HomeMy WebLinkAboutBLD01-003r
Wa4+msn & Kali Building
181 Quinq Slree4 8ui4 301
Porl rownu~d. WA 98768
Phone: 360379-5086 Fas 360385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-OO3R-1 Issued: 04/26/01 Parcel Number: 964201701
Job Address: 2235 Hastin¢s Avenue Zoning: R-III Type: VV=N Occupancy: R-31U-1
Total Occupant Load: 412 Nature of Work: Eneineered Carport
Owner: Ronald Minaker Contractor: Terhune Homes, Inc.
360-697-7000
GENERAL CONDITIONS APPLY: See last aa~e
SEPARATE PERMTI'S REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.nTTTRF,T) TNSPF,C'TTONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
FOOTINGS
Setbacks
Post Footings
Reinforcement
Post Ease
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #01-003R•1
REQUIRED INSPECTIONS
APPRnVF,n/nATF.
FRAMING
Walls
Beam - 6 x 10 DF # I typical
IZnee Brace
Lag Screws
Post-to-Beam Connection
Center Post Connection
Roof
Rafter Positive Connection
Rafter to Rsdge Beam Connection
FINAL
House Numbers - 5" numbers
Smoke Detectors throughout house
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing
and graveled construction entrance (see attached details). Adjacent rights-ot--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies. noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior
to scheduling the Buildine Department's final inspection.
Ca1148 hours before you dig for utility line locates
I-800=424-5555
Page 2 of 3
Building Prnnit 1101-003R-1
f
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
C~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
? '
J
Walemna & Ke1a Buadlog
181 Qufnq gtrtel. Suite J01
Porl7ow~aend, WA 98d66
Phonr. 3fi0J79-SOgb Pea 360385-7675
CITY OF PORT TOWNSEND
i
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-OO3 Issued: 02/22/01 Parcel Number: 964201701
Job Address: 2235 Hastines Avenue Zoning: R-III Type: VV=N Occupancy: R-3lU-1
Total Occupant Load: 4/2 Nature of Work: Construct Sin¢le-family Dwelline with sara¢e
Owner: Ronald Minaker
Contractor: Terhune Homes, Inc.
360-697-7000
GENERAL CONDITIONS APPLY: See last aaee
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.nTTTRF.TI TNCPF("TTCINC
APPRnVF.T)/nATF.
TEMP EROSION & SEDIMENT CONTROL
See Genera) Condition #2
Graveled construction entrance required to prevent
dirt and sediment from leaving the site
FOOTINGS
Setbacks /
~' V(/~
~ y~
Footings
J/~
~ca
` ~(
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
CALL 48 hours before you dig Tor Utility line locates
1-800-424-5555
Page 1 of 5
Building Pmnit #OI-003
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Vents - I4 required
Crawl Access
Beam Pockets
Alternate Braced Wall Panel Holdowns
FLOOR FRAMING
NOTE: Engineered LPI floor plan on-site and n
available to the Inspector at inspection time r~ ~~D I f7 1'
Girders ~
` \"~
Joists \
Blocking
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
Rough B (D V-T & Clean outs) ~(~~ ~ (~~ S~d/QJ / //
((l
Water Supply ~(
Water Hammer Arrestor
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
18" A. F. F.
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, ternvnate
6" -24" above ground
Ca1148 hours before you dig far utility line locates
I-800-424-5555
Page 2 of 5
Building Permit 801-003
~I
RE UIRED INSPECTIONS APPROVED/DATE
MECHANICAL
LPG Fireplace
Heat Pump - HSPF =h 6.8; COP =h 3.0
~ '
~// ~
~ /,,.1
~
Ducts & duct insulation (supply and return air ducts ~ ~
'~/'Ul
~-`~
R-8; supply ducts in conditioned space R-4) C
Whole house ventilation
Integrated system
7" minimum smooth duct (8" min. flex)
Automatic (electric) damper -certification from
installer required at final
Source Specific Exhaust Fans @ bathrooms (SOcfm),
kitchen (100 cfm) and utility room (50 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING
Walls
~
~
Ceiling Joists ~~
~ ~~ I
Roof- engineered truss plan to be on-site at time of (~~~111
Inspection
Rafter/truss positive connection
Attic venting - 1 sq. ft. per 150 sq. ft. of area vented
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .65 or better
NFRC sticker must be on windows at time of inspection
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-19 required) ~ ~~~9
~,{~~i!~ J/j
[F!
Walls (R-19 including garage/house common wall) ~
Ceiling (R-30)
Baffles
Vapor Barrier -vapor barrier paint
6 mil black poly in crawl space -seams lapped 12"
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Pami[#O1-003 ~
REQUIRED INSPECTIONS APPROVED/DATE
DRYWALL NAILING
Walls
~/~~0 ~ ~D
Ceiling
Dose Occu anc ~~~
Interior Braced Wall Panels ` l~
~/Z/`/O f nn
7
(
q
,
`
j
"
FINAL
Public Works Sign-off
LPG
House Numbers - 5" numbers
Plumbing
Mechanical/Heating ~,~}
~ r2~1 ~ ~G (pj/
Fresh air certifrcation from installer 1 ~~,
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -building
~/Z ~I Q
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a Ciri business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing
and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. Alt elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. f}wner or owner's agent shall review and oversee correMion of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspeMion ca11385-2294. A
minimum of twenty-tour hours notice is required. Public Works aouroval must be received urior
to scheduline the Buildine Deaartment's final inspection:
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
r
Building Prnni[ #OIA03
- 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
• non-residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig.for utility line locates
1-800-424-5555
Page 5 of 5
~`~
C~