HomeMy WebLinkAboutBLD01-004
waran,m a x,>rBwla~
181 Quinry 51ree1, Suite 30I
PatTavtsad WA 98368
%one: (360)3793208 Fmc: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-OO4 Issued: 115/01 Parcel Number: 948301003
Job Address: Port of Port Townsend 2790 Washin¢ton Street Yard Snace #204 Zoning: M-IIA
Type: VV=N Occupancy: U-1 Nature of Work: Build Temaorarv Structure - 648 square foot boat shed.
Property Owner: Port of Port Townsend Contractor/Owner: Rod Maeer
NOTE: This permit expires 1/5/02. One extension may be granted for a period not to exceed one year
from the Port of Port Townsend. The permit extension fee is $47.00; contact the Building and Community
Development Department at 379-3208 to request the extension.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
ELECTRICAL - a separate electrical permit is required Tor any electrical work. Contact Labor
and Industries at (360) 417-2700 if needed.
•
FRAMING/FINAL
Framing Inspection may be done at Final
Inspection if all elements of framing are
visible.
Storage is unheated.
Positive connection to ground per plans.
Storage of flammable products not allowed.
On-site quantities and storage of
flammable products must be in approved
Liquid Storage Cabinets per Uniform Fire
Code provisions. Contact Tom Aumock,
Fire Department at 385-2625 with
questions.
Final -Fire Department
2-A:10-B;C minimum rated fire
extinguisher required.
Final -Building Department
Ca1148 hours before you dig for utility line locates
I-800-424-5555.
Page 1 of 2
Pemill#HLDOIdp9
GENERAL CONDITIONS
`. J
1. Contractors working on this project are required to have a Labor 8t Industries contractor's re¢istration
number snd a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; cs11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporari{y stabilized with mulching, plastic sheeting, etc. Sails
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review snd approval urior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2