HomeMy WebLinkAboutBLD01-005Wnaman R Y.etz Hwld'vg
161 Qumry SbCtl, Sui4 301
Pat 7owraend WA 98368
Phone: (360) 379-3208 Fen: (360) 3817695
CITY OF PORT TOWNSEND
APPROVED/DATE
FOUNDATION
Engineered Holdowns -see revised locations and type
FRAMING
Engineered Shear Walls -per revised engineering based on q ,, ~~
`~Z / G
"~~
as-built conditions
FINAL -refer to original inspection record
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
•_ Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDOI-OOSR-1 Issued: 9/20/01 Parcel Number: 948-302-208
Job Address: 1420 Landes Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 3/2 Nature of Work: Revise engineered shear wall and holdown schedule
Owner: Dennis Barnhart Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
Permit p HI.DO7~'jM
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is repaired. Public Works aaaroval must be received prior to
schedulin¢ the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your.
building permit active.
9. Revisions require submittal and approval urior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMTI' ON-STI'E WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-500-424-5555
Page 2 of 2
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
CITY OF PORT TOWNSEND
wye~~tx,t:seam
tat pray sweet. since 3m
Pmt 7'mmund, WA 98368
Phone: (360) 3733208 Fac: (360) 365-7675
Permit Number: BLDO1-OOS Issued: 2/07/01 Parcel Number: 948-302-208
Job Address: 1420 Landes Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 3/2 Nature of Work: Construct single-family residence w/aara2e & shoo
Owner: Dennis Barnhart Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF,nTTTRF.n TNSPF,CTTnNS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~y ,,/
O/o2 //~~ (~
~
Footings 1.
`
Forms
Reinforcement
Interior Footings - 2"x 2"x 8"w/ (2) #4 each way
Porch Piers
UFER
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
r~ism.~o~~as
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall qp
nn
Forms ~~
~®~
O (~
Reinforcement
Engineered Holdowns
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents - 7 required
Crawl Space Access
Beam Pockets
FLOOR FRAMING
Girder n
ll
Q/L Y~
~
'
Joists - Engineered BCI plan shall be on-site at time ~
(~
l/
of inspec7ion
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Foundation Vents - 7 required
Crawl Space Access
PLUMBING:
Rough-In (D-V-T & Clean outs}
+
~
Water Supply ~
/ Z
0~
Water Hammer Arresters ll
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
eduction Valve if> 80 psi
ater ea e
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminal
6" - 24" above ground
18" AF.F.
MECHANICAL
Whole House Fan -Utility Room ~/)
~/j ~~~A
~
/~~
Source Specific Fans l
~
G !~ ~l
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
Ca1148 hours hefore you dig for utility line locates
1-800-424-5555
Page 2 of 4
RE UIRED INSPECTIONS
APPROV /DATE
Pttmit k BLI)01-005
FRAMING
walls ~/~ ~~D
Engineered Shear Walls
Ceilings
Roof- engineered truss plan shall be on-site at time
of inspection
Truss Positive Connection
Attic Venting - eave and ridge
Windows -escape
Window safety glazing
Windows Ufactor - .36 or better
NFRC window sticker must be on windows and
doors at inspection time
Air Seal
Fresh Air Intake (Window or Wall Ports required)
Doors U-Factor - .20 or better
Fire Blocking
Weather Resistive Bamer
INSULATION
Floor(R=30) /~ /~
/~Ji~ ~~~ ~O~~i(~~J(1/
_
Walls (R=21)
Ceiling (12_38 ! !!
(
~~ ~ / ~~~ ~ o ~
l~
Baflle v}C,
~ Va or Barrier: faced balls
yawl space - 6 mil black pol
DRY WALL NAILING ~~~~
G~~ l ~~Z~/~j~
Walls ~
v_
Ceiling G• L, Z-~/Z/OZ
Garage/House Occupancy Separation
FINAL
Public Works Sign-Off
House Numbers - 5"
g~~/~~
Plumbing
Mechanical/Heating
Insulation Certificate
Smoke Detectors
Final -Building
Call 48 boors before you dig for utility Tine locates
I-800-424-5555
Page 3 of 4
Pmni[NBIdJP'; 5
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC)_measures shall be installed on-site and inspected prior
to beginning construction; ca11 38 5-2 2 94, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Warks aaoroval must be received prior to .
scheduling the Building Deuartment's final insnection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-.
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PIrANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 4