CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD01-O33 Issued: 03/14101 Parcel Number: 985210103 & -501
Job Address: 1996 Walnut Street Zoning: R_=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 1416 Nature of Work: Construct Single-family Dwelling with earase
Owner: Michael & Trish Cobb Contractor: Terhune Homes, Inc. ~ L ~ icfi~GA
360-697-7000
GENERAL CONDITIONS APPLY: See last aaQe 1~15/~Ol
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: All engineered details require inspection prior to cover
RF.(1TTTRRT) TNCPFCTTfINS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition f#2
Graveled constnaction entrance required to prevent
dirt and sediment from leaving the site
FOOTINGS
Setbacks -see attached shoreline exemption
~ /~jr
Footings ~- y/ L~
Forms
Reinforcement
Interior Footings
Porch/Deck Piers
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
Building Pemtit k01-033
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
/ / )
/
Reinforcement ~
~
(.~(/ r
/
Anchor Bolts & Washers (
Vents - 22 required
Crawl Access
Beam Pockets
Engineered Holdowns
~
'
~
vtu~'Ic~r-~,+~ p~-~~ -
,~
~f~1
FLOOR FRAMING
NOTE: Engineered LPI joist plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestor
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
18" A. F. F.
R-l0 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
Ca1148 hours. before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Pemtit #01-033
RE UIRED INSPECTIONS APPROVED/DATE
MECHANICAL
Weed~Fireplace Z(~ ~s -See ~~~1-1 z-J
Heat Pump - HSPF =h 6.8; COP =h 3.0
Ducts & duct insulation (supply and return air ducts
R-8; supply ducts in conditioned space R-4)
Whole house ventilation
Integrated system
8" minimum smooth duct (9" min. flex)
Automatic (electric) damper -certification from
installer required at final
Source Specific Exhaust Fans @ bathrooms (SOcfin),
kitchen (100 cfm) and utility room (50 cfin)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING -Street and Utility Permit required prior to
framing inspection ~~' a
~~ ~~ ~' °>
UUU
Walls t
Engineered Shear Walls
Roof -engineered truss plan to be on-site at time of ~ ~
Inspection
Rafter/truss positive connection
Attic venting - 1 sq. ft. per 150 sq. ft. of area vented
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .65 or better
NFRC sticker must be on windows & skylights at time of
inspection
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-19 required)
Walls (R-19 including garage/house common wall) / ~y/ ^ /l
Jy
I ZI t ~C
if
/ /
Ceiling (R-30) ~ t
"
l
BatlTes
Vapor Bazrier -vapor barrier paint
6 mil black poly in crawl space -seams lapped 12"
Ca1148 hours before you dig for utility tine locates
1-800-424-5555
Page 3 of 5
Building Permit #O1-033
REQUIRED INSPECTInNS APPRf1VFntnATF
DRYWALL NAILING
Walls
Ceiling
Garage/House Occupancy Separation
Enclosed Usable Space under Stairs ,
DRAINAGE
Per attached approved plan
FINAL
Prior to final, an approved replanting plan
associated with ESA waiver request shall be ~ J
submitted reviewed and approved by Building and I
Community Development.
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
MechanicaVHeating
Fresh air certification from installer
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
-Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing
-and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc.. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 4 of 5
Building Permit it01-033
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. Far Public Works inspection call 385-2294. A
minimum of twenty-tour hours notice is required. Public Works approval must be received prior
to schedulin¢ the Buildine Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555