HomeMy WebLinkAboutBLD01-028Waterman & Katz Building
181 ~i^'d' Street, Suite 301
Pm[TOwtuend WA98368
Phox: (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-O2$R-1 Issued: 412101 Parcel Number: 985210102 & -104
Job Address: 2020 Walnut Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Nature of Work; Revision #1: foundation for addition changed from monolithic Dour to footing and
stemwall.
Owner: Ken and Cynthia McBride
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
FOOTINGS/FOUNDATION
See original plans and
building permit/inspection record
Contractor: Cavette Construction
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Pemvt flBLDD1~28R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's revstration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shalt include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirk debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection call 385-2294. A •
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Buildine Departments final inspection.
7. Final Inspections are required prior to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
Waterman and Katz Building
181 Quincy Street Suite 301
PM Townsen4 WA 98368
Phone (360) 379.3208 Fax (360) 385-7675
CITY OF PORT TOWIVSEND
u
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 far Inspection
Permit Number; $LD01-~2g Issued: 03/12/01 Parcel Number: 985210102 & -104
Job Address; 2020 Walnut Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: add 2/3 Nature of Work: SF Residential Addition & Attached Garase
Owner: Ken and Cynthia McBride Contractor: Cavette ConstruMion
GENERAL CONDTI`IONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMPORARY EROSION CONTROL
See General Condition #2
Graveled driveway for construction entrance to prevent
soil from being tracked onto City rights-of--way
FOOTINGS
Setbacks ,
~Z. ~i~(
Footings
Forms
Reinforcement
Y~~/
FOUNDATION // ?] ~~
`
Stem Wall ~
Forms
Reinforcement
Anchor Bolts & Washers
Alternate Braced Wall Panels
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #BLDOI-02g
RE UIRED INSPECTIONS APPROVEDlDATE
FLOOR FRAMING -Engineered BCI plan to be on-site
at time of inspection
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts and Washers
PLUMBING UiU,Q~,6~~1f ~~~ `l ~-- ~ l
Z
Rough-In (D-V-T & Clean Outs)
Water Supply
Pipe Insulation (R-3)
Water Hammer Arrestor @ clothes washer
Hose Bibbs (backflow protection required)
Pressure Reduction Valve if pressure > 80 psi
Water Heater
Seismic Straps @ 1/3 points
R-10 Under
Pressure Relief Valve Drain to outside, elbow dowry
terminate 6" - 24" above grade
MECHANICAL
Source Specific Fan
CIl ~
0 ~
Whole House Fan -master bath ~
((
Ducts & Duct Insulation -heating ducts in unconditio»ed
space: R-8
Environmental Air Exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (located 3' from
o enin s
FRAMING:
Walls
~'~ ~/~ ,}~
Alternate Braced Wall Panels [ l~
Ceilings
Roof
Attic Venting -ridge & eave
Window -escape
Window U-factor:.36 or better, NFRC sticker on
windows and skylights (.58 or better U factor) at time
of Inspection
Window -safety glazing
Air Seal
Fresh Air Intake -integrated
Rafterlfruss Positive Connection
Fire Blocking
Weather Resistive Barrier
J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Pmnil #BLDOl-02g
RE UIRED INSPECTIONS
APPROVED/DATE
L J
INSULATION ,~/
Floor - (R-30) 7
~Jy ~U 6
Walls - (R-2I)
Ceiling - (R-3 8)
Baffles
Vapor Barrier -paint
DRYWALL NAILING
Walls
~~,5/
Ceiling ~
Garage/House Occupancy Separation
FINAL
House Numbers - 5" minimum ~ ~
7/J/ ~
Plumbing
Mechanical -certification for fresh air
Smoke Detectors throughout existing construction per
1997 UBC; battery powered okay /
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 3852294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit NBLD01-02g
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's Snal inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within ane year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 Brior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 4 of 4