HomeMy WebLinkAboutBLD01-006Watertnen & Katz Bvildiig
781 Quinry Stn:ef, Suite 307
PoR Tounvend WA 96368
Phone: (360) 3793208 Fax: (360) 3817675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDO1-OO6 Issued: 01!24/01 Parcel Number: 985-201-701
Job Address: 1333 W Street Zoning: R-II Type: V_N Occupancy: U-1
Nature of Work: Construct 576 square foot Pole Garage
Owner; Clayton MacDonald
Contractor: Sound Buildine Systems, Inc.
Rick @ 360-731-0050
GENERAL CONDITIONS APPLY -SEE LAST PAGE
ATi (1TTTi?FTl TNePF('TT(1NC
APPRnVF.D/DATE
TEMPORARY EROSION &
SEDIlVIENT CONTROL
See General Condition No 2, install on-site
as needed during construction -okay to use
proposed driveway as construction entrance
FOOTING
Setbacks
~/l /D~
Post Footings - (8) per stamped plans; see ` /
sheet AS of plans for details
Forms
FRAMING
Walls - (8) PT posts; see sheet A6 of plans
for end wall and truss pole specs
~l ll~~ f iQ
CeilingBoof-engineered truss plan shall ~C
be on-site at time of inspection
Blocking
Post-to-Truss Positive Connection
Post-to-Rafter Positive Connection
Ridge Connection
FINAL ~~
Public Works Sign-Off 3/
~
L
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit b BLIl01-006
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; colt 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection. •
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress hss been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig Tor utility -ine locates
I-800-424-5555
Page 2 of 2