CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDG 1-001 Issued: 2/08/01 Parcel Number: 948-317-801
Job Address: 1315 McClellan Street Zoning: R-HIType: V_N Occupancy: R-3/U-i
Total Occupant Load: 4/2 Nature of Work: Construct single-family residence with earaee
Owner: Lawrence and Eleanor Deardorff
r1
LJ
Contractor: Cavette Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks n n
2/~/D~ (`''
y
Footings 1
Forms
Reinforcement
'or Footings - 2"x 2 " x 8" w/ (2) #4 each way
UFE ' „ ' „ l /` O
1.•~'
FOUNDATION
stem wall Z//~~~~
Forms
Reinforcement
Alternate Braced Wall Panel Holdown Hardware
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents -14 required
Crawl Space Access
Beam Pockets
Page 1 of 4
i~t a t3toot-0m
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Girder
Joists -Engineered BCI plan shall be on-site at time
of inspection
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Foundation Vents -14 required
Craw! Space Access
~n
) l~S'lQ/ f ,y
~ c `~'
f
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply / /
`,~/ Z~/ Q~
W Hammer Arresters ` ((` "`"~~~
Hose Bibs a cflow protection required)
Pipe Insulation (R-3
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under '
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminat
6" - 24" above ground
18'
lectric Forced Air
Manufacturers' Installation Instructions to be on-
site at time of inspection
Ducts and Duct Insulation -Supply/fresh air ducts in
conditioned space: R-4; heating ducts in
unconditioned space: R-8
o t a ion
HVAC Integrated Fresh Air /
'J/2~/'~ G
T' Smooth Duct
Terminal Element - 8"
Clock Timer on Furnace Fan
Other than motorized damper requires letter of
certification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraR
dampers), insulation (R-4) and terminus (located 3'
from opening)
Page 2 of 4
t
i
~- _
t __-- ~. .~ _ _ .-. _ _
Pemtit N BLD01-001
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls
Alternate Braced Wall Panels ~ /
~~/~lJ
Ceilings
Roof- engineered truss plan shall be on-site at time
Of inSpeCtiOn
Truss Positive Connection
Attic Venting - eave and ridge
Windows -escape
Window safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be an windows,
skylights and doors at inspection time
Skylights - .58 or better
Air Seal
Fresh Air Intake (Window or Wall Ports required)
Doors U-Factor - .20 or better
Fire Blocking
Weather Resistive Bamer
INSULATION
Floor (R_30)
3/~, ~~l
Walls (R_19 )
Ceiling (R-38 )
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAILING ~
~
Walls //~/
Ceiling
Garage/House Occupancy Separation
FINAL
Public Works Sign-Off
House Numbers - 5"
Plumbing
MechanicaUHeating
Insulation Certificate
Fresh Air Certification for Integrated System
Smoke Detectors
Final -Building
Page 3 of 4
Permit W BLDOI-001
i
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection caI1385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine Deaartment's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval .prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS.