Loading...
HomeMy WebLinkAboutBLD01-024 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 38 5-2 294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLDO1-O24 Issued: 02/14/01 Parcel Number: 955900098 Owner/ContraMor: Hamilton Heiehts LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lot 98: 2697 Crest Avenue Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 512 Nature of Work; Set Manufactured Home w/ attached site-built aaraae GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7.•30 a.rrz to 6: 00 p.m. Monday through Friday and prohibited on weekends and national holidays*** REQUIRED INSPECTIONS Budding and Convnunity Developrtwd Waterman & Katz Buildi~ 181 Quincy Stied Suite 301 Port Townsend, WA 98368 Phone: (360)379.3208 Fax: (360)383-7675 APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See details attached toMIP and general condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE Setbacks ~~Z/~ Forms Monolithic Slab/Foundation (garage) ~/~D~~~ Reinforcement Anchor Bolts Alternate Braced Wall Panel Holdown Hardware Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pmnit # BLD01-024 , nr, u1rc~U 1Nar~t;11VIVJ AYYRV VEll/llATE PLUMBING (prior to skirting) Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. ~/l s~~~ '/."diameter, same as supply pipe r Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS mimrtes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. %. "per foot MECHANICAL (prior to skirting) Ducts & Duct Insulation 3/1$~g~ ~Q Dryer Exhaust -vented to outside. Extension into crawl space ~( requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed I4' w/ 2-90° elbows FLOOR FRAMING (prior to skirting) Anchors ~ /~" Steel Support Piers -Load-stamped and installed per ~ ~ t manufacturer's installation manual; clearance of I8"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation marmal specifies; otherwise area around home graded to provide runoff away from home FRAMING: Engineered roof truss plan to be on-site at time of inspection /~ Walls / Alternate Braced Wall Panels c Header Roof Garage/House Attachment DRY WALL NAILING Garage/House Occupancy Sepazation w/20 minute self-closing door Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~~ '^'~ . _ ~_~_ ~ ~! ~ i _ _ ll ~_~~. Permit # BLIl01-024 • FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number - 5" numbers Plumbing Mechanical Final -Building No holes or gaps greater than '/, "allowed in skirting. Skirting to be rated for contact with earth if backf 11 is involved. Crawl space ventilation per installation marmal @ I sq. ft./ISO sq. ft. (16 req'd.); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18" x 24" unless specifred otherwise; covered with vinyl, pressure-treated wood or metal. GENERAL CONDTI'IONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP} require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Permit # HLDOl-024 ' 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion call 3852294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4