HomeMy WebLinkAboutBLD01-008Wetmmm &ISetz Building
I el Qumry 3[ree1, Suite 301
Pat Taxuend WA 98368
Phau:: (360) 379-3208 Fmc: (360) 365-7675
`J
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLDOl-OO8 Issued: 1111/Ol Parcel Number: 989705503
Job Address: 714 Washineton Street Zoning: C-III H
Occupancy Load: 13 Nature of Work: Construct 200 sa. ft. Gazebo
Property Owner: Joe Finnie Contractor/Owner: Craie Johnson
NOTE.• Wet-simature engineering required prior to Final Inspection Ap rp oval
GENERAL CONDITIONS APPLY -SEE LAST PAGE
ELECTRICAL- a separate electrical permit is required for any electrical work. Contact Labor
and Industries at (360) 417-2700 if needed.
~ RF,OiJiRF.D iNSPECTiONS
APPROVED/DATE
~ FOOTINGS
Setbacks
Footings - 16" x 16" per engineering
Forms
Reinforcement //1~~~
C[/
FLOOR FRAMING ~ / ~~~'~/
~/ ~~
Girders _
joists ~
Post Bases
Joist Hangers
Blocking
Treated Wood
FRAMING -Engineered truss plan to be ~ ~~` .~ `/~~ i;
/
on-site at trme of inspection
Walls
Ceiling
RaRer/Truss Positive Connection
Roof
Roof Venting
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pamil#HLDOlAgB
FINAL
Final -Fire Department
Guardrails
Barrier-Free Ramp
Final -Building
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels.
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review-and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2