Loading...
HomeMy WebLinkAboutBLD01-006Watertnen & Katz Bvildiig 781 Quinry Stn:ef, Suite 307 PoR Tounvend WA 96368 Phone: (360) 3793208 Fax: (360) 3817675 CITY OF PORT TOWNSEND • CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDO1-OO6 Issued: 01!24/01 Parcel Number: 985-201-701 Job Address: 1333 W Street Zoning: R-II Type: V_N Occupancy: U-1 Nature of Work: Construct 576 square foot Pole Garage Owner; Clayton MacDonald Contractor: Sound Buildine Systems, Inc. Rick @ 360-731-0050 GENERAL CONDITIONS APPLY -SEE LAST PAGE ATi (1TTTi?FTl TNePF('TT(1NC APPRnVF.D/DATE TEMPORARY EROSION & SEDIlVIENT CONTROL See General Condition No 2, install on-site as needed during construction -okay to use proposed driveway as construction entrance FOOTING Setbacks ~/l /D~ Post Footings - (8) per stamped plans; see ` / sheet AS of plans for details Forms FRAMING Walls - (8) PT posts; see sheet A6 of plans for end wall and truss pole specs ~l ll~~ f iQ CeilingBoof-engineered truss plan shall ~C be on-site at time of inspection Blocking Post-to-Truss Positive Connection Post-to-Rafter Positive Connection Ridge Connection FINAL ~~ Public Works Sign-Off 3/ ~ L Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit b BLIl01-006 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; colt 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. • 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress hss been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig Tor utility -ine locates I-800-424-5555 Page 2 of 2