HomeMy WebLinkAboutBLD01-011WAama~BKateBuitding
18l Qe~Y Street. SuNe 301
Pat Townes WA 98368
PnaK: X360) 3 r9-3zoa Fes: (360) sas76n
i
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD M[TST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O11 Issued: 1/10/01 Parcel Number: 989703904
Tob Address: 1038 Water StreettThe Public House Zoning: C-III (H1
Occupancy Load: 57 Nature of Work: Temporary Tent - 400 square feet for music and dance
Property Owner. Pamela Felke for the Public House ContractorlOwner: Same as Owner
•
NOTE: Refer to attached Fire Department memo dated 1/]0/01 for conditions of approval
GENERAL CONDITIONS APPLY -SEE LAST PAGE
ELECTRICAL - a separate electrical permit is required Tor any electrical work. Contact Labor
and Industries at (360) 417-2700 if needed.
FINAL -contact Tom Aumock, Port
Townsend Fire Department, @ 385-2626,
for inspection and approval
Fire Extinguishers
Exiting/Signage/Illumination
"No Smoking" Signs
Setbacks
Flame Resistant Materials
Occupancy Load Signage: 57
Final -Fire Department
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pumil#BLI701-011
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 38 5-2 2 94. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report correMions are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Buildine Department's final inspection.
7. final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca114$ hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2