HomeMy WebLinkAboutBLD01-037Watrnmn ffi KffizEluiWitp
161 Quinry Stred, Suite 301
PatTamernd, WA 98366
Phone' (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-037R-1 Issued: 10/31/01 Parcel Number: 989711007
Job Address: 1427 Clav Street Zoning: R_H Type: VV=N Occupancy: U-1
Nature of Work: Rebuild flat shed roof with sloue for drainase; aaaly 518" Tvne X sheetrock (1/2"
existing on inside). install skvli2ht in existin¢ attic access ogenina
Owner: Michael Harvev Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be transported to
an approved landfall or other area off-site meeting
all qualifications as set forth by state and local
law
FRAMING
Fireblocking (if applicable)
Weather Resistive Bamer
Sheathing
Roof
Roof Drainage
Skylight
DRYWALL NAILING
5/8" ~ exterior south wall
FINAL
Final -building ,~.t
~ Z117`~
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r~exsrnoio3~tx-~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
rePistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding,
plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. .Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A •
minimum of twenty-four hours notice is reauired. Public Works aauroval must be received
arior to schedulin¢ the Buildin8 Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions
from the Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
Wrtemun&Kalz BuiMing
18I Quinry Steel a•`n. 301
Port 7awiuend, WA 98368
PMne: (360) 379-3208 Fu: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $I,D~1-~37 Issued: 06/20/01 Parcel Number: 989711007
Job Address: 1427 Clay Street Zoning: RR=II Type: V_N Occupancy: U-1
Nature of Work: Demolish Shed sable roof; aaaly 5/8" Tvue X sheetrock (1/2" existin¢ on inside).
weather barrier and sidin¢ on south wall to establish 1-hour wall due to proximity
to grOperty line
Owner: Michael Harvey Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLTfION
Materials from demolition shall belransported to
an approved landfill or other area off-site meeting
all qualifications as set forth by state and local
Imv
FRAMING
Fireblocking (if applicable)
Weather Resistive Barrier
Sheathing
DRYWALL NAILING
5!8" @ exterior south wall
FINAL
Revision to permit for reconstruction of roof
required prior to final inspection approval
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit#BLIb]-037
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding,
plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
.adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department. is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reauired. Public Works aoaroval must be received
prior to scheduling the Building Denartment's final insnection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions
from the Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 2 of 2