HomeMy WebLinkAboutBLD01-013Watamen & ra• Budding
I81 Quinry Shed, Suile 301
~ Pon Towueod, WA 98368
Plwve: (360) 3'19-3208 Fu: (360) 3AL923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-O13 Issued: 1/31/01 Parcel Number: 968-500.066
Job Address: 4244 Jackman Street Zoning: PUD(R-H Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/2 Nature of Work: Construct single-family residence with
attached earaEe
Owner: Llovd & Lunette Campbell Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• *'~Hours of construction limited to 8:00 a.m. to tS:00p.m. Monday through Friday
and prohibited on Saturdays, Sundays, and National Holidays. **
RF.(ITTTRF,D TNSPF,CTTONS
w
APPROVED/DATE
CLEARING/GRADING
Tree removal prohibited for live trees at 6" diameter
at breast height or more which are located greater
than 10 feet from building pad.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks / /~
~~( ~~ J
.
`l/
Footings am
I
Forms
Reinforcement
Interior Footings
Porch Piers
R
~y ~/ -
l/ Call 48 hours before you dig for utility line locates
1-800-424-5555
Page i of 4
r~xaino~-ois
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
F
orms
Reinforcement p /
C~/ ~J/ ~ r
Beam Pockets 1 c
Anchor Bolts w/ 2" x 2" x 3/16" washers p~
S~ (~//, J
)
J
'
Foundation Vents -14 required ~
O
G /
t
/
V
Crawl Space Access G
Alternate Braced Wall Panel Holdown Hardware
FLOOR FRAMING
Engineered BCI joist plan on-site at time of ~~r-~®/
inspection t//
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Foundation Vents - 14 required
Crawl Space Access
PLUMBING:
Rough-In (D-V-T & Clean outs)
/
5
Water Supply /~~/ b~
Hose Bibs (backflow protection required) 1
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
18" above finished floor
MECHANICAL
Whole House Fan -Utility Room / ~/
~/ , ~/ Q
Source Specific Fans (((
Environmental Air Exhaust ducting (w/ back drab
dampers), insulation (R-4) and terminus (located 3'
from opening into building)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pemtit f4 BLl7fil-013
r~
REQUIRED INSPECTIONS APPROV~D/DATE
FRAMING
Walls
/
/ r/D ~1
Alternate Braced Wall Panel ~
J l J
/
Ceilings !
Roof
Truss Positive Connection
Attic Venting - cave and ridge
Windows -escape
Window safety glazing
Windows Ufactor - .40 maximum
NFRC window sticker must be on windows &
skylights at inspection time
Air Seal
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 maximum
Fire Blocking
Weather Resistive Barrier
INSULATION ,95~? ~~
~/
Floor (R-30)
Walls (R_19 )
Ceiling (R38)
• Baffles
Vapor Bamer: low perm. paint
Crawl space - 6 mil black poly
DRY WALL NAII.ING
Walls r/~ ^ /~~
/
/ _/,
.J
Ceiling l
`
GarageJHouse Occupancy Separation
DRAINAGE
Tie-in with Lynnesfield master detention system
LANDSCAPING
Planting of one tree required at corner of Lot 66 per
PUDA condition #44(f)
FINAL (continued on neat page)
Public Works Sign-Off
House Numbers
Plumbing
• MechanicaVHeating
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page3of4
Pomit9HLD01-013-
RE UIRED INSPECTIONS APPROVED/DATE ~
FINAL (continued)
Insulation Certificate /~/~Q/O~ /1n
Vapor Barrier Paint Certificate _/l f ~`~j/
Smoke Detectors
Final -Building
r~
1. Contractors working on this project are required to have a Labor & Industries _c_ontractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall'be permanently stabilized-with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels.
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval riot to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 4