Loading...
HomeMy WebLinkAboutBLD01-018Waterman and Katz Building 181 Quirwy Sired Suite 301 Pmt Townttnd, WA 98368 Plwne (360)379-3208 Faz (360)383-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-O18 Issued: 2101/01 Parcel Number: 989-700-401 Job Address: P.T.O.T. Block 4, lots 1-6 Zoning: C-III Type: VV=N Occupancy: U,=1 Total Occupant Load: N/C Nature of Work:ConstruM temaorarv shed roof building to finish (3) small Wooden Boat Foundation boats Owner: Northwest Maritime Center Contractor: Same as Owner GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: • Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Temporary structure to be removed within 6 weeks of date of permit issuance 2/1/01 - 3/15/01 FRAMING/FINAL Pier Blocks Walls Posts and Headers Roof Positive Connection Blocking Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Pemdt #BI,DOI-018 r~JJ ~J GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re>iistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval Qior to making changes in the field. Contact the Building Department at 379-5086 arior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 2 of 2