Loading...
HomeMy WebLinkAboutBLD01-003r Wa4+msn & Kali Building 181 Quinq Slree4 8ui4 301 Porl rownu~d. WA 98768 Phone: 360379-5086 Fas 360385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-OO3R-1 Issued: 04/26/01 Parcel Number: 964201701 Job Address: 2235 Hastin¢s Avenue Zoning: R-III Type: VV=N Occupancy: R-31U-1 Total Occupant Load: 412 Nature of Work: Eneineered Carport Owner: Ronald Minaker Contractor: Terhune Homes, Inc. 360-697-7000 GENERAL CONDITIONS APPLY: See last aa~e SEPARATE PERMTI'S REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.nTTTRF,T) TNSPF,C'TTONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 FOOTINGS Setbacks Post Footings Reinforcement Post Ease CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #01-003R•1 REQUIRED INSPECTIONS APPRnVF,n/nATF. FRAMING Walls Beam - 6 x 10 DF # I typical IZnee Brace Lag Screws Post-to-Beam Connection Center Post Connection Roof Rafter Positive Connection Rafter to Rsdge Beam Connection FINAL House Numbers - 5" numbers Smoke Detectors throughout house Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-ot--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies. noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Buildine Department's final inspection. Ca1148 hours before you dig for utility line locates I-800=424-5555 Page 2 of 3 Building Prnnit 1101-003R-1 f 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ? ' J Walemna & Ke1a Buadlog 181 Qufnq gtrtel. Suite J01 Porl7ow~aend, WA 98d66 Phonr. 3fi0J79-SOgb Pea 360385-7675 CITY OF PORT TOWNSEND i CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-OO3 Issued: 02/22/01 Parcel Number: 964201701 Job Address: 2235 Hastines Avenue Zoning: R-III Type: VV=N Occupancy: R-3lU-1 Total Occupant Load: 4/2 Nature of Work: Construct Sin¢le-family Dwelline with sara¢e Owner: Ronald Minaker Contractor: Terhune Homes, Inc. 360-697-7000 GENERAL CONDITIONS APPLY: See last aaee SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.nTTTRF.TI TNCPF("TTCINC APPRnVF.T)/nATF. TEMP EROSION & SEDIMENT CONTROL See Genera) Condition #2 Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks / ~' V(/~ ~ y~ Footings J/~ ~ca ` ~( Forms Reinforcement Interior Footings Porch Piers UFER CALL 48 hours before you dig Tor Utility line locates 1-800-424-5555 Page 1 of 5 Building Pmnit #OI-003 RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Vents - I4 required Crawl Access Beam Pockets Alternate Braced Wall Panel Holdowns FLOOR FRAMING NOTE: Engineered LPI floor plan on-site and n available to the Inspector at inspection time r~ ~~D I f7 1' Girders ~ ` \"~ Joists \ Blocking Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Rough B (D V-T & Clean outs) ~(~~ ~ (~~ S~d/QJ / // ((l Water Supply ~( Water Hammer Arrestor Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater 18" A. F. F. R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, ternvnate 6" -24" above ground Ca1148 hours before you dig far utility line locates I-800-424-5555 Page 2 of 5 Building Permit 801-003 ~I RE UIRED INSPECTIONS APPROVED/DATE MECHANICAL LPG Fireplace Heat Pump - HSPF =h 6.8; COP =h 3.0 ~ ' ~// ~ ~ /,,.1 ~ Ducts & duct insulation (supply and return air ducts ~ ~ '~/'Ul ~-`~ R-8; supply ducts in conditioned space R-4) C Whole house ventilation Integrated system 7" minimum smooth duct (8" min. flex) Automatic (electric) damper -certification from installer required at final Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfm) and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls ~ ~ Ceiling Joists ~~ ~ ~~ I Roof- engineered truss plan to be on-site at time of (~~~111 Inspection Rafter/truss positive connection Attic venting - 1 sq. ft. per 150 sq. ft. of area vented Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be on windows at time of inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-19 required) ~ ~~~9 ~,{~~i!~ J/j [F! Walls (R-19 including garage/house common wall) ~ Ceiling (R-30) Baffles Vapor Barrier -vapor barrier paint 6 mil black poly in crawl space -seams lapped 12" Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pami[#O1-003 ~ REQUIRED INSPECTIONS APPROVED/DATE DRYWALL NAILING Walls ~/~~0 ~ ~D Ceiling Dose Occu anc ~~~ Interior Braced Wall Panels ` l~ ~/Z/`/O f nn 7 ( q , ` j " FINAL Public Works Sign-off LPG House Numbers - 5" numbers Plumbing Mechanical/Heating ~,~} ~ r2~1 ~ ~G (pj/ Fresh air certifrcation from installer 1 ~~, Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building ~/Z ~I Q GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. Alt elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. f}wner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion ca11385-2294. A minimum of twenty-tour hours notice is required. Public Works aouroval must be received urior to scheduline the Buildine Deaartment's final inspection: Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 r Building Prnni[ #OIA03 - 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a • non-residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig.for utility line locates 1-800-424-5555 Page 5 of 5 ~`~ C~