CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOl-0258-1
Issued• 02/22/Ol
Parcel Number: 958501201
Job Address: 2135 San Juan Avenue
Zoning: RR=II Type: N/C
Occupancy: N/C
Total Occupant Load: No Change Nature of Work: Reinforce Church Roof with 2" a 8" rafters
Owner: Evangelical Methodist Church Contractor: Richard O'Connor
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TTTRF.T) TNSPFCTTnNS APPROVED/DATE
FRAMING
Rafters
Blocking
Positive Connection
FINAL
See original inspection record
Final -Building
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a Ciri business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to heginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility tine locates
1-800-424-5555
Page 1 of 2
Pemtit#BLDOI-025R-1
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3.
A minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has beep made within siz months, or if no inspections are
done by tfie Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Cal{ 48 hours before you dig for utility fine locates
I-800-424-5555
Page 2 of 2
1'
s
~_
Waterman & Kaatz Buil&ng
181 Quincy St, Suite 301
Prnt Townsend, WA 98368
Phone (360)379-3208 Faz: (360)383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOl-025 Issued: 02(12101 Parcel Number: 958501201
Job Address: 2135 San Juan Avenue Zoning: RR=II Type: N/C Occupancy: N/C
Total Occupant Load: No Chanee Nature of Work: Tear otf and Replace Church Roof
Owner: Eyaneelical Methodist Church Contractor: Richard O'Connor
GENERAL CONDITIONS APPLY -SEE LAST PAGE
'Repair/replacement of roof structural members (e.g., roof rafters, joists,
truss system, etc. requires revision to this permit
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All constnaction debris to be deposited in Jefferson
County Landfill per plans or other location in
accordance with all local, state and federal laws.
SHEATHING
Plywood sheathing requires 8d @ 6" o.c edges & 12"
o.c. field or 1 '/<" staples @ 6" o.c. edges and field
ROOF VENTING
Net free ventilating area shall not be less than 1 square
foot per 150 square feet of the area of the space
ventilated, unless 50% of the required vent opening area
is provided in the upper portion of the roof and therefore
the rate maybe reduced to 1 square foot of venting to
300 square feet of azea vented. Openings shall be
covered with corrosion resistant '/4" mesh.
ROOFING
Install all roofing materials per manufacturer's
specifications and UBC Chapter 15.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemdt #BLD02-025
FINAL
Check for 5" Building Numbers
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed
prior to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
required inspections.
5. Re-inspeMion is required afrer inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
A minimum of twenty-four hours notice is required Public Works aaaroval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
s
Call 48 hours before you dig for utility tine locates
1-800.424-5555
Page 2 of 2