Loading...
HomeMy WebLinkAboutBLD01-005Wnaman R Y.etz Hwld'vg 161 Qumry SbCtl, Sui4 301 Pat 7owraend WA 98368 Phone: (360) 379-3208 Fen: (360) 3817695 CITY OF PORT TOWNSEND APPROVED/DATE FOUNDATION Engineered Holdowns -see revised locations and type FRAMING Engineered Shear Walls -per revised engineering based on q ,, ~~ `~Z / G "~~ as-built conditions FINAL -refer to original inspection record 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. •_ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page I of 2 CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDOI-OOSR-1 Issued: 9/20/01 Parcel Number: 948-302-208 Job Address: 1420 Landes Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 3/2 Nature of Work: Revise engineered shear wall and holdown schedule Owner: Dennis Barnhart Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS Permit p HI.DO7~'jM 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is repaired. Public Works aaaroval must be received prior to schedulin¢ the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your. building permit active. 9. Revisions require submittal and approval urior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMTI' ON-STI'E WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 2 of 2 • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection CITY OF PORT TOWNSEND wye~~tx,t:seam tat pray sweet. since 3m Pmt 7'mmund, WA 98368 Phone: (360) 3733208 Fac: (360) 365-7675 Permit Number: BLDO1-OOS Issued: 2/07/01 Parcel Number: 948-302-208 Job Address: 1420 Landes Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 3/2 Nature of Work: Construct single-family residence w/aara2e & shoo Owner: Dennis Barnhart Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,nTTTRF.n TNSPF,CTTnNS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~y ,,/ O/o2 //~~ (~ ~ Footings 1. ` Forms Reinforcement Interior Footings - 2"x 2"x 8"w/ (2) #4 each way Porch Piers UFER Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r~ism.~o~~as RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall qp nn Forms ~~ ~®~ O (~ Reinforcement Engineered Holdowns Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents - 7 required Crawl Space Access Beam Pockets FLOOR FRAMING Girder n ll Q/L Y~ ~ ' Joists - Engineered BCI plan shall be on-site at time ~ (~ l/ of inspec7ion Blocking Shield under Posts Positive Connections Girder to Concrete Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers Foundation Vents - 7 required Crawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs} + ~ Water Supply ~ / Z 0~ Water Hammer Arresters ll Hose Bibs (backflow protection required) Pipe Insulation (R-3) eduction Valve if> 80 psi ater ea e Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminal 6" - 24" above ground 18" AF.F. MECHANICAL Whole House Fan -Utility Room ~/) ~/j ~~~A ~ /~~ Source Specific Fans l ~ G !~ ~l Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) Ca1148 hours hefore you dig for utility line locates 1-800-424-5555 Page 2 of 4 RE UIRED INSPECTIONS APPROV /DATE Pttmit k BLI)01-005 FRAMING walls ~/~ ~~D Engineered Shear Walls Ceilings Roof- engineered truss plan shall be on-site at time of inspection Truss Positive Connection Attic Venting - eave and ridge Windows -escape Window safety glazing Windows Ufactor - .36 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window or Wall Ports required) Doors U-Factor - .20 or better Fire Blocking Weather Resistive Bamer INSULATION Floor(R=30) /~ /~ /~Ji~ ~~~ ~O~~i(~~J(1/ _ Walls (R=21) Ceiling (12_38 ! !! ( ~~ ~ / ~~~ ~ o ~ l~ Baflle v}C, ~ Va or Barrier: faced balls yawl space - 6 mil black pol DRY WALL NAILING ~~~~ G~~ l ~~Z~/~j~ Walls ~ v_ Ceiling G• L, Z-~/Z/OZ Garage/House Occupancy Separation FINAL Public Works Sign-Off House Numbers - 5" g~~/~~ Plumbing Mechanical/Heating Insulation Certificate Smoke Detectors Final -Building Call 48 boors before you dig for utility Tine locates I-800-424-5555 Page 3 of 4 Pmni[NBIdJP'; 5 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC)_measures shall be installed on-site and inspected prior to beginning construction; ca11 38 5-2 2 94, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Warks aaoroval must be received prior to . scheduling the Building Deuartment's final insnection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-. residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PIrANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4