HomeMy WebLinkAboutBLD01-031! ~
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Watemun ffi KmzBuilding
187 Quincy Sfree4 Suite 301
Pml Townmd, WA 98368
Phone: (360) 3793208 Faz: (360) 3B5-M75
CITY OF PORT TOWNSEND
Permit Number. $LDO1-O31 Issued: 03/14/01 Parcel Number: 948-310-201
Job Address: 1203 13th Street Zoning: R-II Type: V_N Occupancy: R-3
Nature of Work: Construct unheated enclosed aorch and sunroomldinin¢ area
Owner: Alan Dunham
ContraMor: Rav Weber.
GENERAL CONDTI'IONS APPLY -SEE LAST PAGE
RF.nTTTRF.T) TNCPF,CTTnN4
APPRnVF,D/DATE
TEMPORARY EROSION &
SEDIMENT CONTROL
See General Condition No 2, install on-site
as needed during construction -okay to use
existing driveway as construction entrance
FOOTING
Setbacks 3/ZZ~r~ /a/J
~/
Footings
Forms
Reinforcement
~~
FOUNDATION
CMU Stem Wall ~/~ ~~~/
Forms
Reinforcement
FLOOR FRAMING
,,~
~
~
~ ~
Joists '
~ ~ ~
~~'
Blocking
Positive Connections
Treated Wood to Concrete
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 1 of 3
Pemut M BI.DOI-031
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls
~~ I~
Ceiling ~
r
Roof
Blocking
Positive Connections
Fire Blocking
Weather Resistive Barrier
FINAL
House Numbers -check for 5"
/„
~ ~~
Smoke Detectors in existing house per 1997 ~
y' `y'
UBC; one in each sleeping room and in
each area leading to sleeping room with a
minimum of one on each floor
Final -Building
GENERAL CONDTITONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site snd inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulint=. the Buildine Department's final inspeMion.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Prnnit 8 BLDG]-031
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
f
~~