Loading...
HomeMy WebLinkAboutBLD01-028Waterman & Katz Building 181 ~i^'d' Street, Suite 301 Pm[TOwtuend WA98368 Phox: (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-O2$R-1 Issued: 412101 Parcel Number: 985210102 & -104 Job Address: 2020 Walnut Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Nature of Work; Revision #1: foundation for addition changed from monolithic Dour to footing and stemwall. Owner: Ken and Cynthia McBride GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 FOOTINGS/FOUNDATION See original plans and building permit/inspection record Contractor: Cavette Construction Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Pemvt flBLDD1~28R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's revstration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirk debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection call 385-2294. A • minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildine Departments final inspection. 7. Final Inspections are required prior to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2 Waterman and Katz Building 181 Quincy Street Suite 301 PM Townsen4 WA 98368 Phone (360) 379.3208 Fax (360) 385-7675 CITY OF PORT TOWIVSEND u • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 far Inspection Permit Number; $LD01-~2g Issued: 03/12/01 Parcel Number: 985210102 & -104 Job Address; 2020 Walnut Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: add 2/3 Nature of Work: SF Residential Addition & Attached Garase Owner: Ken and Cynthia McBride Contractor: Cavette ConstruMion GENERAL CONDTI`IONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION CONTROL See General Condition #2 Graveled driveway for construction entrance to prevent soil from being tracked onto City rights-of--way FOOTINGS Setbacks , ~Z. ~i~( Footings Forms Reinforcement Y~~/ FOUNDATION // ?] ~~ ` Stem Wall ~ Forms Reinforcement Anchor Bolts & Washers Alternate Braced Wall Panels Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #BLDOI-02g RE UIRED INSPECTIONS APPROVEDlDATE FLOOR FRAMING -Engineered BCI plan to be on-site at time of inspection Joists Blocking Positive Connection Treated Wood to Concrete Anchor Bolts and Washers PLUMBING UiU,Q~,6~~1f ~~~ `l ~-- ~ l Z Rough-In (D-V-T & Clean Outs) Water Supply Pipe Insulation (R-3) Water Hammer Arrestor @ clothes washer Hose Bibbs (backflow protection required) Pressure Reduction Valve if pressure > 80 psi Water Heater Seismic Straps @ 1/3 points R-10 Under Pressure Relief Valve Drain to outside, elbow dowry terminate 6" - 24" above grade MECHANICAL Source Specific Fan CIl ~ 0 ~ Whole House Fan -master bath ~ (( Ducts & Duct Insulation -heating ducts in unconditio»ed space: R-8 Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from o enin s FRAMING: Walls ~'~ ~/~ ,}~ Alternate Braced Wall Panels [ l~ Ceilings Roof Attic Venting -ridge & eave Window -escape Window U-factor:.36 or better, NFRC sticker on windows and skylights (.58 or better U factor) at time of Inspection Window -safety glazing Air Seal Fresh Air Intake -integrated Rafterlfruss Positive Connection Fire Blocking Weather Resistive Barrier J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Pmnil #BLDOl-02g RE UIRED INSPECTIONS APPROVED/DATE L J INSULATION ,~/ Floor - (R-30) 7 ~Jy ~U 6 Walls - (R-2I) Ceiling - (R-3 8) Baffles Vapor Barrier -paint DRYWALL NAILING Walls ~~,5/ Ceiling ~ Garage/House Occupancy Separation FINAL House Numbers - 5" minimum ~ ~ 7/J/ ~ Plumbing Mechanical -certification for fresh air Smoke Detectors throughout existing construction per 1997 UBC; battery powered okay / Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit NBLD01-02g 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's Snal inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within ane year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 Brior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 4 of 4