Loading...
HomeMy WebLinkAboutBLD01-017Waterman & Kati HsiWing 181 QuLm:y 8tree4 8ufte 301 Port Toxnrend~ WA 98368 Phone: 360379-5086 Faa 360385-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-O17R-1 Issued: 06/29/01 Parcel Number: 951900002 Job Address: 2501 Cook Avenue Zoning: K=I Type: V=N Occupancy: R-3/U-1 Total Occupant Load: 812 Nature of Work: Chanee earase storaee to heated studio. Owner: James T. and Marleen M. Yelaca Contractor: Same as Owner ~~a V ~D GENERAL CONDITIONS APPLY: See last page T ~~ l ~xP%/?.~ +~ 7~~/ SEPARATE PERMITS REOUH2ED: i 2 ~ ~r ~ 1~~ Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspectton time Girders Joists Blocking ~ q~ FRAMING ~ Walls Z /~ /~ /J / Alternate Braced Wall Panels at garage l ` ( / Roof -engineered truss plan to be on-site at time of % Inspection Rafter/truss positive connection Attic venting - eave and gable end Posts, beams and headers Window U-factor - .40 or better Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor R-30 re uired • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #Ol-017R-1 Walls (R-21) Ceiling (R-30) ~ ~ , V"~ 1 "" r„^?/D / //(/~' ~ Baffles . I /! / DRYWALL NAILING Walls l~~ ~~~~ Ceiling Garage/Studio Occupancy Separation FINAL See on final ermit GENERAL CONDITIONS 1. Contractors working on this projeM are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details), Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. ~' 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. ' 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements Gave been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. L..I Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 F ~., . Waterman & Knis Building 101 Quinry 54eet, gui430t Purl Towncend~ WA 90360 Pbene: 369J79-5006 Foa 360305-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDO1-017 Issued: 02/26/01 Parcel Number: 951900002 Job Address: 2501 Cook Avenue Zoning: RR=I Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 8!2 Nature of Work: Construct Single-family Dwelling with earaee Owner: James T. and Marleen M. Yelaca Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept, of Labor & Industries 360-417-2702 RF(1TTTRF71 TNCPF('TinNS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks ~~ 2~~ Footings Forms Reinforcement Interior Footings Porch Piers ~~AA ''^^ ~ n ~C~fJ / ~ CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 a~aa~8 r~m,a not-on REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Vents - !1 required Crawl Access Beam Pockets Alternate Braced Wall Panel Holdowns @ garage 3 z ~~ol FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Girders L.~/` j ~~®~ Joists (` ~L Blocking Positive Connection Girder to Concrete Beam Pockets Positive Connection Post-to-Fdn. Wall Treated Wood to Concrete ' Anchor Bolts & Washers PRL gMBIND-V-T & Clean outs) ~ (AI ~ ~ ~J..~S ~j ~ j I C6 1 ~ Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - Z places Pressure Relief Valve drain to exterior, ternunate 6" -24" above ground ;_,~~. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit #OlAl7 RE UIRED INSPECTIONS APPROVEDtDATE MECHANICAL Heat Pump - HSPF =h 6.8; COP =Ib 3.0 ~/Z/~ Ducts & duct insulation (supply and return air ducts R-8; supply ducts in conditioned space R-4) Whole house ventilation Integrated system 7" minimum smooth duct (8" min. flex) Automatic (electric) damper -certification from installer required at final Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfm) and utility room (50 cfm) Environmental air exhaust ducting (with backdraR dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls ~21®1 Alternate Braced Wall Panels at garage Roof -engineered truss plan to be on-site at time of Inspection Rafter/truss positive connection Attic venting - eave and gable end Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker mast be on windows at time of inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-19 required) ~~~Jy 7~~~DI Walls (R-19 including mud room/house common wall) Ceiling (R-30) Bafl7es Vapor Barrier - 4 mil poly 6 mil black poly in craw] space -seams lapped 12" Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 oT 5 Bui{diog Prnnit 1701-017 REQUIRED INSPECTIONS APPROVED/DATE DRYWALL NAILING walls ~ ~~ ~}~ Ceiling ~ ~~ `'~ Garage/House Occupancy Separation Interior Braced Wall Panels FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing MechanicaUEIeating Fresh air cert~cation from Installer Insulation Certificate (if applicable) Smoke Detectors J ~~I ~~©~i Final -building GENERAL CONDITIONS --• 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down white this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspeMion ca11385-2294. A Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 5 y_. Building Permit #01-017 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 r _ ~~ ~~