CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDO1-O07R-1 Issued: 03/07/01 Parcel Number: 965-702-603
Job Address: 735 Calhoun Street Zoning: RR=H Type: VV=N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Delete F-2 Addition to Accessory Dwelling Unit
Owner: K. Richard and Susan Thomas Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF,nTJIRF,D INSPE(:"I'IONS APPROVED/DATE
See also original inspection record
FRAMING
Windows Ufactor - .40 or better
NFRC window sticker must be on windows and
doors at inspection time
Door U-factor - .40 or better
INSULATION
Floor (Ri25 )
Walls (R`19 )
Ceiling (R-30 -vault )
DRY WALL NAILING
Walls
Ceiling
FINAL -see original inspection record
Call 48 hours before you dig for utility line locates
1-800-424-SSSS
Page 1 of 2
Pe.mit A HLDOI-W7
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing end
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A
m:n:m..m of fwanfv_fnnr hm.re nnf:ra is ram.irnd Pnhlir Wnrkc annrnual mncf ha rnrnivad nrinr to
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
w,i~, ~ ~a:ldnc
Est Q~,tM.y so-en, siwe 3m
Part Towroend, WA 98368
PMne: (360) 3793208 Fmc: (360) 3857695
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Cal! 385-2294 for Inspection
Permit Number: BLDO1-OO7 Issued: 01/23/01 Parcel Number: 965-?02-603
Job Address: 735 Calhoun Street Zoning: R-II Type: VV=N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Addition to Accessory Dwelling Unit
Owner: K. Richard and Susan Thomas Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Silt Fence if needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
~~/~ n~
Footings ! (•t
Forms
Reinforcement
Porch/Deck Piers
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit A 811)01-007 'r
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
~ j~0~1 1~
Forms :
•J
Reinforcement /
Anchor Bolts with washers
Foundation Vents - 2 required
Crawl Access
Alternate Braced Wall Panel Holdowns
FLOOR FRAMING
Girders
3~~~'~'t ~,
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/2" x 2' z 3/16" washers
PLUMBING:
Existing
MECHANICAL
E ' ling ,
301
MING
Walls
Alternate Braced Wall Panels /
~y 9/Q~
Ceiling cl
Roof
Rafter Positive Connection
Attic Venting -eaves and ridge
Windows -escape
Window safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows and
doors at inspection time
Door U-factor - .20 or better
Air Seal
Fresh Air Intake (Wall Ports)
Fire Blocking
Weather Resistive Barrier
_~
Call 48 hours before you dig for utility line locates
i-800.424-5555
Page2of4
~~~~.~
•
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION
Floor (R=30)
~j/~
Walls (R=19) l
Ceiling (R-30 - vaultl
Battles
Vapor Barrier: faced batts
6 mil black poly in crawl
DRY WALL NAILING
Walls ~/• ~ /~ „/~
~f
-/
(~~
Ceiling `
l
Enclosed Usable Space under Stairs
FINAL
House Numbers - 5" minimum nn
~/l~/(~~ / ///
Smoke Detectors / ! ~(
Final -Building \
1. Contractors working on this project are required to have a Labor & Industries contraMor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit#BLD01-(q7 ,
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection caI1385-2294, press 3. ~
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department. within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS.
•
Calt 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4