HomeMy WebLinkAboutBLD01-036Wakmun & Katz Building
181 Quincy Street Sulk 301
PoH Townsend, W A 98368
P}wne: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
T$IS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BI-~D~1-~36
Job Address: 1243 Tremont Street
Total Occupant Load: add 1
Issued: 03/15/01 Parcel Number: 936300803
Zoning: RR=II Type: VV=N Occupancy: UU=1
Nature of Work: Enlarge attached ¢araee
Owner: John Edwards Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• RE UIRED INSPECTIONS
C,
J
APPRnVF.D/nATF.
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2; existing driveway okay
for graveled construction entrance
FOOTINGS ~~~~ ~ ,G~
Setbacks ~D~
~ ~
Footings
Forms
Reinforcement
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts
Engineered Holdowns - PAHD42 or HTT22
Page t of 3
Pemtit #BLDOI-036
REQUIRED INSPECTIONS APPROVF'n/)nATF.
FRAMING: - ----- -- ---- -
Walls
Ceiling
Roof ~~~A~~ ~'
Rafter Positive Connection
~A7`lP1i~ ~~~D1~
Weather Resistive Barrier rl r r~ ~ /
l f J V v
FINAL
House Numbers -check for 5"
Smoke Detectors per 1997 UBC -one in each sleeping
room and in each area leading to sleeping rooms with a
f ~/ ~~
minimum of one on each Jloor %
Final -Building ///
I. Contractors working on this project are required to have a Labor & Industries contraMor's recistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
scheduline the Buildine Deuartment's final insuection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections sre done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
Page 2 of 3
Permit #BLDOI-036
• 9. Revisions require submittal and approval arior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Page 3 of 3
•