Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD01-012
w,~~&x,IZawIn~3 161 Quinry Street, Soils 301 • - Port Towmxnd, WA 98368 P6ane: (360)379-3208 Far: (360)3746923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-012R-1 Issued: 1130101 Parcel Number: 948312203 Job Address; 1305 14~" Street Zoning: R-3 Type: V_N Occupancy: U-1 Nature of Work: Construct Garaee: refer to aermit # BLDOl-012 for house construction Owner: Home Towne Construction. Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(ITTTRF.i) TNCPF.('TT(7NS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING -See Sheet 8 of plans Setbacks Footings Forms ~ ?iyq,~yuj _ _ _ _ ~ ~~~ Reinforcement 6 "(, ~'U ' FOUNDATION Stem Wall , ~ Forms ~ ~~ ~~ l_•t Reinforcement \ Anchor bolts w 2"x 2"x 3/16" washers Alternate Braced Wall Panel Holdowns FRAMING NOTE: Engineered roof truss plan shall be on-site at ~ Z ~ (~ time of inspection Walls Ceiling/Roof ,~pr i,),~ (~lC, ~-L- ~ ~~v~ -3 ZJ~p Truss Positive Connection Weather Resistive Barrier FINAL Final -Building (refer to permit #$LD00-021 for house construction Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 rya a acnot-o~z GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures Shan include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shaA be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection calf 385-2294, press 3. A minimum of twenri-four hours notice is required. Public. Works aooroval must be received prior to scheduling the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Catl [or at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call d8 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2 r WelmerenBKahBtuMatg 181 Qt+N9' SbK4 Sudle 307 Port TowivrnQ WA 98368 Phove: (360) 379-3206 Fm: (360) 383-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS. CARD MUST BE POSTED AT CONSTRUCTION SITE Catl 385-2294 for Inspection Permit Number: BLDOI-OI2 Issued: 1/30/01 Parcel Number: 948-312-203 Job Address: 130514th Street Zoning RR=3 Type: V-N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct Sin¢le-family Residence (see R-1 for Para2e) Owner: Home Towne Construction Inc. Contractor; Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE • SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 '~***ft ll ennineered details renuire infection prior to cover**** RF.(lT1TRFTl TNSPF.CTIONS APPROVED/DrATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed per street development permit Drive Off Mat to prevent sediment from Leaving the site FOOTINGS Setbacks ~~ jZ/~ Footings Forms Reinforcement Continuous Interior Footing per engineering Piers be c k ~ p~ g ~ L-~. ~~ /' C~ Cal148 hours before you dig for uti-ity line locates 1-800-424-5555 Page 1 of 4 REQUIRED INSPECTIONS APPROVED/DAT F. r~i a eioo~-0u~ FOUNDATION Stem Walls Forms Reinforcement Anchor Bolts - 5l8" @ 4' o.c. per engineering Vents - 6 required Crawl Access Beam Pockets Engineered holdowns ( ~ (~ ~ ~ ~~ D ( I ` ~J , I `,/`~ FLOOR FRAMING Joists n ~ ~~ ~Q1©c (l `J Blocking ~ c Positive Connection Engineered straps - CMST 14 above holdowns Treated Wood to Concrete Anchor Bolts & Washers - 5/8" Shield Under Posts FDN Vents PLUMBING: ~ /} Rough-In (D-V-T & Clean Outs) ~ ~/~~~ f /~ Water Supply l Water Hammer Arresfor @ clothes & dishwasher i s kllea rotection required) pl~eTrisula - Pressure Reduction Valve if> 8 ~` Water Heater Seismic Restraint -strap @ I/3 points Pressure relief valve drain to exterior; 6" - 24" above Bound • Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Permit M BLO01-012 • • RF.nTTTRF.n TNSPF,('.TTONS APPROVED/DATE MECHANICAL ~/Z ,/~~ i %/ / Whole House Fan - F-2 bath Source Specific Fans l C Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: NOTE: Engineered nailing for shear walls „n requires inspection prior to cover ~ ~~~~ ~ (// r(l'/ Walls I Engineered Shear Walls -see attached engineering Roof -engineered truss plan to be on-site at time of inspection; applicant proposes to include engineering of roof beams shown on plans Attic Venting -gable end & eave Ceilings Posts, beams & headers Windows -escape Windows -safety glazing Windows Ufactor - .39 or better NFRC window sticker must be on windows & doors at inspection time Air Seal Fresh Air Intake (window port) Door UFactor - .20 or better Truss Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Floor (R-3~ / ~~ _ n 5j 2 ~, `/~ ~ Wall (R-2I ) ( Ceiling (R-38 Baffles Vapor Barrier: 4 mil poly Crawl Space - 6 mil Mack poly DRY WALL NAILING Walls ~/~~~ n „ f/'/'/ / Ceiling ` - ' Enclosed Space Under Stairs Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 re~xawoi-0u RE UIRED INSPECTIONS APPROVED/DATE FINAL Public Works Sign-Off . House Numbers - 5" ~/l~(~~ Plumbing MechanicaVHeating Insulation Certificate Smoke Detectors Deck Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have s Labor & Industries contractor's registration number and a City business License. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures sha116e installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels. (ABWP) require inspection prior to cover. , 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. AO building permits expire if no progress has been made within su months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans.. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 '_-- -