CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOl-032 Issued: 03/09/01
Job Address: 639 Memory Lane Zoning: RR=H
Nature of Work: Reuair Patio Roof
Owner: Joseph Bozak
379-6618
Parcel Number: 932400012
Type: V_N
Occupancy: RR=3
Contractor: Owner
GENERAL CONDTITONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
•
RAMING/FINAL -Inspections may be done at same
time if all elements of construction are available for
inspection
Setbacks -existing Patio
Positive Connection @ Post Base
Treated Wood to Concrete
Ledger
Rafters (existing)
Blocking
Positive Connections @ Post Top
House Numbers -check for 5" numbers
Smoke Detectors throughout existing house, see 1997 UBC
Final -Building
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
vmricfBiiwi-mz
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aonroval must be received nrior to
__~.va..r..~ she R..:Id:.... 71e.....rt...e..Pc 6..01 :..e.,vet:....
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
S. All building permits ezpire if no progress has been made within siz months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555