Loading...
HomeMy WebLinkAboutBLD01-025Waterman & Katz Building 181 Quincy SL, Suile 301 Pori Tow~aend, WA 98368 Phone (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOl-0258-1 Issued• 02/22/Ol Parcel Number: 958501201 Job Address: 2135 San Juan Avenue Zoning: RR=II Type: N/C Occupancy: N/C Total Occupant Load: No Change Nature of Work: Reinforce Church Roof with 2" a 8" rafters Owner: Evangelical Methodist Church Contractor: Richard O'Connor GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(1TTTRF.T) TNSPFCTTnNS APPROVED/DATE FRAMING Rafters Blocking Positive Connection FINAL See original inspection record Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to heginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Call 48 hours before you dig for utility tine locates 1-800-424-5555 Page 1 of 2 Pemtit#BLDOI-025R-1 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has beep made within siz months, or if no inspections are done by tfie Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Cal{ 48 hours before you dig for utility fine locates I-800-424-5555 Page 2 of 2 1' s ~_ Waterman & Kaatz Buil&ng 181 Quincy St, Suite 301 Prnt Townsend, WA 98368 Phone (360)379-3208 Faz: (360)383-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-025 Issued: 02(12101 Parcel Number: 958501201 Job Address: 2135 San Juan Avenue Zoning: RR=II Type: N/C Occupancy: N/C Total Occupant Load: No Chanee Nature of Work: Tear otf and Replace Church Roof Owner: Eyaneelical Methodist Church Contractor: Richard O'Connor GENERAL CONDITIONS APPLY -SEE LAST PAGE 'Repair/replacement of roof structural members (e.g., roof rafters, joists, truss system, etc. requires revision to this permit REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All constnaction debris to be deposited in Jefferson County Landfill per plans or other location in accordance with all local, state and federal laws. SHEATHING Plywood sheathing requires 8d @ 6" o.c edges & 12" o.c. field or 1 '/<" staples @ 6" o.c. edges and field ROOF VENTING Net free ventilating area shall not be less than 1 square foot per 150 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate maybe reduced to 1 square foot of venting to 300 square feet of azea vented. Openings shall be covered with corrosion resistant '/4" mesh. ROOFING Install all roofing materials per manufacturer's specifications and UBC Chapter 15. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemdt #BLD02-025 FINAL Check for 5" Building Numbers Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted required inspections. 5. Re-inspeMion is required afrer inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works aaaroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. s Call 48 hours before you dig for utility tine locates 1-800.424-5555 Page 2 of 2