Loading...
HomeMy WebLinkAboutBLD01-036Wakmun & Katz Building 181 Quincy Street Sulk 301 PoH Townsend, W A 98368 P}wne: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD T$IS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BI-~D~1-~36 Job Address: 1243 Tremont Street Total Occupant Load: add 1 Issued: 03/15/01 Parcel Number: 936300803 Zoning: RR=II Type: VV=N Occupancy: UU=1 Nature of Work: Enlarge attached ¢araee Owner: John Edwards Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • RE UIRED INSPECTIONS C, J APPRnVF.D/nATF. TEMP EROSION & SDM'T CONTROL See General Condition No. 2; existing driveway okay for graveled construction entrance FOOTINGS ~~~~ ~ ,G~ Setbacks ~D~ ~ ~ Footings Forms Reinforcement UFER FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts Engineered Holdowns - PAHD42 or HTT22 Page t of 3 Pemtit #BLDOI-036 REQUIRED INSPECTIONS APPROVF'n/)nATF. FRAMING: - ----- -- ---- - Walls Ceiling Roof ~~~A~~ ~' Rafter Positive Connection ~A7`lP1i~ ~~~D1~ Weather Resistive Barrier rl r r~ ~ / l f J V v FINAL House Numbers -check for 5" Smoke Detectors per 1997 UBC -one in each sleeping room and in each area leading to sleeping rooms with a f ~/ ~~ minimum of one on each Jloor % Final -Building /// I. Contractors working on this project are required to have a Labor & Industries contraMor's recistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduline the Buildine Deuartment's final insuection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections sre done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. Page 2 of 3 Permit #BLDOI-036 • 9. Revisions require submittal and approval arior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Page 3 of 3 •