (if applicable) Windows U-factor - .70 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Doors U-factor - .40 or better Fire Blocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Pmnit#aLD01-038 RF.niiiRF.D iNSPF.CTiONS APPROVED/DATE INSULATION Slab-(R=10) Walls-(R=19) Vapor Barrier: paint DRY WALL NAILING Walls Ceiling FINAL House Numbers - 5" Plumbing MechanicaVHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building ' ('FNFRAT. ('ONDITION4 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig Tor utility line locates T-800-424-5555 Page 3 of 4 PmnilMHLb01-036 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fors non- residential project. 8. All building permits aspire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval urior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates ~ 1-800-424-5555 Page 4 of 4