HomeMy WebLinkAboutBLD01-020Waterman and Katz Building
181 Quincy Street Suite 301
Port Tow~end, WA 98368
Pfwme (360) 379-3208 Fax (360) 383.7675
CITY OF PORT TOWNSEND
u
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O2O Issued: 2/01101 Parcel Number: 989-713-201
Job Address: 1310 Clay Street Zoning: R-III Type: VV=N
a
Occupancy: RR=3 Total Occupant Load: N/C
Nature of Work: Add bathroom to existine bed and breakfast unit
Owner: John Eisin2er Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTI'S REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.Oi1iRED INSPECTIONS
APPROVED/DATE
PLUMBING
Rough-In (drains, vents, traps and clean outs) ~//~//j}'
v
Water Supply ` (
l
Pipe Insulation (R-3)
Pressure Reduction Valve in > 80 psi
MECHANICAL
Bathroom Fan n n
,3~ l~/~ ('
l/
Environmental Air Exhaust ducting (w/ backdraft mi
damper), insulation (R-4) and terminus (located 3'
from openings)
FRAMING _A
Walls ~~/ ~
~!
Door Threshold
Fire Blocking
CaII 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #BI.D01-020
Y
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION
Fill exposed exterior wall cavities ~ ~S /,„,, „f1
f (~'( ('~-/
DRYWALLNAII.ING /
Walls 3/r3
~
r
FINAL
House Numbers -check for S"numbers
Smoke Detectors throughout
Final -Plumbing
Final -Mechanical
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior t~
work may result in job shut dawn while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed oo-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing snd
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering' including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Permit pBI,D01-020
• 8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
4. Revisions require review and approval prior to malting changes in the field. Contact the Building
Department at 379-5086 nrior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED.PLANS.
•
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 3 of 3