CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O29R-1 Issued: 3/20101 Parcel Number: 988 800 806
Job Address: 877 Monroe Street Zoning: RR=II Type: VV=N Total Occupant Load: 513
Occupancy: R-3 /U-1 Nature of Work: Revision #1: Construct Detached Garaee
Owner: Harold Purcell
Contractor: L. D. Richert Construction, Inc.
****All elements of engineering including holdowns, framing, nailing and other
engineered connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~ ~J
~ ~ ~/,~a/ / ~/
Footings v~ fill//
Forms
Interior Footings
R ' ement
~~
~
a
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
Pemvt#HLI701-029R-1
RE UIRED INSPECTIONS
APPROVED/DATE
FOUNDATION
Stem Wall
Forms
~ /
l
Reinforcement ~
~~
_~
/ G/
Anchor Bolts & Washers - @ 36" o. c. per detail, sheet 9 /
Engineered Holdowns
SLAB
Reinforcement
Engineered Holdowns
FLOOR FRAMING
NOTE: Engineered BCI jloor joist plan to be on-site at time of
inspection
Joists
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
Engineered Straps and Holdowns
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
MECHANICAL
Whole House Fan - F-2 bath
Environmental Air Exhaust ducting (w! backdraR dampers},
insulation (R-4) and terminus (located 3' from opening)
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 4
Permit N BL7701-029R-1
REOUiRED INSPECTIONS APPROVED/DATE
FRAMING:
Walls
Engineered shear walls
Treated Wood to Concrete ~~~~`
Engineered Posts, Beams & Headers
Ceiling/Roof
Rafter Positive Connection
Roof Venting -ridge & eave
Windows -escape
Windows -safety glazing
Fire Blocking
Weather Resistive Barrier
7 ~J
INSULATION
Can verify insulation values, air seal, vapor barrier, etc. for future
living space
DRY WALL NAILING
Walls
Ceiling
GaragelHouse Occupancy Separation
FINAL L-i " • G . ~~n/~9 ~ `f~1~01i
Plumbing `/
MechanicaVHeating
Insulation Certificate
Vapor Barrier Paint Certificate ~/
tO~~~Q7 I//
~L
Smoke Detectors ~
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contraMor's reeistration
number and a City business license. Failure to provide proo! of this documentation prior to work may
result in job shut down while this is accomplished.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. Ati elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your.
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
walmnan s x.~ewla~
IHI Qw~uy SYttI, S~o4 30l
Port TowvenQ WA 93368
Phone: (360)3793208 Fax: (360)385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaU 385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLDO1-O29 Issued: 3/19!01 Parcel Number: 988 800 806
Job Address: 877 Monroe Street Zoning: RlII Type: VV=N Total Occupant Load: 5/3
Occupancy: R-3 lU-1 Nature of Work: Construct Sinele family residence with attached earaQe
Owner: Harold Purcell
Contractor: L. D. Richert Construction, Inc.
****All elements of engineering including holdowns, framing, nailing and other
engineered connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~~~ 3~~ /rl/J
(
f/
Footings 7
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
Ca1148 hours before you dig for utility line locates
I-800-424-5555.
Page 1 of 4
REQUIRED INSPECTIONS
APPROVED/DATE
Permit A BI.D01-029
FOUNDATION -foundation details, sheet 2 of plans "
Stem Wall
Forms
Reinforcement ~'~~~Dv `
`~
Anchor Bolts & Washers - @ 36"and 16" o. c. per details, sheet
2 of plans
Vents -12 required
Crawl Access
Beam Pockets
Engineered Haldowns
FLOOR FRAMING
NOTE: Engineered BCI floor joist plan to be on-site at time of
inspection
Joists
Girders
Cripple Wall -shear wall per engineering, detail #4, sheet 2
Radiant Heat Tubing
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts and Washers - 36" & 16" o. c.
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Boiler -installation instructions shall be on-site at
Cj~~
/
time of inspection ~O
//
Whole House Fan - F-2 bath
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from opening)
Ca11 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~~ a etno~m~
REQUIRED INSPECTIONS APPROVED/DATE
RAMING:
~
Walls
Engineered shear walls ~
~I ~~~, / ~
~~
Treated Wood to Concrete `
Engineered Posts, Beams & Headers
CeilingBoof-engineered truss plan shall be on-site at time
of inspection
Rafter/Truss Positive Connection
Roof Venting -ridge & eave
Windows -escape
Windows -safety glazing
Windows U-factor - .65 or better
NFRC window sticker must be on windows and doors
at inspection time
Air Seal
Fresh Air Intake (Wall Ports)
Doors U-factor - .40 or better
Fire B-ocking
Weather Resistive Barrier ~ B~
INSULATION
Floor - (R_] 99 )
Walls-(R~19)
Ceiling - (R=30 )
Baffles
Vapor Barrier: paint
b mil black poly in craw] space
DRY WALL NAILING
Walls
Ceiling
FINAL
Public Works Sign-Off
House Numbers - 5"
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Bamer Paint Certificate
Smoke Detectors
~
Final -Building ~ C
~
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
.,
Permit#BLiJOI-029
I. Contractors working on this project are required to have a Labor & Industries contraMor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels.
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Cafl for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4