Loading...
HomeMy WebLinkAboutBLD01-032Waterman & Katz Building 78I Quinry 8tree1, Suite 30I Pat Towiceend WA %368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-032 Issued: 03/09/01 Job Address: 639 Memory Lane Zoning: RR=H Nature of Work: Reuair Patio Roof Owner: Joseph Bozak 379-6618 Parcel Number: 932400012 Type: V_N Occupancy: RR=3 Contractor: Owner GENERAL CONDTITONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 • RAMING/FINAL -Inspections may be done at same time if all elements of construction are available for inspection Setbacks -existing Patio Positive Connection @ Post Base Treated Wood to Concrete Ledger Rafters (existing) Blocking Positive Connections @ Post Top House Numbers -check for 5" numbers Smoke Detectors throughout existing house, see 1997 UBC Final -Building • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 vmricfBiiwi-mz 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aonroval must be received nrior to __~.va..r..~ she R..:Id:.... 71e.....rt...e..Pc 6..01 :..e.,vet:.... 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. S. All building permits ezpire if no progress has been made within siz months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2