CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-OZZ Issued: 3/09(01 Parcel Number: 985 207 301
Job Address: 2134 Cherry Street Zoning: RR=II Type: VV=N Total Occupant Load: 312
Occupancy: R-3 /U-1 Nature of Work: Construct Single family residence with attached garage
Owner: Stephen Liebertz
Contractor: Seraphim Construction, Inc.
****All elements of engineering including holdowns, framing, nailing and other
engineered connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
• Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTIRF,n TNSPF,CTTONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Siit Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
Porch Piers
LIFER
CJ
Cal[ 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
Permit#BLDOI-022 -~
ur,nrlrRFn nvcpF.("r'rnN~ APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Engineered Holdowns
Engineered Retaining Walls
FLOOR FRAMING
NOTE: Engineered BCI floor joist plan to be on-site at time of
inspection
Joists
Radiant Heat Tubing
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
Anchor Bolts and Washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
18" A. F. F.
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Boiler -installation instructions shall be on-site at
time of inspection
Whole House Fan -master bath
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and' terminus (located 3' from opening)
J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of J
r~ a acDOi-on
C~
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING:
Walls -engineered shear walls
Engineered Porch
Treated Wood to Concrete
Engineered Posts, Beams & Headers
Ceiling/Roof -engineered BCI rafter plan shall be on-site at time
of inspection
Rafter Positive Connection
Roof Venting -ridge & eave
Windows -escape
Windows -safety glazing
Windows U-factor - .45 or better
NFRC window sticker must be on windows and doors
at inspection time
Air Seal
Fresh Air Intake (Wall Ports)
Doors U-factor - .40 or better
Fire B-ocking
Weather Resistive Barrier
INSULATION
Floor - (R=25 )
i Walls - (R_l9 )
Ceiling - (R-30 vault )
Baffles
Vapor Barrier: paint & backed Batts
DRY WALL NAILING
Walls
Ceiling
GaragelHouse Occupancy Separation
Enclosed Usable Space under Stairs
FINAL
Public Works Sign-Off
House Numbers - 5"
LPG
Plumbing
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
r~~ae7.mimz ~
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
. .. ~. e____ ~_..-.. .....:..e :~ ..e.....red P..hl;r Wnrlcc annrnval must he reeelVed Ur10r t0
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555