HomeMy WebLinkAbout2014 Water System Plan Update September 2014 HDR City of Port Townsend 2014 Water System Plan Update September 2014 500 108th Avenue NE Suite 1200 Bellevue, WA 98004-5549 (425) 450-6200 This Page Intentionally Left Blank STATE O� o `¢ STATE OF WASHINGTON DEPARTMENT OF HEALTH SOUTHWEST DRINKING WATER REGIONAL OPERATIONS PO Box 47823, Olympia, Washington 98504-7823 TDD Relay 1-800-833-6388 September 4, 2014 Ian Jablonski Port Townsend Water Department 250 Madison Street, Suite 2R Port Townsend, Washington 98368 Subject: City of Port Townsend, ID #69000R, Jefferson County; Water System Plan Update of 2008 Plan Three-Year Extension, ODW Project#14-0606 Dear Ian Jablonski: The Water System Plan(WSP) update received by the Office of Drinking Water (ODW) on June 4, 2014, along with the subsequent submittal received on August 12, 2014, have been reviewed and are APPROVED. Approval of this WSP is valid as it relates to current standards outlined in WAC 246-290 revised April 30, 2012, WAC 246-293 revised September 1997, and RCW 70.116 (Municipal Water Law) effective September 2003, and is subject to the qualifications herein. Future changes in the rules and statutes may be more stringent and require facility modification or corrective action. Based on the information supplied in the WSP, your water system has sufficient capacity to meet the growth projections for the identified three-year planning period. ODW is approving this plan for three years. An approved update of this WSP is required on or before September 4, 2017, unless ODW requests an update or plan amendment pursuant to WAC 246-290-100(9). APPROVED NUMBER OF CONNECTIONS Based on the analysis presented in the WSP, the City of Port Townsend water system is approved for 11,024 Equivalent Residential Units (ERUs), and for an Unspecified number of connections. The capacity was determined based on a Maximum Day Demand (MDD) of 272 gallons per day per ERU (gpd/ERU). The limiting factor for the system is treatment capacity (MDD) for the new filtration treatment facility. 9 1a Ian Jablonski September 4, 2014 Page 2 You are responsible for permitting the addition of new service connections to your water system in a manner consistent with the approved document. We expect you to maintain a process, which recognizes all new connections added to the water system, and the water demands associated with each connection. Your process must assure that physical capacity and water right limitations are not exceeded. LOCAL GOVERNMENT CONSISTENCY John McDonagh, Senior Planner, City of Port Townsend signed the local consistency statement on July 15, 2014. Stacie L. Hoskins, Planning Manager, Jefferson County signed the local consistency statement on July 14, 2014. This meets local government consistency requirements for WSP approval pursuant to RCW 90.03.386 and RCW 43.20. WATER RESOURCES Our approval of your water system plan does not confer or guarantee any right to a specific quantity of water. The approved number of service connections is based on your representation of available water quantity. If the Washington Department of Ecology, a local planning agency, or other authority responsible for determining water rights and water system adequacy determines that you have use of less water than you represented, the number of approved connections may be reduced commensurate with the actual amount of water and your legal right to use it. Ecology has not determined this WSP is "not inconsistent" with the approved watershed plan for WIRA 17. Please contact Ecology for more information. We recognize the significant effort and resource commitment involved in the preparation of this WSP. Thank you for your cooperation. If you have any questions, please contact Corina Hayes at (360) 236-3031 or Teresa Walker at (360) 236-3032. Sincerely, o Pin a es Teresa Walker, P.E. Office of Drinking Water, Regional Planner Office of Drinking Water, Regional Engineer cc. Mike Blanchette, HDR Engineering Eric Habermeyer, HDR Engineering Jefferson County Health Department Jefferson County Planning Department Tammy Hall, Department of Ecology CERTIFICATION This 2014 Water System flan for the City of Park Townsend was prepared by HDR Engineering, Inc., and City of Port Townsend staff, under the direction of the fallowing Registered Professional Engineers: AHP'� WAS, h Eric C Habermeyer, PE HDR Engineering, Inc. APPROVAL Reviewed by Washington State Department of Health in accordance with the provisions of WAC 246-290-100 and approved on September 4, 2014, Approved by the City of Port Townsend by Ordinance 3115 dated August 4, 2014. This Page Intentionally Left Blank Table of Contents ExecutiveSummary.......................................................................................... 1 BasicPlanning Data....................................................................................................... 1 SystemAnalysis............................................................................................................. 2 Capital Improvement Plan .............................................................................................. 2 FinancialAnalysis........................................................................................................... 2 Water Rights Self Assessment, Local Government Consistency, and SEPA.................. 3 1.0 Description of the Water System............................................................ 4 2.0 Basic Planning Data and Water Demand Forecasting ............................ 4 2.1 Current and Past Conditions............................................................................... 4 2.1.1 Population and Service Connections ....................................................... 4 2.1.2 Water Use ............................................................................................... 6 2.2 Estimated Future Conditions..............................................................................13 2.2.1 Land Use................................................................................................13 2.2.2 Population and Demand .........................................................................13 3.0 System Analysis .................................................................................... 15 3.1 Supply Evaluation ..............................................................................................15 3.2 Storage Evaluation.............................................................................................16 3.2.1 Existing Storage Reservoirs....................................................................16 3.2.2 Storage Requirements............................................................................18 3.2.3 Storage Evaluation .................................................................................21 3.2.4 Storage Deficiencies...............................................................................24 3.3 Carrying Capacity Analysis ................................................................................25 3.4 Distribution System Evaluation...........................................................................27 3.4.1 Summary of System Deficiencies ...........................................................27 3.4.2 Description of Distribution System Improvements...................................30 3.4.3 Annual Main Replacement......................................................................32 4.0 Water Rights Analysis, System Reliability and Interties...................... 33 4.1 Water Rights Analysis........................................................................................33 4.1.1 Existing Water Rights .............................................................................33 4.1.2 Current and Projected Usage .................................................................36 4.1.3 Adequacy of Water Rights ......................................................................36 5.0 Cooperative Watershed Protection Program........................................ 39 6.0 Operations and Maintenance Program ................................................. 39 7.0 Distribution Facilities Design and Construction Standards.................. 39 8.0 Improvements Program........................................................................ 40 City of Port Townsend i September 2014 2014 Water System Plan Update 9.0 Financial Analysis.................................................................................. 42 9.1 Historic Financial Performance ..........................................................................42 9.2 Water Rates.......................................................................................................45 9.3 Additional Sources of Funds ..............................................................................46 9.4 Fiscal Impacts of Improvement Program............................................................47 9.5 Tiered Service....................................................................................................49 List of Tables Table 2-1. Historical Population ........................................................................................... 5 Table 2-2. Historical Service Connections............................................................................ 5 Table 2-3. Master Meter Flow Data (mgd)............................................................................ 8 Table 2-4. Variation in Demand (mgd) ................................................................................. 8 Table 2-5. Average Day Consumption (mgd)......................................................................10 Table 2-6. Non-Revenue Water (mgd) ................................................................................11 Table 2-7. Base Year Equivalent Residential Units (ERUs) ................................................12 Table 2-8. Population and Demand Estimates....................................................................13 Table 3-1. Supply Evaluation for the Total System..............................................................16 Table 3-2. Existing Storage Reservoirs...............................................................................17 Table 3-3. Demands Used for Storage Evaluation ..............................................................19 Table 3-4. Low Zone Storage Evaluation............................................................................22 Table 3-5. High Zone Storage Evaluation ...........................................................................23 Table 3-6. Water System Physical Capacity Documentation based on MDD ......................26 Table 3-7. Key Fire Flow Locations in the City....................................................................29 Table 4-1. Existing Water Rights Status..............................................................................34 Table 4-2. Storage Reservoir Rights...................................................................................35 Table 4-3. Forecasted Water Rights Status ........................................................................37 Table 8-1. Improvements Program (cost estimates presented in 2014 dollars)...................41 Table 9-1. Historic Financial Performance for Water Utility Fund (411)...............................43 Table 9-2. Historic Financial Performance for Water CIP Fund (411-925)...........................44 Table 9-3. Bonds and Loans...............................................................................................45 Table 9-4. 2014 Water Rates (per month)...........................................................................46 Table 9-5. Adopted Annual Rate Increases.........................................................................46 Table 9-6. Projected Revenues and Expenses ...................................................................49 List of Figures Figure 2-1. Monthly Variation in Demand at the City's Master Meter..................................... 9 Figure 2-2. Monthly Variation in Consumption....................................................................... 9 Figure 2-3. Projected Demand .............................................................................................14 City of Port Townsend ii September 2014 2014 Water System Plan Update KR List of Appendices Appendix A Summary of Largest Users Appendix B Water Use Appendix C Figures 3-1 — 3-7 from the 2008 Water System Plan Appendix D Local Government Consistency Appendix E Chlorine Contact Time Calculation Appendix F Hydraulic Profile Appendix G SEPA Checklist and Determination City of Port Townsend iii September 2014 2014 Water System Plan Update F)l This Page Intentionally Left Blank City of Port Townsend iv September 2014 2014 Water System Plan Update Executive Summary The purpose of the 2014 Water System Plan (2014 WSP) is to update the 2008 Water System Plan (2008 WSP) for a 3-year period that will be in effect beginning September 1, 2014 through September 1, 2017. At the end of the period, the City's water treatment plant that complies with the USEPA's Long-Term 2 Enhanced Surface Water Treatment Rule (LT2) will be completed and in operation. The City's current plan, approved in July 2008, is comprehensive. The Washington Department of Health (DOH) met with the City in March 2014, and specified sections that would be updated. Other sections do not need to be updated and will remain valid for the length of approval of this Plan. DOH and the City agreed that the update would be valid for three years to allow the City to install filtration and evaluate the changes needed to the system once the filtration system is online. The City has committed to meeting approximately one year prior to the expiration of this update to discuss the scope of the next water system plan update. The following sections describe information DOH requested that would be updated for the 2014 WSP. No updates to Sections 1.0, 5.0, 6.0, and 7.0 have been made for the 2014 WSP. However the City developed an interim Watershed Protection Plan which will be implemented until the water treatment plant is operational. Only portions of Section 3.0 and 4.0 have been updated to address the information requested by DOH. Sections 2.0, 8.0, and 9.0 have been updated in their entirety. Basic Planning Data DOH requested that the following basic planning data be updated: Population, service connections, equivalent residential unit (ERU) data, large water users, monthly and annual production and consumption, annual water use by customer class, and annual water use for wholesale or other systems. Section 2.0 has been updated to include the above information. The following describes the location of the updated information. • Population and Service Connections (Section 2.1.1) —The population of the City and adjacent service areas has grown from 9,716 (2008) to 9,936 (2013). The total number of service connections has grown from 4,533 (2008) to 4,684 (2013). • ERU data (Section 2.1.2 and Table 2-7) —The ERU value calculated from the average single family residential water usage between 2009 and 2013 is 130 gallons per day (gpd)/ERU. • Large Water Users (Appendix A) —The average annual consumption of the 25 largest users in the City's water system totaled 0.141 million gallons per day (mgd) in 2013 which is approximately 16% of the total consumption in the system. • Monthly and Annual Production and Consumption (Section 2.1.2 and Table 2-3, Table 2-4, Table 2-5, Figure 2-1, and Figure 2-2) —The average day demand (ADD) averaged from 2009 to 2013 is 0.936 mgd. The maximum day demand MDD/ADD peaking factor is calculated to be 2.1, and the peak hour demand PHD/MDD is calculated to be 1.18. • Annual Water Use by Customer Class (Section 2.1.2 and Table 2-5 and Table 2-6) — The Residential customer class has the largest consumption averaging 69% of the total consumption in the City. The Commercial, Government, and Irrigation customer classes consume an average of 18%, 6%, and 6% respectively of the total consumption within the City. City of Port Townsend 1 September 2014 2014 Water System Plan Update The average distribution system leakage over the last three years (2011 — 2013) is 7% of the total supply record at the City's master meters. • Annual Water Use for Wholesale Users (Appendix B) —There are two wholesale users supplied by the transmission system: The Port Townsend Paper Company and Jefferson County Public Utility District (LUD No 1). The water usage at the Port Townsend Paper Company averaged 14.7 million gallons per day from 2009 to 2013. The water usage for the Jefferson County PUD averaged 0.35 million gallons per day from 2009 to 2013. System Analysis DOH requested that a system carrying capacity analysis be provided that identifies the limiting factors for the system and associates them with equivalent ERU's (a table similar to Worksheet 6-1 of DOH Water System Design Manual). DOH has requested a summary of hydraulic capacity results which describe any areas which do not meet minimum pressure requirements. Section 3.0 has been updated to include the above information. The following describes the location of the updated information. • Carrying Capacity Analysis (Section 3.3 and Table 3-6) —Supply and storage evaluation supporting the carrying capacity analysis is contained within Section 3.1 and 3.2. Currently, standby storage is the limiting capacity with an ERU capacity of 15,503. By 2016, the treatment plant scheduled to be operating will be the limiting capacity in the system with a carrying capacity of 11,024 ERUs. • Summary of Hydraulic Capacity Results (Section 3.4 and Appendix C) — Modeling analysis conducted during the 2008 WSP identified areas of pressure and fire flow deficiencies along with recommended improvements to address those deficiencies. The analysis is still valid for the City's distribution system and the summary of results is provided in the sections mentioned above. Capital Improvement Plan DOH requested that the City provide an updated capital improvement plan (CIP) for at least the next 3 years. Section 8.0 of the 2008 WSP has been updated with a CIP for the years 2014 through 2017. The major capital projects scheduled between 2014 and 2017 are the water treatment plant and the 5-MG Reservoir replacement and finished water booster pumping station. Other capital projects include general fire flow and distribution system improvements, 1-MG Standpipe painting, Big Quilcene diversion repairs, the Andrews Creek pipeline crossing repair, and water system plan revisions. Financial Analysis DOH requested that a budget analysis be provided for the period of 2014 through 2017 identifying any reserves the City has and how the financial situation will be impacted by the projects identified in the CIP. DOH also requested a summary of the current rate structure with a discussion of any potential changes to the rates because of the CIP. Section 9.0 has been updated to include the above information. The following describes the location of the updated information. • Balanced Budget and Fiscal Impact of Improvement Program (Section 9.4 and Table 9-6) City of Port Townsend 2 September 2014 2014 Water System Plan Update H]� • Current Rate Structure— (Sections 9.2 and 9.3 and Table 9-4) —The City has adopted annual rate increases of 6% in 2014, 3% in 2015, 3% in 2016, and 2% in 2017. Water Rights Self Assessment, Local Government Consistency, and SEPA DOH requested that the City provide an updated Water Rights Self Assessment for review by the Department of Ecology (DOE), local government consistency checklists signed by both the City and County, and a signed State Environmental Policy Act (SEPA) checklist and determination. Section 4.0 has been updated to include the Water Rights Self Assessment. The signed local government consistency checklists and SEPA checklists are included in Appendix D and G. City of Port Townsend 3 September 2014 2014 Water System Plan Update 1.0 Description of the Water System This section has not been revised for the 2014 WSP. 2.0 Basic Planning Data and Water Demand Forecasting This section defines the planning data, future land use, and future water demands for the City of Port Townsend. Planning data and water use forecasts are used for system planning purposes to assess the capability of the system to meet near-term and long-term demands. As developing additional sources of water supply typically takes a long time, it is common to project needs 20 years into the future. Water use forecasts are important for determining infrastructure needs such as transmission, storage, treatment, and distribution facilities. 2.1 Current and Past Conditions Data readily available for providing historical and current water use information is presented in this section. This data includes information on population served, number of service connections, water consumption (as measured by individual service meters), and demand (as measured by master meters). 2.1.1 Population and Service Connections Past growth trends are important in predicting future growth. Growth estimates for the City of Port Townsend were developed in consideration of historical trends. Current and past population and water service connection estimates for 2000 through 2013 are presented in Table 2-1 and Table 2-2, respectively. City Service Area The population data presented herein for 2000 and 2010 are based on U.S. Census data while the years between are estimates from the Washington State Office of Financial Management. City billing record information was used to identify the type and number of service connections within the city limits. The City's utility billing system was changed in 2003 which, due to differences in service meter accounting, required an interpolation of the number of service connections between 1995 and 2002 to determine the Year 2000 and 2001 connections. Adjacent Service Areas No historical population data exists for the out of town service area. Population for this area was estimated based on the number of service connections multiplied by the estimated persons-per-household figure in the City of Port Townsend (approximately 2.34). The City of Port Townsend's out of town service area expanded in 2002 with the acquisition of the Glen Cove service area from the Jefferson County PUD. City of Port Townsend 4 September 2014 2014 Water System Plan Update Table 2-1. Historical Population Customer 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Classification City of Port Townsend 8,344 8,441 8,554 8,433 8,543 8,796 8,889 8,945 9,033 9,034 9,113 9,180 9,185 9,225 Adjacent Service Areas 227 234 400 566 573 599 620 662 683 693 709 711 721 711 Total 1 8,571 1 8,675 8,954 1 8,999 9,116 1 9,395 1 9,509 1 9,607 1 9,716 1 9,727 1 9,822 1 9,891 1 9,906 1 9,936 Table 2-2. Historical Service Connections Customer Classification 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 City of Port Townsend Residential 3,393 3,442 3,491 3,546 3,632 3,702 3,755 3,796 3,831 3,881 3,898 3,914 3,933 3,961 Commercial 373 374 375 300 302 305 304 305 308 311 316 317 313 313 Government 118 125 132 58 57 58 59 57 57 56 55 55 56 56 Subtotal In-City 3,884 3,947 3,998 3,904 3,997 4,065 4,778 4,758 4,796 4,248 4,269 4,286 4,302 4,330 Adjacent Service Areas Residential 97 100 103 242 245 256 265 283 292 296 303 304 308 304 Commercial 165 170 175 44 45 45 45 45 45 46 46 46 1 46 46 Government -- -- 0 0 0 0 0 0 4 4 4 4 4 Subtotal Adjacent 262 270 278 286 290 301 310 328 337 346 353 354 358 354 Total 3,852 3,950 4,162 4,190 4,281 4,366 4,428 4,486 4,533 4,594 4,622 4,640 1 4,660 4,684 City of Port Townsend 5 September 2014 2014 Water System Plan Update H0� Service connection data for the adjacent service areas (West-of-City and Glen Cove) was unavailable from 1995 to 2002. Therefore data was interpolated between 1994 and 2003 and these relative percentages were then used to determine estimated service connection totals and subtotals in 2000, 2001, and 2002. 2.1.2 Water Use The term demand refers to total water supplied, as measured by the City's master meters. Demand differs from consumption in that consumption refers only to the quantity of water actually purchased by customers. The difference in quantity between demand and consumption is referred to as "non-revenue water." Demand Current and past demand is presented in Table 2-3. Figure 2-1 depicts the monthly variation in demand. The data presented in Table 2-3 and Figure 2-1 is based on the City's master meter readings. It is presented in million gallons per day (mgd) and represents the annual and monthly average daily demand for the service area. The master meter total is based on two separate meters used to measure flow into the standpipe and 5 million gallon reservoir. Analysis of data since 1998 indicated the master meter volume was lower than the customer meter consumption. As a result, the City performed a series of volume tests for both the 1-MG Standpipe and 5-MG Reservoir meters to determine the meter accuracies. Volume tests were performed over a range of flows that are typical of the City's actual operations. The testing concluded that both meters were undercounting the actual flow passing through the meters. Correction factors for both meters were developed and have been applied to the meter readings presented in this Plan. Additional historical demand and consumption information is presented in Appendix B. Current or "Base Year" average water demand was estimated by averaging data from 2009 through 2013. These averages were computed for the purpose of establishing baseline values for projecting future growth in demand while minimizing the impact of typical annual variations. The Base Year averages are assumed to represent 2013 demand. Demand is characterized in this Plan as average day demand (ADD), maximum day demand (MDD), and peak hourly demand (PHD). These variations are necessary for effective water system planning and infrastructure sizing. ADD represents the average water conveyed to the distribution system throughout the year, including non-revenue uses, and is used to estimate the total annual amount of supply needed. MDD represents the day of the year during which the maximum amount of water is conveyed to the system. Supply, pumping, and treatment facilities are typically designed with a capacity equal to the projected future MDD. PHD represents the maximum amount of water supplied during a 1-hour period during the day when the MDD occurs. PHD is used for sizing distribution system piping and distribution system reservoir storage. More specifically, distribution system storage reservoir capacity is typically developed based on a combination of ADD, MDD, and PHD, and their relative differences. ADD, MDD, and PHD are summarized in Table 2-4. City of Port Townsend 6 September 2014 2014 Water System Plan Update H0� Both MDD and PHD data are available from master meter SCADA system readings which are used as the values for this Plan. Five years of data were averaged to determine an overall ADD, MDD and PHD for the system for the Base Year. Averaging the data for past five years was used in order to account for any peak years that would not be representative of a normal year. The ratios of MDD/ADD and PHD/MDD are often referred to as "demand ratios" or "peaking factors" and are computed for the purpose of characterizing demand in a given water system. The demand ratios determined from the Base Year ADD, MDD, and PHD data are: MDD/ADD = 2.1 PHD/MDD = 1.18 Consumption Consumption for customers is measured at individual service meters. Customers are billed for water service every month. Current and past consumption along with per-capita consumption is presented in Table 2-5. Figure 2-2 depicts the monthly variation of consumption within the City's service area. Understanding per-capita water usage is important in identifying water use trends as well as how City water customers' usage compares with customers of other water utilities. Per-capita consumption was computed by dividing residential consumption by population. Appendix B includes a summary of the largest 25 water users and their monthly water usage recorded during the 2013 billing record. Non-Revenue Water Non-revenue water is the difference between the volume of water entering the distribution system as measured by the supply meters (demand) and the volume actually measured and billed to customers (consumption). It includes the following types of uses: • Leakage from distribution system pipelines, reservoirs, valves, and hydrants; • Water used for street cleaning, firefighting, sewer and water main flushing, reservoir cleaning and other unmetered public uses; and • Master meter and/or service metering inaccuracies. Distribution system leakage is calculated by subtracting metered and other estimated water use from master meter demand. A calculation is presented in Table 2-6. The average distribution system leakage is approximately 7 percent of the total quantity of water passing through the City's master meter from 2011 to 2013. City of Port Townsend 7 September 2014 2014 Water System Plan Update Table 2-3. Master Meter Flow Data(mgd) Service Meter 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Base Year Standpipe Master Meter 0.245 0.241 0241 0.245 0.236 0.261 0.265 0.291 0.196 0.141 0.126 0.116 0.144 0.195 0.144 5-MG Reservoir Master Meter 0.907 0.813 0.877 0.969 0.871 0.825 0.908 0.775 0.764 0.864 0.789 0.78 0.749 0.776 0.792 Total Master Meters 1.152 1.055 1.118 1.214 1.108 1.085 1.173 1.067 0.961 1.005 0.915 0.896 0.893 0.971 0.936 Total 1.152 1.055 1.118 1.214 1.108 1.085 1.173 1.067 0.961 1.005 0.915 0.896 0.893 0.971 0.936 Notes: 1.ADD and MDD values include correction factors to account for the under registering meters. Table 2-4. Variation in Demand(mgd) Demand Type 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Base Year ADD 1.152 1.055 1 A 18 1214 1.108 1.085 1.173 1.067 0.961 1.005 0.915 0.896 0.893 0.971 0.936 MDD 2.520 2.665 2.310 2.583 2.609 2.327 2.573 2.398 1.977 2.223 2.004 1.768 1.880 1.935 1.962 PHD -- -- -- 3.192 2.703 2.539 2.951 2.706 2.274 2.605 2.403 2.036 2.357 2.127 2.306 Notes: 1.ADD and MDD values include correction factors to account for the under registering meters. City of Port Townsend 8 September 2014 2014 Water System Plan Update 2.00 1.80 1.60 1.40 1.20 b E 1.00 0.80 M E 0.60 0.40 0.20 0.00 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2008 2009 2010 2011 2012 2013 Figure 2-1. Monthly Variation in Demand at the City's Master Meter 1.80 1.60 1.40 1.20 0 1.00 +2 E 0.80 c 0.60 0 v 0.40 0.20 0.00 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2008 2009 2010 2011 2012 2013 Figure 2-2. Monthly Variation in Consumption City of Port Townsend 9 September 2014 2014 Water System Plan Update Table 2-5. Average Day Consumption(mgd) Customer Classification 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Base Year Consumption within City Limits Residential 0.595 0.614 0.619 0.679 0.638 0.633 0.648 0.632 0.579 0.618 0.560 0.544 0.534 0.550 0.561 Commercial 0.328 0.337 0.350 0.187 0.166 0.167 0.172 0.167 0.155 0.149 0.148 0.146 0.147 0.152 0.148 Government 'Note 3 1 0.106 0.094 1 0.099 0.202 1 0.083 0.070 1 0.067 1 0.058 0.055 1 0.049 0.053 1 0.056 Irrigation 0.070 0.059 0.057 0.070 0.062 0.052 0.059 0.052 0.050 0.050 0.059 0.054 Subtotal of City 0.923 0.951 0.969 1.042 0.957 0.956 1.092 0.944 0.857 0.893 0.818 0.794 0.779 0.813 0.819 Consumption in Adjacent Areas Served Residential 0.018 0.017 -- 0.046 0.041 0.040 0.046 0.045 0.044 0.051 0.043 0.042 0.040 0.041 0.04 Commercial -- -- 0.010 0.007 0.009 0.010 0.013 0.011 0.009 0.007 0.006 0.005 0.007 0.01 Government -- -- 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00 Irrigation 0.000 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.001 0.00 Subtotal Adjacent Areas 0.018 0.017 0.047 0.057 0.048 0.049 0.055 0.058 0.055 0.061 0.051 0.049 0.047 0.050 0.051 Combined Total 0.941 0.968 1.016 1.099 1.006 1.005 1.148 1.002 0.911 0.954 0.868 0.843 0.826 0.864 0.871 Residential Per-Capita Consumption(gpcd) Per-Cap Ave Day Consumption 72 73 68 81 74 72 73 70 64 69 61 59 58 60 61 Notes: 1.The City of Port Townsend acquired the Glen Cove water system in 2002.No data was available on the population within Glen Cove before 2003. 2.Irrigation data not available until utility billing system changed in 2003. 3.Commercial and Government accounts were combined between 1999 and 2002. City of Port Townsend 10 September 2014 2014 Water System Plan Update Table 2-6. Non-Revenue Water(mgd) 3 Year Water Use Category 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Average (2011- 2013) Total City Demand 1.152 1.055 1.118 1.214 1.108 1.085 1.173 1.067 0.961 1.005 0.915 0.896 0.893 0.971 0.920 Total City Consumption 0.941 0.968 1.016 1.099 1.006 1.005 1.148 1.002 0.911 0.954 0.868 0.843 0.826 0.864 0.844 Non-Revenue Water Estimated unmetered/other metered water use 0.032 0.008 0.005 0.014 0.016 0.014 0.017 0.010 0.008 0.014 0.011 Distribution System Leakage 0.211 0.086 0.102 0.115 0.070 0.073 0.020 0.051 0.033 0.037 0.030 0.042 0.059 0.093 0.065 Percentage of Total Demand 18.3% 8.2% 9.1% 9.5% 6.3% 6.7% 1.7% 4.8% 3.5% 3.7% 3.3% 4.7% 6.7% 9.6% 7.0% Notes: 1. Base Year for non-revenue water is three year period(2011-2013)to correspond with the Municipal Water Law. City of Port Townsend 11 September 2014 2014 Water System Plan Update Equivalent Residential Units (ERUs) An "equivalent residential unit" (ERU) is a unit of measure used to equate non-residential or multi-family residential water use to a specific number of single family residences. For example, if a system has a capacity to serve 100 ERUs, it has a capacity to serve 100 full-time single family residences. Similarly, it would be able to serve any combination of commercial, industrial, and residential customers provided that the quantity of water used is equivalent to the projected needs of 100 full-time single family homes (or 100 ERUs). The consumption per single-family residence is first determined by dividing the total single- family consumption by the number of single-family connections. Then the number of ERUs is computed for each customer category by dividing consumption per customer class by consumption per single-family residence. ERUs are a measure of system capacity in units of single-family residences. The calculated ERU value is 130 gpd/ERU. Average day consumption data was used to develop the ERU data for residential and non- residential uses. The data was based on an average of 2009 to 2013 consumption to account for any peak years that would not be representative of a normal year. The current capacity of the City's water system, based on ERUs, is presented in Table 2-7. The ERU information is comprised of customers in the City and adjacent to the City. The conversion of non-revenue water to ERUs includes the meter correction factors for the Base Year ADD. Table 2-7. Base Year Equivalent Residential Units (ERUs) Consumption per Service Number of Consumption Single-Family ERUs(') Connections (mgd) Residence (gpd) Residential(2) 4,254 0.605 Single- 0.535 Family 4,126 130 4,126 Multi- 0.070 Family 128 130 540 Non-Residential(3) 462 0.266 130 2,055 Non-Revenue Water 0.065 130 502 Total 4,716 0.936 7,223 Notes: (1) ERUs were computed using"Base Year"data(average of 2009 through 2013) (Z).Single Family and Multi-Family customer categories are a subset of the Residential customer category and the connections and consumption associated with each is provided in Appendix B. (3) Non-Residential includes Commercial,Government,and Irrigation connections and consumption. City of Port Townsend 12 September 2014 2014 Water System Plan Update 2.2 Estimated Future Conditions Estimated future population and land and water use are presented in this section. The estimated future conditions are important for planning purposes for the City to meet their long- term demands. 2.2.1 Land Use Current land use for the City consists of a mixture of residential, mixed use, commercial, industrial, public facilities, parks, and open space. The City's historical land use pattern was established during the 1800s. During this period, plats were created with almost no regard to the topography or other natural physical limitations of the land. The result of this platting activity is a largely uniform series of approximately 11,100 parcels, typified by the 50-foot by 100-foot lot. No changes in current land usage that would significantly impact estimated future water demand is predicted. 2.2.2 Population and Demand Population and demand are presented together in this section because of their inter-relationship in estimating future demand. Estimated future population and demand for the 6-year and 20- year planning horizons are presented in Table 2-8 and Figure 2-3. Table 2-8. Population and Demand Estimates Population and Demand Base Year 2019 2033 (2013) Population 9,936 10,550 12,144 ERUs 7,223 7,749 8,907 Total Demand (m d) ADD 0.94 1.00 1.15 MDD 1.97 2.11 2.42 PHD 2.32 2.49 2.86 Notes: 1. Population presented in this table is for the entire Port Townsend water system service area which includes the portion of the service area outside the City. 2. City of Port Townsend has a contractual obligation to supply a maximum of 0.28 mgd to Jefferson PUD for LUD No.3. Water is supplied from the OGWS at Four Corners and does not utilize in-town distribution storage reservoirs. PUD plans to switch LUD No.3 to its ground water system by the end of 2016. 3. ADD in the above table in acre-feet/year for Base Year,2019,and 2033 is 1,049,1,125,and 1,293, respectively. Projections for the Base Year (2013), 6-year (2019) and 20-year (2033) forecasts are based on the Office of Financial Management's 2012 Growth Management Population Projection medium growth rate of 1.01% compounded annually for Jefferson County. It is estimated between 2013 and 2033 Port Townsend will grow by 2,208, a 22% overall increase in population. City of Port Townsend 13 September 2014 2014 Water System Plan Update H]� Water demand forecasts for the City service areas were developed using the Base Year demand which was the average of 2009-2013. The projected ADDs, MDDs, and PHDs for the City were escalated at the same rate as the projected population estimates, which is 1.01% compounded annually. An additional demand is added to the water demand forecast to account for a new potable water connection to the Port Townsend Paper Corporation. Before the treatment plant is on line the Port Townsend Paper Corporation will connect to the City's distribution system for potable water requirements. This connection will provide water for approximately 300 individuals working at the mill. Demand is estimated to be 35 gpd per employee based on a "Factory" type water usage in Table 5-2 of the Water System Design Manual (DOH 2009). The demands are included in the 2019 and 2033 projections. Estimated future demand is presented in Figure 2-3. 3.50 3.00 Peak Hourly Demand amp 2.50 o : 2.00 on am 00 0 Maximum Day Demand E 1.50 aEi 0 1.00 - Average Day Demand 0.50 - 0.00 2010 2015 2020 2025 2030 2035 Year Figure 2-3. Projected Demand Of particular interest with respect to the demand data presented in Table 2-8 and Figure 2-3 is the projected MDD. To meet customer needs, supply capacity must be equal to or greater than MDD. Demand in excess of MDD, such as PHD, is typically met by distribution system storage capacity. To meet estimated future demand the City must have supply capacity equal to or greater than the projected MDD. The year 2033 projected MDD is approximately 2.4 mgd. City of Port Townsend 14 September 2014 2014 Water System Plan Update KR 3.0 System Analysis 3.1 Supply Evaluation The City's system is supplied by unfiltered surface water from both the Big Quilcene and Little Quilcene Rivers. Water from the Big Quilcene River, approximately 30 miles south of the City, is transported by the Olympic Gravity Water System Pipeline (OGWS) pipeline to the City. The Little Quilcene River supply ties into the OGWS downstream of Lords Lake. The City is bound by a lease agreement with the Port Townsend Paper Company that restricts the City's water usage to 5 mgd and allows the Mill to use all of the water supply flowing through the transmission system not expressly reserved for City use or obligations through the year 2020. Out of that 5 mgd, the City is contractually obligated to supply up to 0.28 mgd to Jefferson County (Jefferson PUD) to meet the supply needs of LUD No. 3 until 2015. The resulting supply available for the City's municipal uses is 4.72 mgd. The PUD's daily contract quantity may be reduced or cancelled with four years of advanced notice to serve new residential, commercial or industrial customers within the City that cannot be met from the uncommitted City allocation from the OGWS. Port Townsend's new water treatment plant will be constructed down steam of Four Corners and will not be able to provide treated water via this connection to LUD No. 3. The PUD intends to connect LUD No. 3 to the Quimper ground water system by 2016, which will free up the 0.28 mgd for City use. The City plans to construct a water treatment plant which will be completed by 2016. Once completed, the available supply to the City's distribution system will be 3.0 mgd which is the planned treatment plant capacity. Table 3-1 provides an evaluation of existing and future supply capacity to meet the projected demands from Table 2-8. As shown in the table below, the City has adequate water rights and capacity to meet current and future peak flows. City of Port Townsend 15 September 2014 2014 Water System Plan Update Table 3-1. Supply Evaluation for the Total System Year Base Year 2019 2033 Max c5� (2013) Projected ERUs and Demand(1) Equivalent Residential Units(ERU's) 7,223 7,749 8,907 11,024 Average Day Demand(mgd) 0.94 1.00 1.15 1.43 Maximum Day Demand(mgd) 1.97 2.11 2.42 3.00 Evaluation of Existing Sources Available Existing Source(mgd) OGWS Contract Limit(2) 4.72 5.00 5.00* 5.00 Water Treatment Plant(3) 3.00 3.00 3.00 Total Available Source-(mgd)(4) 4.72 3.00 3.00 3.00 Source Surplus/(Deficiency)-Existing Sources(mgd) 2.76 0.89 0.58 0.00 Notes: (1) Projected demands taken from Section 2. ERUs calculated as Average Day Demand/ERU water use factor(130 gpd/ERU). (2) The City's water use is limited to 5.0 mgd from the OGWS based on a lease contract with Port Townsend Paper.Currently, the City also supplies LUD No.3 with a maximum of 0.28 mgd,leaving 4.72 mgd available to the City. By 2016,the LUD No.3 intends to connect to new water source which will allow 5.0 mgd to be available to the City. *The water system lease with the mill will be renegotiated by 2020 which will determine future water use contract limits. (3) The planned capacity of the water treatment plant is 3.0 mgd which will be online by 2016. (4) Total available source is based on the limiting source capacity of the contract limit or the water treatment plant,whichever is less. (5) Maximum ERUs to be served with current sources,based on maximum production rate(i.e.,24 hours per day). Max ERUs=Total Available Source/Maximum Day Demand per ERU(272 gpd/ERU). 3.2 Storage Evaluation This section evaluates the City's storage facilities, requirements, and needs. Water storage directly serving the distribution grid is a critical element of a water system, particularly with respect to enhancing the reliability of meeting customer demand during a variety of demand conditions. Distribution system storage enables periodic peak customer demands to be met, provides water to fight fires, and maintains a portion of the storage volume as standby storage for emergencies. Providing ample storage makes it possible to avoid over-sizing supply facilities such as pump stations, supply pipelines, and treatment facilities, to meet periodic peak customer demands. With adequate storage, supply facilities can be sized based on reduced demand criteria, such as the anticipated MDD. In turn, reservoir storage supplies the flow to meet demand in excess of the MDD. 3.2.1 Existing Storage Reservoirs The City maintains and operates two storage reservoirs to meet fluctuations in daily demand within the distribution system. A description of these reservoirs is presented in this section and a summary of reservoir data is presented in Table 3-2. City of Port Townsend 16 September 2014 2014 Water System Plan Update 01 Table 3-2. Existing Storage Reservoirs Name Capacity Overflow Normal High Reservoir Year Built (MG) Elevation Water Dimensions (feet) Elevation (height x diameter (feet) in feet) 1-MG Standpipe 1 375 373 84 x 47 1995 5-MG Reservoir 5 328 326 38 x 155 1979 Two distinct pressure zones are served from these reservoirs, the "High Zone" and the "Low Zone." Before 1998, the City was served from a single pressure zone (the Low Zone). Service pressures ranged from above 130 psi near the shoreline of Puget Sound to less than 20 psi at the higher elevations within the service area. To increase system pressures, the City installed a new, taller storage tank to provide higher service pressures to areas of the City with higher elevations. With the extension of the new 24-inch diameter pipeline to the 1-MG Standpipe completed in 1998, the initial phase of the High Zone was created. The High Zone serves areas generally above 210 feet elevation, resulting in a High Zone pressure range of approximately 35 psi to 70 psi. The City expanded the extent of the High Zone to adjacent northwest areas of similarly higher elevations in 2004 to ensure service pressures in that area were maintained above the DOH minimum criterion of 30 psi. The revised Low Zone pressure range now is from about 50 psi to above 130 psi. The High Zone extends beyond the City limits to the west and south. Both reservoirs are located at the intersection of 20th Street and the northern extension of Spring Street. 5-MG Reservoir The 5-MG Reservoir was constructed and placed into service in 1979. At the time that it was constructed, the 5-MG Reservoir served the entire City service area. However, once the High Zone was developed, the 5-MG Reservoir then served the remainder of the City not included in the High Zone (referred to hereafter as the "Low Zone"). The 5-MG Reservoir has an overflow elevation of 328 feet and a typical high-water elevation of approximately 326 feet. Polypropylene baffles were installed in the 5-MG Reservoir in 1995 and the outlet and inlet to the reservoir were revised as part of the City's plan to meet the disinfectant contact requirements of the Surface Water Treatment Rule (SWTR). The baffles consist of two floor-to- ceiling curtains that force the water to circulate through the reservoir in an indirect manner, thus increasing the time the water spends within the reservoir. Water enters the reservoir from an inlet diffuser at one side of the reservoir, and exits through an outlet diffuser at the other side of the reservoir. 1-MG Standpipe In 1995 the City completed construction of a 1-MG steel standpipe designed to boost system pressure in areas of the City at higher elevations. A standpipe is defined as a storage reservoir with its height greater than its diameter. Thus, the 1-MG Standpipe is a "tall" water storage reservoir. The 1-MG Standpipe has an overflow elevation of 375 feet with a corresponding capacity of roughly 1 MG. With the completion of the water treatment plant, the standpipe will operate at a minimum hydraulic gradient of 370 feet. Four floor-to-ceiling polypropylene baffle curtains were installed in the 1-MG Standpipe to meet disinfectant contact time requirements. City of Port Townsend 17 September 2014 2014 Water System Plan Update Morgan Hill Booster Station A booster station is located adjacent to the High School and a 2,000 gallon storage tank on top of Morgan Hill to maintain distribution system pressure for Morgan Hill, a high elevation zone within the 5-MG Reservoir service area. 3.2.2 Storage Requirements In assessing distribution system storage needs, several components must be considered. Water storage comprises five distinct components: • Operational storage • Equalizing storage • Fire suppression storage • Standby storage • Dead storage (if any) Effective storage volume is comprised of operational, equalizing, fire suppression, and standby storage elements. "Dead" storage is that volume component of a reservoir that is not effective, because it is too low to be withdrawn to meet system needs while maintaining required system pressure. The reservoir storage volume requirements presented herein were developed based on the criteria established in the DOH Water System Design Manual. Equalizing and standby storage requirements are based on the demands of the system served directly by the storage reservoir(s). A summary of the system demands used for estimating storage requirements is presented in Table 3-3. The combined totals of the Low and High Zone components of these demands are the same as those presented in Table 2-8. The relative split between the two zones has varied between 13-27 percent for the High Zone and 87-73 percent for the Low Zone since the northwest side of the service area was connected to the High Zone in 2004 (Table 2-3). Between 2009 to 2013, the relative split averaged 15 percent for the High Zone and 85 percent for the Low Zone. Those percentages are used to estimate future demand in Table 3-3 City of Port Townsend 18 September 2014 2014 Water System Plan Update Table 3-3. Demands Used for Storage Evaluation Base Year (2013) 2019 2033 High Zone ERUs 1,083 1,162 1,336 ADD 0.14 0.15 0.17 MDD 0.29 0.32 0.36 PHD 0.35 0.37 0.43 Low Zone ERUs 6,140 6,586 7,571 ADD 0.80 0.85 0.98 MDD 1.67 1.79 2.06 PHD 1.97 2.12 2.43 Total City System ERUs 7,223 7,749 8,907 ADD 0.94 1.00 1.15 MDD 1.97 2.11 2.42 PHD 2.32 2.49 2.86 Operational Storage Operational storage is the volume within a storage reservoir or multiple storage reservoirs between the normal high and low water levels. Operational storage is important when the mode of filling the reservoir(s) is considered. If storage reservoirs are filled by pumping, it is important to have adequate operational storage to avoid excessive pump starts and stops. If storage reservoirs are filled by gravity with an altitude or other type of modulating control valve, it is often possible to avoid providing storage dedicated specifically as operational because pump on/off cycles are not applicable. Operational storage is the difference between the overflow elevation and the normal high water elevation shown in Table 3-2. With the completion of the water treatment plant, the normal high water level will be decreased from 373 feet to 370 feet. Equalizing Storage Equalizing storage volume is the volume needed to meet variations in diurnal system demand that exceed the capacity of the supply system. Supply facilities are typically sized with a capacity equal to the anticipated MDD. Thus, system demand in excess of MDD must be provided from the equalizing volume of the reservoir(s). The required equalizing storage, in gallons, is computed as: Required Equalizing Volume = (PHD - Supply Capacity) x 150 minutes Where: PHD = peak hour demand for the system (gpm) Supply Capacity = the combined capacity of all applicable supply sources (gpm) City of Port Townsend 19 September 2014 2014 Water System Plan Update H]� The supply capacity herein is the maximum flow available to the City. The City has a total water right of 19 mgd of which 5 mgd is reserved contractually for City use which also supplies 0.28 mgd to LUD No. 3. The remainder may be utilized by Port Townsend Paper Company. There is sufficient hydraulic capacity in the supply lines to convey this 5 mgd flow to the City's storage reservoirs. The planned capacity of the water treatment plant, which will be online by 2016, is 3.0 mgd. For the base year (2013), 4.72 mgd is used as the supply capacity in the formula above, but for planning years 2019 and 2033, 3.0 mgd is the supply capacity used in the formula. In either case, the formula results in a requirement for zero equalizing storage because the supply capacity is greater than the current or projected PHD through 2033. Fire Storage Because a fire can occur at any time during the day, fire storage must be provided in addition to operational and equalizing storage. The volume of fire storage within the reservoir must be provided at or above an elevation that ensures a minimum pressure of 20 psi to all customers during simultaneous occurrence of a fire and the MDD. Required fire flow volume is computed by multiplying the required fire flow, as established by the County Fire Marshal, by the required time duration. For example a 1,000-gpm fire flow would be multiplied by 1 hour, a 2,000-gpm fire flow would be multiplied by 2 hours, and a 3,500 gpm fire flow would be multiplied by 3.5 hours (typically 1 hour per 1,000 gpm). The required fire storage volumes for the two City pressure zones are as follows: • Low Zone: 4,500 gpm x 4.5 hours = 1.22 MG • High Zone: 3,500 gpm x 3.5 hours = 0.74 MG A water system may exclude the standby or fire storage components, whichever is smaller, from the system's total storage requirements if such a practice is not prohibited by the local Coordinated Water System Plan, local ordinance, or the local fire marshal. Because the City is not prohibited from nesting its required standby and fire storage volume, the greater of the standby or fire storage is included within the required reservoir storage volume computations for the City's system. Standby Storage Standby storage volume supplies reasonable system demands during a system emergency, such as the disruption of the water supply. Such disruptions could be caused by transmission pipeline or equipment failure, power outage, valve failure, or other system interruption. Other major system emergencies, such as those created by an earthquake, are covered under emergency system operations planning, and are not accounted for by standby storage. The DOH Water System Design Manual recommends that standby storage for systems served by a single source be computed as twice the ADD for the design year to be available to all service connections at 20 psi. SBTSS = (2 days)(ADD) Where: SBTSS = Total standby storage component for a single source system (gallons) ADD = Average day demand for the design year (gpd) City of Port Townsend 20 September 2014 2014 Water System Plan Update H0� In recognition that most of the demand in the City of Port Townsend is from residential customers, the formula for computing the standby storage volumes was simplified to be two times ADD and did not incorporate the conversion to ERUs. All of the standby storage contained in the 5-MG Reservoir (serving the Low Zone) is at an elevation that provides more than 20 psi. Due to the service elevations in the High Zone, only a portion of the standpipe volume is greater than 20 psi (above roughly elevation 340 feet). The lowest 45 feet of the 85- foot-tall Standpipe contains water that can be delivered at service pressures less than 20 psi. 3.2.3 Storage Evaluation Table 3-4 and Table 3-5 provide the storage evaluation for the Low Zone and for the High Zone. In the Low Zone, there is a storage surplus of 2.72 MG in 2033. The 5-MG Reservoir can provide storage for a maximum 14,148 ERUs. In the High Zone, there is storage deficiency of 0.38 MG. This is a result of the fire flow storage requirement (0.74 MG) that must be provided at a minimum pressure of 20 psi. Only 0.41 MG is available in the 1-MG Standpipe at a service pressure greater than 20 psi. While there is a deficiency, the storage volume is sufficient to provide a maximum of approximately 50% of the fire storage volume. The City is planning to construct a pump station to provide fire flow to the High Zone in order to mitigate the fire storage deficiency. The pump station capacity would be sized to provide a minimum of 1,850 gpm to supplement the available fire storage. City of Port Townsend 21 September 2014 2014 Water System Plan Update 01 Table 3-4. Low Zone Storage Evaluation Year 2013 2019 2033 Max(11) Projected ERUs and Demand(') Equivalent Residential Units(ERU's) 6,140 6,586 7,571 14,148 Average Day Demand(mgd) 0.80 0.85 0.98 1.83 Maximum Day Demand(mgd) 1.67 1.79 2.06 3.85 Peak Hour Demand(mgd) 1.97 2.12 2.43 4.54 Available Source(mgd) Transmission Contract Limit 4.72 5.00 5.00 5.00 Water Treatment Plant 0.00 3.00 3.00 3.00 Total Available Source(mgd)(2) 4.72 3.00 1 3.00 3.00 Required Storage Calculations Operational Storage(mg)(3) 0.32 0.32 0.32 0.32 Equalizing Storage(mg)(4) 0.00 0.00 0.00 1.01 Standby Storage(mg)(5) 1.59 1.71 1.96 3.67 Fire Flow Storage(mg)(6) 1.22 1.22 1.22 1.22 Required Storage Greater than 30 psi at highest meter(mg)(7) 0.32 0.32 0.32 1.33 Greater than 20 psi at highest meter(mg)(8) 1.91 2.03 2.28 5.00 Existing Storage Greater Than 30 psi(mg)(9) 5-MG Reservoir 5.00 5.00 5.00 5.00 Total Existing Storage at 30 psi(mg) 5.00 5.00 5.00 5.00 Storage Surplus/(Deficiency)at 30 psi(mg) 4.68 4.68 4.68 1 3.67 Existing Storage Greater Than 20 psi(mg)(9) 5-MG Reservoir 5.00 5.00 5.00 5.00 Total Existing Storage at 20 psi(mg) 5.00 5.00 5.00 5.00 Storage Surplus/(Deficiency)at 20 psi(mg) 3.09 2.97 2.72 0.00 Notes: (1) Projected demands taken from Section 2. ERUs calculated as Average Day Demand/ERU water use factor (130 gpd/ERU). (2) The total available flow is either the Contract Limit or the Water Treatment Plant capacity whichever is less. (3) Required operational storage is based on observed tank levels fluctuations. (4) Required Equalizing Storage is equal to[(PHD-Total Available Source)x 150 minutes] PHD:(Maximum Day Demand per ERU/1440)*[(C)*(N)+F]+18 (C&F values obtained from Table 5-1 in DOH Dec 2009 WSDM) (5) Required Standby Storage is(2*ADD less multi-source credit). (6) Required Fire Flow Storage=4,500 gpm x 4.5 hours. (7) Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. (8) Total required storage greater than 20 psi is equal to the total of operational,equalizing,and the greater of standby or fire flow storage. (9) The storage volume available in existing reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the Low Zone(-210 ft). (10) Maximum ERUs served by Available Storage. City of Port Townsend 22 September 2014 2014 Water System Plan Update 01 Table 3-5. High Zone Storage Evaluation Year 2013 2019 2033 Max(10) Projected ERUs and Demand(') Equivalent Residential Units(ERU's) 1,083 1,162 1,336 1,355 Average Day Demand(mgd) 0.14 0.15 0.17 0.18 Maximum Day Demand(mgd) 0.29 0.32 0.36 0.37 Peak Hour Demand(mgd) 0.35 0.37 0.43 0.44 Available Source(mgd) Flow Control Valve(1,500 gpm) 2.16 2.16 2.16 2.16 Total Available Source(mgd)(2) 2.16 2.16 2.16 2.16 Required Storage Calculations Operational Storage(mg)(3) 0.06 0.06 0.06 0.06 Equalizing Storage(mg)(4) 0.00 0.00 0.00 0.00 Standby Storage(mg)(5) 0.28 0.30 0.35 0.35 Fire Flow Storage(mg)(6) 0.74 0.74 0.74 0.74 Required Storage Greater than 30 psi at highest meter(mg)(7) 0.06 0.06 0.06 0.06 Greater than 20 psi at highest meter(mg)(8) 0.79 0.79 0.79 0.79 Existing Storage Greater Than 30 psi(mg)(9) 1-MG Standpipe 0.14 0.14 0.14 0.14 Total Existing Storage at 30 psi(mg) 0.14 0.14 0.14 0.14 Storage Surplus/(Deficiency)at 30 psi(mg) 0.08 0.08 0.08 0.08 Existing Storage Greater Than 20 psi(mg)(9) 1-MG Standpipe 0.41 0.41 0.41 0.41 Total Existing Storage at 20 psi(mg) 0.41 0.41 0.41 0.41 Storage Surplus/(Deficiency)at 20 psi(mg) (0.38) (0.38) (0.38) (0.38) Notes: (1) Projected demands taken from Section 2. ERUs calculated as Average Day Demand/ERU water use factor(130 gpd/ERU). (2) The total available flow is the capacity of the flow control valve regulating flow to the 1-MG Standpipe. (3) Required operational storage is based on observed tank levels fluctuations. (4) Required Equalizing Storage is equal to[(PHD-Total Available Source)x 150 minutes] PHD:(Maximum Day Demand per ERU/1440)*[(C)*(N)+F]+18 (C&F values obtained from Table 5-1 in DOH Dec 2009 WSDM) (5) Required Standby Storage is(2*ADD less multi-source credit). (6) Required Fire Flow Storage=3,500 gpm x 3.5 hours. (7) Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. (8) Total required storage greater than 20 psi is equal to the total of operational,equalizing,and the greater of standby or fire flow storage. (9) The storage volume available in existing reservoirs at 30 and 20 psi is based on the elevation of the highest customer (-294 ft). (10) Maximum ERUs served by Available Storage. City of Port Townsend 23 September 2014 2014 Water System Plan Update 3.2.4 Storage Deficiencies From an overall storage volume standpoint, as presented in Table 3-4, the City has adequate storage in the High and Low Zones as well as the combined system. However, the fire storage requirement for the High Zone in Table 3-5 shows the existing 1-MG available capacity in the Standpipe does not maintain a minimum 20 psi distribution system pressure during fire flow conditions. A planned pump station described in Section 3.2.3 mitigates the fire storage deficiency by transferring excess fire storage, as well as standby storage, from the 5-MG Reservoir to the 1-MG Standpipe. As a result, no additional storage volume is anticipated to be required within the 20-year planning horizon. Besides addressing storage volume requirements, the City is intent on maintaining the good condition of each of its two storage reservoirs. Doing so involves periodic re-painting of the 1-MG Standpipe as well as inspecting the condition of the 5-MG Reservoir. The 1-MG Standpipe was completed in 1995 so it's projected re-painting (inside and outside) timeframe is 2016. Re-painting costs presented in Section 8.0 are based on simply pressure washing and top-coating the exterior. The interior will need to be sandblasted after removal of the curtain baffles. The City's 5-MG Reservoir is 35 years old and is reaching the end of its service life. A replacement tank is being designed and expected to be constructed by 2016. In summary, the two storage-related improvements and activities (identified by their "Project Identification Number" to facilitate cross-referencing between with Table 8-1 and Figure 3-6 in Appendix C) planned include: • S-1: New 5-MG replacement reservoir and pump station to lift water from the 5-MG Reservoir to the 1-MG Standpipe to provide fire storage to the High Zone. • S-2: Re-Paint the 1-MG Standpipe. City of Port Townsend 24 September 2014 2014 Water System Plan Update 3.3 Carrying Capacity Analysis A key element of this WSP is the evaluation of the capacities of various water system elements and their abilities to support current and projected future water supply needs. Resulting from these evaluations are "carrying capacities," or the maximum number of equivalent residential units (ERUs) that existing facilities can support. Such analyses aid in identifying capacity deficiencies and provide the foundation for some capital improvement projects. Table 3-6 summarizes the carrying capacities associated with the City's primary water system components. This summary is formatted consistent with "Worksheet 6-1" of the DOH Water System Design Manual (December 2009). Currently, standby storage is the limiting water system component with an ERU capacity of 15,503. By 2016 when the water treatment plan is operating, the water treatment plant capacity will be the limiting component with an ERU capacity 11,024. By comparing this carrying capacity with the demand forecast presented in Table 2-8, the existing facilities are able to support current demands and needs projected through the twenty- year planning horizon. Carrying capacity analyses have not been conducted for the City's distribution facilities, for the following reasons: • It is difficult to characterize ERU carrying capacities in terms of piping, etc. • Water mains are typically designed to convey fire flows. • In the case of the City means that they are also more than adequate to support the average and maximum day demands imposed by customers. Some deficiencies have been identified throughout the system regarding the capability of certain sections of distribution piping to convey required fire flows at minimum pressures as noted in Section 3.4.2. Such deficiencies, however, are not a function of the amount of current or proposed ERUs, and therefore do not factor into a carrying capacity analysis. The City has scheduled improvements to address noted storage system deficiencies, as described in Section 8.0. Water distribution system deficiencies will be reevaluated in three years after construction of the water treatment plant, reservoir replacement and low to high zone pumping station. City of Port Townsend 25 September 2014 2014 Water System Plan Update 01 Table 3-6. Water System Physical Capacity Documentation based on MDD Note: Capacity determinations are only for existing facilities that are operational for the water system. Specific Single-Family Residential Connection Criteria: Average Day Demand (ADD): 130 (') gpd/ERU Maximum Day Demand (MDD) 272 (2) gpd/ERU Water System Service Connections correlated to ERUs Total# Service Classification Total MDD for the Connections in ERUs(5) classification,mgd(8) the classification (4) Residential 1.27 4,265 4,666 Commercial 0.33 359 1,197 Government 0.12 60 438 Irrigation 0.11 41 420 Non-Revenue(6) 0.14 N/A 502 Other(identify) Total existing ERUs(Residential+ Nonresidential+ Non-revenue+Other)=7,223 Physical Capacity as ERUs Water System Component(Facility) Calculated Capacity in ERUs for each component Source(Qi basis)(7) 18,014 Treatment(future)(8) 11,024 Equalizing Storage(at 30 psi)(9) 34,673 Low Zone 26,608 High Zone 8,065 Standby Storage(at 20 psi)(9) 15,503 Low Zone 14,148 High Zone 1,355 Distribution(10) NA Transmission Contract Limit(") 18,373 Current Water System Physical Capacity(ERUs)=14,624 (based on the standby storage capacity shown above) Future Water System Physical Capacity(ERUs)=11,024 (based on the treatment capacity shown above) Notes: (1) See Table 2-7. (2) See Section 2.1.2. (3) See Table 2-5 for Base Year consumption multiplied by MDD:ADD peaking factor of 2.1 (4) See Table 2-2,for Year 2013. (5) Calculated using MDD ERU factor(272 gpd/ERU) (5) See Table 2-6,for Base Year. (7) See Table 4-2. Based on the Big Quilcene River Diversion(19.4 mgd).Due to instream flow requirements, flow from the Little Quilcene River is limited. The maximum water usage by Port Townsend Paper is 14.5 mgd and deducted from the number of ERUs. (8) Based on the capacity of the water treatment plant(3.0 mgd)planned to be operating by 2016 (9) See Table 3-4. Assumes only source is the water treatment plant which will be online by 2016. ('o)Not calculated for reasons specified in the text. (")OGWS transmission capacity is approximately 20 mgd,however,the City bound by a lease agreement with the Port Townsend Paper Company that restricts the City's water usage to 5 mgd. City of Port Townsend 26 September 2014 2014 Water System Plan Update 3.4 Distribution System Evaluation The hydraulic modeling evaluation conducted during the 2008 WSP continues to be used as the current distribution system evaluation. Information in the following sections is shown to provide a summary of hydraulic capacity results which describe areas which do not meet minimum pressure requirements. Figures 3-1 through 3-7 from the 2008 WSP are provided in Appendix C for reference in the following section. 3.4.1 Summary of System Deficiencies The hydraulic model was used to assess the capacity of the distribution system, identify deficiencies, and develop improvements to mitigate deficiencies. Modeling runs and deficiencies are summarized in this section. Modeling run results are presented below for normal operating conditions, without fire flows, as well as for fire flow conditions. Improvements developed to mitigate the identified deficiencies are summarized in Section 3.4.2. Peak Hour Pressure Deficiencies Modeling of normal operating conditions was undertaken, based on the existing distribution system configuration (no expansion of the High Zone), under current PHD conditions as well as future PHD conditions. The purpose of using both current and future PHD conditions was to identify locations where system deficiencies of low service pressures might be anticipated — even if no such deficiencies currently exist. Current Conditions: There are currently no service pressures less than 30 psi, except at the outlet line from the 5-MG storage reservoir, where there are no service connections. See Figure 3-2 in Appendix C. Future Conditions: Service pressures slightly below 30 psi (still greater than 25 psi) may occur in an area planned for future inclusion in the High Zone. Extending the High Zone would correct this future deficiency. Identification of these anticipated (assuming anticipated growth continues) deficiencies (including the two near-deficiencies) in normal operating pressure is important because DOH is particularly sensitive to ensuring that the 30 psi minimum service pressure requirement be maintained. While it is important to note that these deficiencies do not currently exist and do not require mitigation, their identification plays a role in prioritizing of distribution system improvements related to fire flow deficiencies (discussed in the following section) as well as condition degradation (including the replacement of asbestos cement [AC] pipe). Improvements that correct moderate to severe fire flow deficiencies along with potential future normal operating pressure deficiencies warrant consideration for receiving higher priority. Fire Flow Deficiencies The existing distribution system was also modeled under future MDD conditions and simulated fire flow demand to identify available fire flow throughout the system while maintaining the DOH minimum service pressure requirement of 20 psi. Modeling simulated fire flow conditions is required by DOH during MDD conditions. Because each individual simulated fire flow demand far exceeds the background MDD, the use of current or future MDD in the model has relatively little impact. Future MDD was used instead of current as an element of conservatism as well as a recognition that many of the improvements to mitigate the identified deficiencies would be deferred to the longer-term future because of cost and availability of funds. City of Port Townsend 27 September 2014 2014 Water System Plan Update 01 The geographic distribution of available fire flow throughout the distribution system, as identified by the hydraulic model, is presented in Figure 3-4 in Appendix C. The figure reflects the available flow from single hydrants throughout the system and does not reflect flow from multiple hydrants. Simulation shows that the far northwest portion of the distribution system and the extreme south end (south end of Glen Cove) are substantially deficient with respect to available fire flow. These same areas were near the 30 psi minimum pressure under projected future PHD conditions. Also, similar to the anticipated deficiencies under future normal operating conditions discussed above, the area of the planned expansion of the future High Zone also has limited fire flow capacity. Other locations of below 1,000 gpm and below 500 gpm are also identified. Many of these locations are fed by small-diameter or dead-end mains. In addition to the fire flow modeling run undertaken to produce fire flow results. Fire flow simulations were undertaken at several specific key locations for which fire flow requirements were established by the Fire Chief. Distribution system improvements for fire flow capacity enhancement were developed based on meeting the required fire flows at these locations. These fire flow locations are shown Table 3-7 along with the required flow, current available flow, and flow available after incorporating distribution system improvements (described in Section 3.4.2) into the model. City of Port Townsend 28 September 2014 2014 Water System Plan Update Table 3-7. Key Fire Flow Locations in the City Available Fire Flow(gpm) Item Area Street Location Pressure Required Flow Before Any After All Most-Related Zone (gpm) Improvements Improvements Improvement 1 DOWNTOWN Adams&Water Low 4,500 3,315 7,080 D-8 2 HIGH SCHOOL' Pierce&Van Ness Low 4,000 906 4,000 D-8 3 HOSPITAL Sheridan&Sims Low 3,500 1,840 4,129 D-9;D-10 4 BOAT HAVEN Jefferson&San Juan Low 3,500 2,282 3,945 D-8;D-9;D-10 5 GLEN COVE Discovery&Mill High 3,500 1,750 4,615 D-2;D-4;D-5 6 SAFEWAY Sims&Hill Low 3,500 1,353 4,632 D-9;D-10 7 CONGREGATE CARE UNIT Rainer&16th High 3,500 456 7,946 D-8;D-9;D-10 8 COMMERCIAL AREA ALONG SIMS Sims&Hancock Low 3,000 1,385 3,448 D-9 9 COMMERCIAL AREA ALONG SIMS Sims&McPherson High 3,000 743 3,603 D-9 10 ELEMENTARY SCHOOL Walker&Blaine Low 3,000 1,696 3,679 D-8 11 MIDDLE SCHOOL San Juan&West U Low 2,750 1,657 3,401 D-1;D-3;D-8 12 FORTWORDEN Admiralty Avenue Low 2,750 2,400 3,787 D-31 D-8 13 FAIRGROUNDS 49th&Landes Low 2,750 3,049 5,337 D-3;D-8 14 UPTOWN Lawrence&Tyler Low 2,500 1,890 4,136 D-8 15 GRANT ST SCHOOL Grant&17th Low 2,500 592 3,612 D-8 16 FAR NORTHWEST#1 N Jacob Miller&Juan de High 1,000 140 1,161 D-1 Fuca 17 FAR NORTHWEST#2 Elmira&Lands End Lane High 1,000 228 1,600 D-1 18 NORTH CENTRAL Magnolia&51st Low 1,000 790 2,700 D-3 19 EXPANDED HIGH ZONE AREA Rosecrans and 36th Low 1,000 127 1,511 D-7 20 SOUTH GLEN COVE I N Otto&Seton I High 1 1,000 1 198 1 1,080 1 D-2;D-4;D-5 Notes: Fire flow analysis at this location performed with flow from two hydrants(one at 1,500 gpm and the other at 2,500 gpm)to meet the 4,000 gpm requirement. City of Port Townsend 29 September 2014 2014 Water System Plan Update 3.4.2 Description of Distribution System Improvements The distribution system piping improvements were developed to mitigate deficiencies identified in Section 3.4.1. These improvements would be implemented as part of the CIP General Fire Flow and Distribution System Improvements listed in Table 8-1. The project identification numbers provided below can be used to reference between Table 3-7 and Figure 3-6 in Appendix C. These projects would be implemented as funding allows. Note that the pipeline alignments shown in Figure 3-6 in Appendix C can be considered as approximate alignments - reflecting the pipeline size necessary as well as the general area to be served. Development and street improvements should be considered when scheduling and implementing these pipeline improvements because in most cases alternative routes for the pipeline improvements are possible. Northwest Improvements: D-1 The Northwest Improvements listed under improvement D-1 include a section of 12-inch pipe along Hastings to Cook Avenue Extension. The 12-inch pipe improvement continues north on Cook Avenue Extension to Elmira, and then along Elmira to Sutter Street, for a combined total of 5,680 feet. This improvement replaces an existing 6-inch line and improves fire flow in the northwest area. This substantially improves normal operating pressures during PHD, which is anticipated to drop to near, albeit still above, 30 psi based on the 20-year growth projection. Glen Cove: D-2 The Glen Cove improvement provides an additional source of supply to Glen Cove, which improves system redundancy and system circulation, and is necessary to alleviate the fire flow deficiencies in the south and west Glen Cove area. This improvement also helps to maximize system pressures that are projected to decline to near 30 psi under PHD conditions in the next 20 years. The Glen Cove improvement is comprised of 3,730 feet of 16-inch pipeline connecting to the existing 16-inch pipeline on the distribution system side of the old City Valve Shack just north of the southern City limit (at the south extension of Howard Street), extending southwest along the existing OGWS pipeline corridor to its intersection with 8t" Street, continuing south along 8t" Street to Glen Cove, and extending west along Glen Cove to north Otto Street. Northern High-Low Zone Connection: D-3 The Northern High-Low Zone Connection is an 8-inch diameter pipeline of approximately 1,710 feet with a PRV between the High and Low Zones at the northern edge of the City near Peary Avenue north of Cook Avenue. This connection enables flow from the High Zone to supplement fire flow from the Low Zone to existing and proposed development in this far northeast area of the Low Zone. Developers would be expected to cover the cost of improvements to the distribution system to substantially improve fire flows. Those improvements would include this D-3 project as well as all or a portion of the D-1 project. Western Extension, Section 1: D-4 The Western Extension improvement consists of 3,730 feet of 12-inch pipeline from the north end of the existing 12-inch diameter pipeline in Ivy Street (near the storage tank site) to South Jacob Miller Road and connects to the existing 8-inch line in South Jacob Miller Road. This improvement provides a redundant supply to the northwest portion of the City, improves fire flow to the northwest area, and if undertaken first, reduces the need for fire flow improvements along North Jacob Miller Road. City of Port Townsend 30 September 2014 2014 Water System Plan Update Western Extension, Section 2: D-5 The second section of the Western Extension continues the proposed D-4 improvement south along South Jacob Miller Road, approximately 6,000 linear feet, to the existing 8-inch pipeline near Lupine Street. This portion of the Western Extension provides an additional supply to the Glen Cove area, enhances fire flow to the Glen Cove area, and should be considered as development occurs along South Jacob Miller Road as well as in Glen Cove. High Zone Expansion: D-6 A 2,370 foot long, 12-inch diameter pipeline between 20th Street and Hastings Avenue is needed to connect the planned expanded area of the High Zone to the existing High Zone with adequate capacity to convey fire flows to this area. Additional pipeline improvements will be necessary within the expansion area to ensure adequate capacity throughout the expanded High Zone. Expanded High Zone: D-7 The improvements for the expanded High Zone provide looping in this area to meet minimum pressure requirements and also increase fire flow capacity within the expanded High Zone. The improvements include installation of a combined total of 10,170 linear feet of 8-inch pipelines along 35th and 36th streets, Corona Avenue, Sheridan Street, 29th Street, and Thomas Street. This area is currently served by 4-inch and 6-inch diameter pipelines. Low Zone Transmission/High School Fire Flow: D-8 The Low Zone Transmission/High School Fire Flow improvement is a combination of improvements needed to enhance fire flow capacity to the high school. Installation of this substantial additional hydraulic capacity will also improve fire flow capacity to the eastern end of the City. The Low Zone transmission portion is a new 3,610 foot long, 20-inch diameter pipeline connected to the existing 16-inch pipeline in Sheridan Street from the 5 MG storage reservoir. This portion of the improvement is strictly for transmission purposes and would not have any service connections. The other portions of this improvement include: a 16-inch pipeline along 25th and 24th Streets from Sheridan to San Juan Avenue, as well as 16-inch diameter pipelines along Willow Street and Cass Street from F Street to Blaine Street and along Blaine Street from Benton Street to Kearney Street. The total length of 16-inch diameter pipeline is 7,170 feet. Sims Commercial Fire Flow: D-9 The Sims Commercial Fire Flow improvement consists of two sections of 16-inch pipeline from the existing 16-inch pipeline in 91h Street southward to Sims Way. These two sections of 16- inch pipeline total 2,060 feet and improve fire flow within the High Zone to the commercial district along Sims Way. An alternative to this improvement would, in part, be to extend a 16- inch diameter pipeline along Sims Way between the existing 16-inch diameter pipeline to the west and the existing 6-inch pipeline in Hancock Street. Implementation of this improvement should be based on development as well as street improvements. In conjunction with Sims Way road improvements in 2009/2010, a section of 6" AC pipe between Howard and Cliff Streets on Sims Way was replaced with 8" DI; the 4" AC pipeline between Thomas and Logan Streets on 4th Street was replaced with 8" and 12" DI; and an 8"DI pipe was added along Logan St. between Sims Way and 4th St. City of Port Townsend 31 September 2014 2014 Water System Plan Update Safeway Fire Flow: D-10 To improve fire flow capacity to the Safeway area, several interconnections of existing pipelines, totaling approximately 1,000 feet, in the immediate area were developed. The 8-inch diameter interconnections are along Gise Street (from 9th Street to 10th Street), at the intersection of 10th Street and Jackman. Additional interconnects are recommended along 12th Street at Jackman and between Gise and Holcomb. General Fire Flow Additional fire flow-related distribution system improvements are shown in Figure 3-6 in Appendix C that address limited available fire flow across the City. The improvements are primarily interconnections that improve looping or replacement of older 4-inch pipelines with 8- inch pipelines. Each of these additional pipeline improvements are comprised of 8-inch diameter pipelines except the new pipeline in Hastings Avenue W. and North Jacob Miller Road, which would be a 12-inch diameter pipeline. The combined total of additional 8-inch diameter pipeline is 10,209 feet and the combined total of additional 12-inch diameter pipeline is 6,437 feet (along Hastings Avenue W. and North Jacob Miller Road). The City will undertake these improvements as expansion in growth and development warrants, or if major street improvements make consideration of these improvements compelling. Otherwise, these pipeline improvements are considered to be lower priority than improvements D-1 through D-10. 3.4.3 Annual Main Replacement Industry experience reveals that asbestos-cement (AC) pipe often deteriorates sooner than other materials such as ductile iron. The useful life expectancy of AC pipe is difficult to predict because it depends on the specific conditions of the installation, the corrosive nature of the trench soils and groundwater, and the corrosivity of the system water. Generally, AC pipe is considered to have a useful life expectancy of approximately 50 years. The City's distribution system is comprised of AC pipe ranging in size from 4 to 16 inches. The distribution of AC pipe within the City's system is presented in Figure 3-7 in Appendix C. The City's AC pipelines represent most of the oldest sections of the distribution system. Specific records on the age of most of the AC pipe are scarce or unavailable; however, the City believes that over half of its AC pipelines are 50 years old or older. The City does not have the financial resources to replace all of its aging AC pipelines now or even over a period of a few years, nor is it a prudent use of resources to undertake such a comprehensive replacement program. As long as these pipelines continue to provide useful service, their replacement is not necessary or recommended. However, the City recognizes that replacement of significant sections of these aging pipelines will be necessary in the next few years, because most of the AC pipelines are beyond their expected useful service life. City of Port Townsend 32 September 2014 2014 Water System Plan Update 4.0 Water Rights Analysis, System Reliability and Interties Like many other locations around Puget Sound and across the country, Port Townsend is trying to balance demands on a limited supply of water. Besides customer demands there is increased pressure to maintain instream flows for fisheries resources and wildlife habitat. The City recognizes its responsibility to protect, preserve, and enhance its water resources and to promote the efficient use of water through conservation. This section describes the City's water rights analysis, system reliability, and interties. 4.1 Water Rights Analysis The City has water rights for both the Big and Little Quilcene Rivers. In addition to its surface water rights to these sources, the City also has storage water rights for two raw water reservoirs; City Lake and Lords Lake. 4.1.1 Existing Water Rights This section describes the City's water rights for both its surface water sources and storage reservoirs. The City has applied for a 150 gpm irrigation ground water right for use by the Port Townsend Golf Course. This source could also serve an emergency supply for the City. Surface Water Rights The City has surface water rights on the Big Quilcene River and the Little Quilcene River. A summary of the existing and forecasted water rights from the surface water sources are provided in Table 4-1 and Table 4-3. While maximum instantaneous flow rates are generally based on the MDD of a system, in the City's case maximum instantaneous flow rates are based on the flow rates used to fill Lords Lake and/or City Lake during periods of low demand in the late fall and winter as discussed below. City of Port Townsend 33 September 2014 2014 Water System Plan Update Table 4-1. Existing Water Rights Status Permit Name of Right Priority Source Primary or Existing Water Rights Existing Consumption Current Water Right Status Certificate or holder or Date Name/ Supplemental (Excess/Deficiency) Claim# Claimant Number Maximum Maximum Maximum Maximum Maximum Maximum Instantaneous Annual Instantaneous Annual Instantaneous Annual Flow Rate Average 1 Flow Rate2 Average3 Flow Rate Average Permits/ Certificates 322 City of Port 2/9/1927 Big Quilcene Primary 30 cfs 21,700 ac-ftlyr 30 cfs 14,000 ac-ftlyr 0 cfs 7,700 ac-ftlyr Townsend (19.4 mgd) (19.4 mgd) 7028 City of Port 2/911927 Little Quilcene Primary 9.56 cfs 6,900 ac-ft/yr 9.56 cfs 3,100 ac-ft/yr 0 cfs 3,800 ac-ft/yr Townsend (6.2 mgd) (6.2 mgd) Claims None TOTAL """""" """""' """""' """""' 39.56 cfs 28,600 ac-ft/yr 39.56 cfs 17,100 ac-ftlyr 0 cfs 11,500 ac-ftlyr (25.6 mgd) (25.6 mgd) Intertie Name/Identifier Name of Purveyor Providing Water Existing Limits on Intertie Water Existing Consumption Through Current Intertie Supply Status Use Intertie (Excess/Deficiency) Maximum Maximum Maximum Maximum Maximum Maximum Instantaneous Annual Instantaneous Annual Instantaneous Annual Flow Rate Average Flow Rate Average Flow Rate Average None Pending Name on Date Submitted Primary or Pending Water Rights Water Right Permit Supplemental Maximum Instantaneous Flow Maximum Annual Volume Application Rate Requested Requested G2-30059 City of Port 611 3120 0 2 Well Supplemental 150 gpm 34 ac-ft/yr 150 gpm 34 ac-ft/yr Townsend Notes: (r)- Water rights for the Big and Little Quilcene Rivers are based on maximum instantaneous withdrawals and do not contain a maximum acre-feet condition. The maximum annual average acre-feet values below would be for the continuous use of the maximum instantaneous flow rate. (2)- Whereas for most systems this is typically the summertime MDD,Port Townsend uses the full maximum instantaneous water right when refilling Lords Lake storage reservoir during the wet winter months. MDD for the City and Mill during the summer is approximately 25.8 cfs. (3)_ Maximum Annual Average consumption is the maximum annual source diversions between 2009 and 2013. City of Port Townsend 34 September 2014 2014 Water System Plan Update H0� Certificate #322 authorizes a primary water right of 30 cfs of surface water (19.4 mgd) from the Big Quilcene River "to be used within corporate limits of the City of Port Townsend, Townships 30 and 31 North, Range 1 West, and nearby territory." Beginning in 1997 the City had voluntarily been maintaining a minimum 27 cfs downstream flow below the diversion. Since the renewal of the US Forest Service Special Use Permit in 2009 a minimum instream flow of 27 cfs has been mandated as a permit condition to protect the salmon and steelhead fisheries downstream of the diversion. The City and PTPC often reduce withdrawal of water from the Big Quilcene River between August and November and make up the difference with water previously stored in Lords Lake. Despite the complete suspension of diversions, natural stream flows will sometimes drop below 27 cfs. The Little Quilcene River water right (Certificate #7028) authorizes a withdrawal of up to 9.56 cfs but is conditioned with a requirement to maintain a minimum 6.0 cfs flow below the diversion, if naturally available. There is no specific seasonal restriction on the Little Quilcene water right; however Little Quilcene River diversions are often limited between July and October due to low stream flows. Both the City and PTPC are supplied from the Big and Little Quilcene Rivers through the Olympic Gravity Water System Pipeline (OGWS). PTPC leases all of the water supply that is not reserved by the City for its own purposes. The City has reserved 7.74 cfs (5 mgd) of the OGWS supply for meeting the needs of its retail and wholesale customers. The City's lease agreement with PTPC expires on March 15, 2020. Storage Rights The City has water rights for storage in two reservoirs, Lords Lake and City Lake. The rights are summarized in Table 4-2. The two Lords Lake reservoir storage permits were issued as part of the water right certificate for the Little Quilcene River. A separate certificate of water right was issued for City Lake storage. Table 4-2. Storage Reservoir Rights Reservoir Priority Storage Right Primary Secondary Reservoir Certificate acre- million Name Number Date feet gallons Source Source City Lake R-2024 2/20/1929 800 261 Big Quilcene Little Quilcene Lords Lake R-7028B 2/9/1927 750 244 Little Quilcene Big Quilcene Lords Lake R-7028C 2/9/1927 1,250 407 Little Quilcene Big Quilcene Reservoir Certificate R-2004 documents a total storage right of 800 acre-feet of surface water in the City Lake reservoir diverted from the Big Quilcene River pursuant to Certificate 322. The current storage capacity of City Lake is 144 MG (442 acre-feet). The Big Quilcene River is the primary supply for City Lake and the entire system, with Lords Lake as the backup supply. Reservoir Certificate 7028B authorizes a storage right of 750 acre-feet of surface water in Lords Lake diverted from the Little Quilcene River pursuant to Certificate 7028. Reservoir Certificate 7028C authorizes a storage right of 1,250 acre-feet of surface water in Lords Lake from Little Quilcene River diversions pursuant to Certificate 7028. Thus, the total storage right of water in Lords Lake is 2,000 acre-feet (652 MG). The current storage capacity of Lords Lake is 500 MG (1,535 acre-feet). City of Port Townsend 35 September 2014 2014 Water System Plan Update H0� The City typically draws down Lords Lake during the later summer and early fall months when maintenance of in-stream flow limit withdrawals from the Big Quilcene and Little Quilcene Rivers. Storm events and rapid snowmelt also necessitate periodic use of Lords Lake to minimize raw water turbidity. Lords Lake is filled from the Little Quilcene River when flows below the diversion are above the 6 cfs minimum in-stream flow requirement. Lords Lake can also be filled from the Big Quilcene River, as is often the case in the fall and winter, to speed refilling. Adding another inlet to Lords Lake from the transmission pipeline would provide additional flexibility in filling the reservoir from the Big Quilcene River. This would increase settling time for turbid water and allow filling of both Lords Lake and City Lake reservoirs at the same time. Moving or adding a second outlet would enable using water below the existing outlet without having to install temporary pumping equipment. Incorporation of these modifications should be considered if Lords Lake reservoir undergoes major renovation or substantial work is required on the pipeline in the vicinity of the reservoir. The City analyzed expanding Lords Lake to provide additional capacity to meet summertime water needs of the City and PTPC when low flows in the Big Quilcene and Little Quilcene Rivers limit diversions. An evaluation in 2001 by CDM examined increasing the size of Lords Lake by 50 and 100 percent. The analysis indicated that refilling an expanded reservoir would only be possible in 4 out of 5 years during a wetter than normal cycle while maintaining mandated instream flows. Preliminary cost estimates in 2001 were $2.3 to 3.0 million for a 50 percent storage expansion and $3.7 to 5.5 million to double the reservoir capacity. 4.1.2 Current and Projected Usage Current and projected municipal usage for the City was presented in Section 2.0 of this Plan. PTPC utilizes the majority of the City's water rights as noted previously. Over time Port Townsend Paper Corporation has upgraded its equipment and improved operating processes so that their paper production has substantially reduced water consumption. When drafting from Lords Lake is necessary to maintain instream flows on the Big Quilcene River, PTPC changes its operations to save approximately 3 to 4 mgd. It is expected that PTPC will continue to implement additional conservation measures that will further reduce their water requirements, allowing the City to meet its future growth needs. 4.1.3 Adequacy of Water Rights The comparison of existing water rights to projected demand is necessary to evaluate the long- term need for additional water rights. Water rights acquisition is typically a lengthy and controversial process. Thus, it is important to establish whether or not additional water rights will be needed to meet projected growth and when such rights would be needed. Supply facilities are typically designed with a capacity equal to the projected total MDD of the customers they serve. Diurnal variations in demand in excess of the MDD are typically met by distribution system reservoir storage. Thus, the projected MDD for the City and PTPC's projected supply needs are compared in Table 4-3 with the instantaneous water right of the Big Quilcene River (19.4 mgd). The water right for the Little Quilcene River is not factored into this comparison because of instream flow requirements limit its use during the late summer and early fall. City of Port Townsend 36 September 2014 2014 Water System Plan Update Table 4-3. Forecasted Water Rights Status Forecasted Water Use from Forecasted Water Right Status Existing Water Rights (Excess/Deficiency-20 Year Permit Name of Right Source Sources(20 Year Demand) g Priority Primary or Demand in Water Right) Certificate or holder or Date Name/ Supplemental Claim# Claimant Number pp Maximum Maximum Maximum Maximum Maximum Maximum Instantaneous Annual Instantaneous Annual Instantaneous Annual Im Flow Average' Flow Rate 2.3 Average 4 Flow Average Permits/Certificates 322 City of Port 21911927 Big Quilcene Primary 30 cfs 21,700 ac-ftlyr 30 cfs 13,900 ac-ftlyr 0 cfs 7,800 ac-ftlyr Townsend (19.4 mgd) (19.4 mgd) 7028 City of Port 21911927 Little Quilcene Primary 9.56 cfs 6,900 ac-ft/yr 9.56 cfs 3,100 ac-ft/yr 0 cfs 3,800 ac-ft/yr Townsend (6.2 mgd) (6.2 mgd) Claims None TOTAL ... .....••••• •••••••••• 39.56 cfs 28,600 ac-ft/yr 39.56 cfs 17,000 ac-ft/yr 0 cfs 11,600 ac-ft/yr (25.6 mgd) (25.6 mgd) Existing Limits on Intertie Water Existing Consumption Through Current Intertie Supply Status Use Intertie (Excess/Deficiency) Intertie Namelldentifier Name of Purveyor Providing Water Maximum Maximum Maximum Maximum Maximum Maximum Instantaneous Annual Instantaneous Annual Instantaneous Annual Flow Rate Average Flow Rate Average Flow Rate Average None Pending Pending Water Rights Permit Supplemental Water Right Name on Date Submitted Primary or Maximum Instantaneous Flow Maximum Annual Volume Application pp Rate Requested Requested G2-30059 I City of Port 6/13/20027 Well Supplemental 150 gpm T 34 ac-ft/yr 150 gpm 34 ac-ft/yr Townsend Notes: (r)- Water rights for the Big and Little Quilcene Rivers are based on maximum instantaneous withdrawals and do not contain a maximum acre-feet condition. The maximum annual average acre-feet values below would be for the continuous use of the maximum instantaneous flow rate. (2)- Whereas for most systems this is typically the summertime MDD,Port Townsend uses the full maximum instantaneous water right when refilling Lords Lake storage reservoir during the wet winter months. (3) The forecasted water use for PTPC and the City is compared against the water right for the Big Quilcene River(19.4 mgd).Due to instream flow requirements,supply is limited from the Little Quilcene River. For forecasting purposed,it is assumed that the PTPC will operate at a maximum 14.5 mgd.The 2033 projected MDD of the City is 2.4 mgd.Therefore,the total projected demand is 16.9 mgd(26.2 cfs)which is less than the water right from the Big Quilcene River. (4)- For forecasting purposes it is assumed that the PTPC will operate at an average 12 mgd. Forecast assumes total annual consumption split of 82%Big Quilcene River and 18%Little Quilcene River. City of Port Townsend 37 September 2014 2014 Water System Plan Update H]� While the City has adequate water rights to meet current and projected water uses, it is seeking an additional ground water right of 150 gpm for irrigation of the City owned golf course, which would reduce flows diverted from the Quilcene Rivers during periods of low stream flow and provide an emergency water source located within the City. It is important to recognize that the City's water rights are fully utilized. As the City reduces its diversions during summer months to maintain instream flows, water stored in Lords Lake is used to compensate for the difference between City demands and withdrawal from the rivers. Reservoirs are refilled in the wet fall and winter months, during which time the full water rights for both the Big Quilcene and Little Quilcene are utilized. The City has identified the following alternatives to meet its long-term supply needs if City needs grow faster than projected: • Increase conservation efforts • Continue to work with PTPC to develop ways to reduce consumption at the mill Although adequate water rights are in place to meet the combined needs of the PTPC and the City, the City is limited to 5 mgd per its lease agreement with the PTPC. Out of that 5 mgd is a commitment of 0.28 mgd for LUD No. 3. By 2016 LUD No. 3 is expected to be connected to the Jefferson PUD Quimper ground water system. As a result, the City will have at least 5 mgd for its use until the next lease renegotiation with the PTPC. Comparing that to the projected 2033 MDD of 2.39 mgd, as presented in Table 2-8, there appears to be adequate supply per the City's water rights and lease agreement with the PTPC for expected growth in demand. City of Port Townsend 38 September 2014 2014 Water System Plan Update 01 5.0 Cooperative Watershed Protection Program This section has not been revised for the 2014 WSP. 6.0 Operations and Maintenance Program This section has not been revised for the 2014 WSP. 7.0 Distribution Facilities Design and Construction Standards This section has not been revised for the 2014 WSP. City of Port Townsend 39 September 2014 2014 Water System Plan Update 8.0 Improvements Program System improvements scheduled for the next three years are summarized in accordance with their relative priority and availability of funds. The project costs presented in Table 8-1 are "order-of-magnitude" estimates based on 2014 dollars. Order-of-magnitude is defined as an estimate based on typical industry experience for similar work but made without detailed design- level data. Accuracy can be expected to vary from 30 percent under to 50 percent over the estimated costs. Because all costs are provided in 2014 dollars, future costs must be adjusted to account for the effects of inflation and changing construction market conditions at the time of construction. In general, costs for land or right-of-way acquisition are not included in project costs unless specifically noted. The order-of-magnitude costs prepared for system improvements are for guidance in utility budgeting, project evaluation, funding, and implementation. The final costs of the improvements will depend on actual labor and materials costs, site conditions, productivity, competitive market conditions, final project scope and schedule, and other variable factors. As a result, the final project costs will vary from the estimates provided herein. The estimated costs presented in this section are considered to be total project costs, which include design, construction, project contingency, legal, and administrative expenses. Estimated project costs developed for pipeline improvements were based on unit costs per lineal foot of pipeline. A single set of cost per lineal foot criteria was used for each of the pipeline improvement. Site-specific cost estimates were not developed because of the uncertainty of the actual location of the pipeline improvement. Piping improvements in busy streets will cost more than piping improvements in the shoulders of less-traveled, more rural roadways. Some capacity improvements developed by the hydraulic modeling effort can be implemented along more than one alignment. The estimated costs for pipeline improvements as well as other improvements are useful for long-term budgeting purposes and for comparing alternatives. Preliminary study and/or design should be undertaken for each project in advance of annual budgeting to refine estimated project costs. Each major improvement project is designated with an improvement project number to facilitate referencing between the text and tables in this section. City of Port Townsend 40 September 2014 2014 Water System Plan Update Table 8-1. Improvements Program (cost estimates presented in 2014 dollars) No. Description 4-Year CIP Total Project 2014 2015 2016 2017 Cost Distribution S stem D General Fire Flow and Distribution System Improvements $150,000 $150,000 $150,000 $150,000 $600,000 Storage S-1 5-MG Reservoir Replacement&Finished Water Booster Pumping Station 786,600 7,661,940 -- -- $8,448,540 S-2 Standpipe Painting -- -- $200,000 $200,000 5U—Ml SU-1 Big Quilcene Diversion Repairs $400,000 -- $400,000 SU-2 Andrews Creek Pipeline Crossing Repair -- $55,000 $55,000 Treatment T-1 Membrane Filtration Pilot Testing $450,300 $450,300 T-2 Water Treatment Plant $2,179,680 $6,787,560 $6,778,440 $15,745,680 General Water System Plan $10,000 $25,000 $25,000 $60,000 Annual Totals $3,576,580 $15,054,500 $7,153,440 $175,000 $25,959,520 City of Port Townsend 41 September 2014 2014 Water System Plan Update 9.0 Financial Analysis This section discusses the recent financial performance of the City's water utility and presents a future projection of its revenues and expenses. Also presented herein is the ability of the City to pay for proposed capital improvements in the next few years along with a discussion of potential funding sources. The utility's current rate structure is also presented in this section. 9.1 Historic Financial Performance The City operates the water utility as a joint fund with the sewer and water resources utilities. While expenses are reported separately for each department within the utility (i.e. Water Distribution, Water Quality), revenues are reported jointly. In order to estimate the portion of the sources of funds available to the water utility, the following assumptions were made: • Shared Revenues: Revenues that were not identified as "water" or "sewer" were allocated based on the proportion of water sales to total sales revenue: (Water Sales)/(Water Sales Revenue + Sewer Sales Revenue) = 42%. • 100 percent of expenses for the Water Distribution and Water Quality departments were allocated to the water utility. • Utility Billing Department expenses were allocated based on number of active accounts. Per the City's Finance Department, there are 4,457 water accounts and 3,816 sewer accounts. Therefore, 54 percent of Utility Billing department costs were allocated to the water utility. Table 9-1 presents a financial summary of the system's utility fund operating revenues and expenditures from 2008 through 2013. The system's operating budget for 2014 is also presented. Utility fund expenses (which include operations and maintenance, taxes, debt service, and transfers/subsidies) have ranged from a low of$1.9 million in 2008 to a high of$2.4 million in 2011. While the water utility began 2014 with a beginning balance of$2,521,339, the utility operated between 2009 and 2013 with a deficit totaling $1,516,772. City of Port Townsend 42 September 2014 2014 Water System Plan Update 01 Table 9-1. Historic Financial Performance for Water Utility Fund (411) Actual Actual Actual Actual Actual Actual 2008 2009 2010 2011 2012 2013 Beginning Balance $498,154 Revenues Water Sales $1,709,169 $1,752,615 $1,665,978 $1,679,294 $1,632,597 $1,832,544 Water Taps $36,994 $30,660 $24,129 $10,719 $21,110 $16,615 Other Utility $22,129 $42,933 $12,171 $18,765 $6,546 $1,877 Fees/Chrgs Investment Interest $56,211 $21,446 $8,511 $1,183 $473 $582 Miscellaneous $22,940 $26,408 $27,115 $35,433 $45,047 $107,020 Revenue Ops Trfr-PT Maint St $50,000 $12,500 Debt Proceeds $71,055 $5,627 Sale of Fixed Assets $638,221 $1000 $1575 Subtotal Revenues $2,485,664 $1,874,062 $1,737,904 $1,745,394 $1,827,828 $1,978,340 Expenses Utility Billing $208,725 $238,442 $246,018 $240,060 $268,254 $228,811 Water Distribution $1,207,132 $1,433,578 $1,355,012 $1,642,309 $1,180,420 $1,322,290 Water Quality $364,939 $398,308 $431,301 $384,769 $322,999 $325,469 Water Resources $97,403 $121,074 $115,821 $116,389 $151,671 $141,459 Subtotal Expenses $1,878,199 $2,191,402 $2,148,152 $2,383,527 $1,923,344 $2,018,029 Net Revenue $607,465 ($317,340) ($410,248) ($638,133) ($95,516) ($39,689) Ending Fund Balance $458,465 Note: Miscellaneous Revenues consist of the following:Emergency Reserves,Staff Time Chrgs,Budgeting,Actg,and cons,Prior Year Correction,Long term rent/leases,Mis Revenue Water/Sewer,W/S Pay-Back collections,Insurance Proceeds and Grant Funds. The City is using the Water CIP Fund (415-925) to track capital expenditures for the water utility separately from the Sewer capital funds. The performance of this fund is presented in Table 9-2. City of Port Townsend 43 September 2014 2014 Water System Plan Update 01 Table 9-2. Historic Financial Performance for Water CIP Fund (411-925) 2008 2009 2010 2011 2012 2013 Sources of Funds Interest on Investments $72 Transfer from Water Fund $21,551 $325,522 $100,206 SDC Transfer In $87,693 $102,117 $42,718 $8,156 $13,093 Water Project $291,464 $264,626 $964,842 $4,039,200 Capital Surcharge $88,194 Total Sources of Funds $87,765 $123,668 $334,182 $598,304 $1,078,141 $4,127,394 Uses of Funds General Fund OH Charges $8,769 $11,242 $3,893 $60,843 $68,758 $344,933 Other Improvements Water $87,693 $112,425 $330,390 $567,926 $863,631 $3,538,774 Engineering Services $205,373 $161,608 Total Uses of Funds $96,462 $123,667 $334,283 $628,769 $1,137,762 $4,045,315 Balance(2) ($8,697) $1 ($101) ($30,465) ($59,621) $82,079 Notes: 1. The Capital Surcharge was removed from the CIP Fund in 2014. 2. The City cannot request PWFT/DWSRF reimbursement until expenses are paid.Negative balances are a result of a lag time between requesting reimbursement and receiving the funds. The City is currently repaying debt service on one bond and five loans and, as of the end of 2013, has two additional water facility loans not yet drawn upon. Reserve and redemption funds have been established for the bond and loan repayments. The annual PWTF debt service appears as an expense in the Water Quality and Water Distribution departments as noted in Table 9-6. The City will continue to act to generate sufficient revenue to retire existing debt, to finance planned improvements and system operation expenses, and to ensure reserves for unexpected expenses. City of Port Townsend 44 September 2014 2014 Water System Plan Update Table 9-3. Bonds and Loans Loan Interest Term Maturity/ Beginning Ending Description Amount Rate (Years) Payment Balance Additions Reductions Balance Due Date 01/01/2013 12/31/2013 1978 Water Revenue Bond $856,803 5% 40 3/1/2018 $115,000 $15,000 $100,000 1998 PWTF Loan Water(CT pipeline,water storage and $2,376,378 1% 20 7/1/2018 $268,308 $44,718 $223,590 well upgrades) 2002 PWTF Loan Water $1,308,150 0.50% 20 7/1/2022 $667,019 $66,702 $600,317 (Morgan Hill Booster Station) 2012 PWTF Loan PC12-951- $1,896,000 0.50% 20 6/1/2031 $268,938 $349,606 $14,155 $604,389 075(Water Treatment Plant) 2012 PWTF Loan PC12-951- $1,000,000 0.50% 20 6/1/2032 $198,568 $801,432 $52,632 $947,368 060(City Lake) 2012 PWTF PC-13-961-037 $2,104,000 0.50% 20 6/1/2032 (Reservoir replacement) 2012 DWSRF DM12-952-092 $3,041,110 1.50% 24 10/1/2036 $0 $231,270 $231,270 (Water Treatment Plant) 2013 PWTF PC13-961-018 $5,000,000 0.50% 20 6/1/2032 Water Total $1,517,833 $2,706,934 9.2 Water Rates The City's water rate structure is based on a "cost of service" approach to provide the required revenue to operate and maintain the utility. The City conducted a rate study in 2013 and determined that the operating revenues of the water utility were not fully covering operations & maintenance expenses and that rate increases were needed to address the existing operating deficit and keep up with costs in subsequent years. In addition, the City Council adopted, a "capital surcharge" to fund construction of the new water treatment facility. Rate payers also pay a 20 percent utility tax on water service however the tax does not apply to the capital surcharge. The City charges a system development fee of$2,522 for each new connection to the water system. The fees are collected to help the City to pay for new system growth. The rate structure presented in Table 9-4 is effective as of January 2014. The water system's rate structure is composed of a monthly base rate charge based on meter size plus a usage charge. Customers outside the city limits pay higher base and volume rates than those in the city. Base rate and volume charges are the same for residential and commercial users. Table 9-5 below shows the Council approved rate increases through 2018. An increase to the base rate and user fee was implemented in 2013 and escalates through 2018 to cover O&M expenses, which have exceeded revenue since 2009. The approved capital surcharge rates in Table 9-5 may have to be adjusted depending on the availability of grants and low interest loans to fund the construction of the water treatment facility and the 5-million gallon reservoir and booster pump station. City of Port Townsend 45 September 2014 2014 Water System Plan Update 01 Table 9-4. 2014 Water Rates (per month) BASE RATE - (Residential and Commercial) USAGE FEE -Charge is per 1,000 gallons Meter Size Inside City Outside City Type of Account Inside City Outside City 5/8"to 3/4"(Low Income) $9.48 $11.38 Low Income Residential $2.51 $3.01 5/8"to 3/4" $17.76 $21.31 Residential(including duplexes) $2.51 $3.01 1" $44.42 $53.30 Multi-Family(3 or more units) $1.95 $2.34 1 '/2" $88.83 $106.59 Commercial A Meter<2" $2.89 $3.47 2" $142.14 $170.56 Commercial B Meter>:3" $4.35 $5.22 3" $266.50 $319.80 Government $3.77 $4.52 4" $444.15 $532.99 Irrigation-Winter(Nov-April) $3.01 $3.61 6" $888.32 $1,065.99 Irrigation-Summer(May-Oct) $5.28 $6.33 8" $1,421.31 $1,705.57 TAXES AND SURCHARGES Capital Surcharges: Water(Inside City) $12.00 Monthly fee,adjusted annually(Low Income Discount is at a reduced rate). Water(Outside City) $14.40 Monthly fee,adjusted annually(Low Income Discount is at a reduced rate). City Utility Tax 20% Assessed monthly on utility service rates only. Table 9-5. Adopted Annual Rate Increases Aug 2013 Jan 2014 Jan 2015 Jan 2016 Jan 2017 Jan 2018 0&M Rate 15.00% 6.00% 3.00% 3.00% 2.00% 2.00% Capital Surcharge 140.00% 50.00% 0.00% 0.00% 33.33% 9.3 Additional Sources of Funds If the City needs additional sources of funds, other than existing rates and connection charges, to meet future expenses for improvement projects, it has several options to raise additional funds, including the following: • Increase Water Rates. The City will conduct another rate analysis that will take into account future loans, grants and/or bonds necessary to pay for the water treatment plant and 5-million gallon reservoir replacement. City of Port Townsend 46 September 2014 2014 Water System Plan Update H0� • State or Federal Loans or Grants. Loan funding is available through the PWTF loan program. Loan rates can be as low 0.5 percent if a certain percentage of local matching funds is provided. The Drinking Water State Revolving Fund (DWSRF) program has an attractive loan program design specifically for municipal water systems. Rates are as low as one percent for qualifying municipalities. Grant funding may be possible, if the City meets the requirements, through the Community Development Block Grant program, which is a federal program administered through the Washington State Department of Commerce. • Local Improvement Districts (LIDs). The formation of an LID is a tool that can be used to effect improvements that are either system-wide in nature or relative only to a specific group of customers. • Issue Revenue Bonds. Another more-costly option for the City would be to issue revenue bonds. Revenue bonds are secured by the revenues of the water system. Typically, bonds have a 20-30 year term but a higher interest rate than State or Federal loans. 9.4 Fiscal Impacts of Improvement Program This section presents a financial analysis of the City's water utility. A six-year financial plan was developed to analyze the impact on water rates of implementing the Improvement Program presented in Section 8.0. The building blocks of the financial plan are the projections of costs or revenue requirements (both operations and maintenance, and capital) that the City will incur and the revenues, which the City expects to generate during the same period. The financial plan is based on a set of overall assumptions related to customer growth, inflation, and other factors, as well as scheduling of the Improvement Program. The following assumptions were used in developing the water rate model: • Customer growth will occur at an average rate of 0.25 percent annually through 2016 and 0.5 percent thereafter. This estimate is more conservative than the population growth rate of 1.01 percent used for the demand forecast as it does not necessarily transfer to increased revenue for the utilities. Customers may conserve more or businesses may use less water. • Operation and maintenance costs will escalate at annual rates of 2.1% to 7%, based on projected inflation and system growth, and historical trends. Specific escalation factors used are: — General inflation: 2.1 percent for 2014, 2.2 percent for 2015, and 3 percent thereafter. — Salaries and wages: 3.5 percent — Personnel benefits: 7 percent • Additional costs for filtration water treatment plant O&M expenses are expected to begin in October 2016 an increase yearly with a 3% inflation factor. Labor for plant operations is assumed to occur with existing staffing levels. • Utility Billing expenses were allocated based on the number of water utility's share of total customer accounts (total accounts for water and sewer). Currently 54 percent of utility billing expenses are allocated to the water utility (4,703 water accounts, 4,119 sewer accounts). City of Port Townsend 47 September 2014 2014 Water System Plan Update H]� • The OGWS Transmission Pipeline Trust Fund is a designated fund for the maintenance/repair of the main Olympic Gravity Water System transmission line. It was assumed these funds were not available to fund the Improvement Program. This analysis assumed the water utility would make an annual transfer of$50,000 and interfund loan repayments to this fund. The fund balance was $1,740,770 at the start of 2014. The financial plan for the water utility, in the form of projected sources and uses of funds for the water operating funds, is presented in Table 9-6. In order to meet revenue requirements and to continue to meet debt service coverage, the City will be required to raise capital surcharge rates as indicated in Table 9-5. Table 9-6 presents the projected operating results for the water utility for 2014 to 2020. Estimates of total annual rate revenue are based on the rate increase forecasts and projected revenue under adopted rates. These rate increases have been established to allow the City to generate adequate fund balances and meet potential debt service coverage requirements. Debt service coverage is the amount of revenue that a utility must generate annually in excess of its operation, maintenance, and debt service requirements. This additional revenue is required by bond buyers as a condition of issuing revenue bonds; it provides the bond buyers a measure of security regarding debt repayment by the utility. Failure to generate the required revenues puts the utility in default on the bonds, which adversely affects current and future bond ratings and interest costs. Debt service coverage requirements generally require net revenues (system income and revenue less operation and maintenance expenses) be at least 1.25 times the average annual principal and interest requirements of all outstanding bonds. Table 9-6 shows the projected debt service coverage based on the projected operating revenues and O&M expenses over the study period. Except for 2017, debt service coverage meets the assumed minimum coverage target. City of Port Townsend 48 September 2014 2014 Water System Plan Update 01 Table 9-6. Projected Revenues and Expenses 2014 2015 2016 2017 2018 2019 2020 Operating Revenues Rate Revenue: $1,987,420 $2,050,024 $2,114,603 $2,167,680 $2,222,089 $2,277,863 $2,335,038 Other Revenue: $74,308 $74,379 $74,450 $74,690 $74,930 $75,172 $75,416 Total $2,061,728 $2,124,403 $2,189,053 $2,242,370 $2,297,019 $2,353,035 $2,410,454 Operating Expenses Utility Billing $254,357 $264,353 $275,429 $287,031 $299,192 $311,942 $325,316 Water Distribution Operations $1,047,218 $1,078,607 $1,115,296 $1,153,577 $1,193,493 $1,235,123 $1,278,553 Water Quality Operations $296,526 $304,185 $339,956 $430,936 $444,840 $459,220 $474,095 Water Resources Operations $140,235 $146,653 $153,401 $160,498 $167,965 $175,822 $184,093 State Excise Taxes $148,520 $148,811 $154,746 $159,207 $160,003 $160,803 $161,606 Total $1,886,856 $1,942,609 $2,038,828 $2,191,249 $2,265,492 $2,342,910 $2,423,664 0&M Coverage Surplus $174,872 $181,793 $150,225 $51,120 $31,528 $10,125 (Deficit) ($13,210) Expense for Debt Service Debt Service Requiring $236,165 $372,582 $744,802 $1,028,325 $928,538 $901,686 $897,835 Coverage Revenue for Debt Service Capital Surcharge Revenue $665,872 $1,001,295 $1,003,798 $1,008,817 $1,351,830 $1,358,589 $1,365,382 Debt Coverage Surplus $429,708 $628,713 $258,996 (Deficit) ($19,508) $423,291 $456,902 $467,547 9.5 Tiered Service Policy 2.4 of the City's GMA Comprehensive Plan defines the goal of identifying and establishing urban capital development and utility growth tiers which are consistent with and support the growth and development patterns of the City's land use planning objectives. Three tiers were identified. The purpose of the capital facilities growth tiering is to encourage growth in, and adjacent to, areas currently provided with a full range of public facilities and utilities. The tiering policies are implemented through Port Townsend Municipal Code Sections 13.14.010(E) and 13.14.060, which define City funding and participation for private utility development projects. For development projects in Tier 1, the City will pay for any required oversizing of lines for future growth and will pay a proportionate share of costs when improvements benefit existing customers. For development projects in Tier 2, the City will participate in these programs only to the extent that funds are available in the current year's Capital Improvement Program. For development in Tier 3, the developer must pay the full cost of all improvements, including oversizing or for existing customers. No City funding for development in Tier 3 is available. Tier 1 covers the areas that are currently provided with a full range of public facilities and utilities. Tier 2 covers areas with limited public infrastructure which are designated for commercial, manufacturing, or higher-density residential development. All other areas are designated as Tier 3. City of Port Townsend 49 September 2014 2014 Water System Plan Update F)l This Page Intentionally Left Blank City of Port Townsend 50 September 2014 2014 Water System Plan Update Appendix A Summary of Largest Users This Page Intentionally Left Blank Table Summary of Largest Water Users(2013 Billing Records) AVG AVG MAX POTENTAL RANK ACCOUNTNAME JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL ANNUAL L MONTH MONTH FOR GALID AY (GALIMON) (GALIMON) REUSE 1 PORTTOWNSEND GOLF COURSE 0 0 0 0 283,000 1,058,000 1,785,000 2,986,000 2,307,000 565,000 273,000 0 9,257,000 25,362 771,417 2,986,000 Yes 2 FORTWORDEN 337,000 452,000 724,000 622,000 546,000 687,000 865,000 1,408,000 1,057,000 754,000 899,000 557,000 8,908,000 24,405 742,333 1,408,000 Yes 3 JEFFERSON HEALTHCARE 155,000 168,000 137,000 166,000 200,000 193,000 200,000 229,000 269,000 154,000 228,000 187,000 2,286,000 6,263 190,500 269,000 No 4 LIFE CARE CENTER 161,000 126,000 120,000 149,000 235,000 267,000 269,000 333,000 268,000 105,000 123,000 115,000 2,271,000 6,222 189,250 333,000 No 5 SEAPORTLANDING 173,000 189,000 160,000 180,000 194,000 179,000 192,000 147,000 181,000 115,000 183,000 156,000 2,049,000 5,614 170,750 194,000 No 6 PORT OF PORT TOWNSEND 96,000 84,000 82,000 106,000 158,000 149,000 254,000 304,000 336,000 164,000 172,000 108,000 2,013,000 5,515 167,750 336,000 No 7 PUD 131,500 121,100 83,100 121,400 147,300 132,600 221,200 323,600 302,300 85,700 120,300 95,700 1,885,800 5,167 157,150 323,600 No 8 SAFEWAY 169,000 233,000 185,000 197,000 171,000 138,000 166,000 138,000 133,000 82,000 129,000 99,000 1,840,000 5,041 153,333 233,000 No 9 HARBORSIDE INN 90,000 77,000 62,000 117,000 94,000 169,000 216,000 252,000 269,000 150,000 169,000 106,000 1,771,000 4,852 147,583 269,000 No 10 DISCOVERY VIEW APTS 140,000 154,000 119,000 143,000 156,000 140,000 140,000 126,000 155,000 99,000 154,000 129,000 1,655,000 4,534 137,917 156,000 No 11 PT SCHOOL DISTRICT-FIR ST IRRIGATION 0 0 0 0 1,000 88,000 315,000 711,000 505,000 0 0 0 1,620,000 4,438 135,000 711,000 No 12 PORT REST ROOMS 69,000 159,000 54,000 99,000 122,000 131,000 134,000 154,000 188,000 82,000 118,000 83,000 1,393,000 3,816 116,083 188,000 No 13 PT MOTOR INN 113,000 58,000 54,000 64,000 118,000 130,000 141,000 200,000 242,000 148,000 58,000 40,000 1,366,000 3,742 113,833 242,000 No 14 ADMIRALTY APTS 128,000 113,000 75,000 99,000 112,000 97,000 96,000 115,000 83,000 124,000 128,000 100,000 1,270,000 3,479 105,833 128,000 No 15 PACIFIC PLACE PROP 109,000 106,000 92,000 103,000 115,000 98,000 120,000 111,000 123,000 80,000 133,000 79,000 1,269,000 3,477 105,750 133,000 No 16 WA STATE FERRY 86,000 68,000 57,000 77,000 81,000 102,000 134,000 164,000 115,000 139,000 91,000 77,000 1,191,000 3,263 99,250 164,000 No 17 BISHOP HOTEL 65,000 88,000 84,000 120,000 109,000 110,000 117,000 126,000 136,000 99,000 83,000 23,000 1,160,000 3,178 96,667 136,000 No 18 MARINE PLAZA 106,000 85,000 85,000 95,000 104,000 96,000 104,000 94,000 102,000 82,000 96,000 79,000 1,128,000 3,090 94,000 106,000 No 19 PT LAUNDROMAT 78,000 81,000 66,000 76,000 90,000 93,000 93,000 196,000 115,000 67,000 90,000 60,000 1,105,000 3,027 92,083 196,000 No 20 SAN JUAN COMMONS 83,000 82,000 78,000 94,000 86,000 93,000 97,000 93,000 109,000 89,000 99,000 89,000 1,092,000 2,992 91,000 109,000 No 21 JEFFERSON COUNTY-MEMORIAL FIELD 0 0 0 50,000 0 53,000 538,000 257,000 124,000 3,000 0 3,000 1,028,000 2,816 85,667 538,000 No 22 MANRESA CASTLE 51,000 41,000 60,000 56,000 85,000 88,000 118,000 144,000 142,000 86,000 79,000 59,000 1,009,000 2,764 84,083 144,000 No 23 SKOOKUM 85,000 76,000 53,000 74,000 78,000 69,000 72,000 73,000 88,000 85,000 140,000 77,000 970,000 2,658 80,833 140,000 No 24 ADADDIN MOTOR INN 62,000 65,000 54,000 80,000 79,000 89,000 94,000 89,000 123,000 60,000 77,000 76,000 948,000 2,597 79,000 123,000 No 25 HANCOCK ST APTS 78,000 70,000 60,000 70,000 81,000 66,000 92,000 79,000 105,000 53,000 89,000 77,000 920,000 2,521 76,667 105,000 No This Page Intentionally Left Blank Appendix 6 Water Use This Page Intentionally Left Blank APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS J-4 1,x61. Mar{14 Apr48 May{14 Jan{14 Jal{l4 Aag48 1,114 (bt{14 NoWB Dm,{8 'I'OraF2(X8 IN-CITY Singlc family RCVidcntisl Gnsamp[icn(gallons) 12,699,1(1(1 11,38851 14,(82,6(X) 19,194,41X1 17618,71X1 26,138,9(X) 28 264,2(X1 24,618,31 14,466,6(X) 14,15,111X1 12,888,7(X1 13,823,5(.1 21,248,111 Co-ions 3,- 3,388 3165 3,471 3,471 3,474 3,4.) 3,491 3,498 3,101 351 3,514 3,11 Avrsagc(gpd) 4(19,648 392,7(11 452,9X1 639,813 568,345 8]1,291 911,748 795,752 482,22(1 454,691 4282911 445,919 MakiI.ulyR i-ial Coasomptioa(gal-) 1139,1X111 1,455,31X1 1,877,81 2,(54,41.1 !8411,4(.1 2,372,71X1 2,385,21X1 2,354,9(X1 1,115,71.1 2,1154,(X) 2,1159,8(X1 2,12,81 24,112,(X.1 ConncRians S5 97 1(12 1112 1112 1112 1118 116 118 118 118 118 I(I% Avcmgc(gpd) 56.1- 50,183 60,574 68,813 59,368 79,1191) 76,942 75,965 61523 66,258 68,66) 66,542 Commrsaial Consamp[i0n(gallons) 4,399,1.X1 3,9!175(X1 4.338,7(X) 4.9311,6(X1 6,(1(5,31X1 6,5111,4(X1 5,876,7(X! 6,933,21X1 5,181,4(X! 4,728,8(X1 3,982,4(X1 4,240 Ml 1,886-1 ConncRions 31X1 31X1 3111 3(11 3(2 3(2 3(2 3(2 3(2 3(2 3(12 3(12 3(YL Avrsagc(gpd) 141,9113 134,741 139,958 164,353 193,752 216,713 181,571 223,652 168,047 152,542 132,747 136,797 ('rcrvcrnnxnt Cca .f ioa(galloas) 1.498,4(1(1 1.483,8(X) 1,517,7(X1 1,882,4(X) 218(1.6(X1 2,395,8(X) 2,461,7(X1 2,297,9(X) 1.785,7(X1 1,646,4(X! 1,381,31X1 1,281,4(X) 21,673,1(1(1 --ions 78 78 58 58 57 57 57 57 57 57 57 57 61 -Wc (gpd) 48.335 51,166 48,958 62,747 0,826 79,861 79,410 74,126 59523 53,1111 46,(143 41,335 Irrigffiion Cca .f ion(gallons) 2395()(1 88,91X1 22"91X1 2,186,(!(8! 3,194,31X1 4,958,1(X1 5,199,6(X! 3,647,8(X1 954,31X1 619,7(.1 145,81X1 134,7(X) 215911,61(1 Cana-.. 19 21 28 56 57 49 6i 61 47 1 23 ZI 40 -Mc (gpd) 7,726 31166 7,158 72,867 1(13,(142 165,270 Ifi7,729 117,671 31,810 19,99!1 4,86) 4,345 WMlcsak:(I T WOa3ca) Coreamp-(gal(oaa) 642,1.X1 639,(11X1 7!9111X1 91)lNl 85131181 I,467)lNl 1.7117)(8( I.793)lNl I.I43)lNl I,281)lNl 9119,(1(.1 834,(1(X1 12,894,111 Coaac-, I 1 I I 1 1 1 1 1 1 1 I I -Wc (gpd) 20,7111 22,(134 23,194 311,3(X) 27,452 48,91X1 55,1165 57,839 38,1(X1 41,323 3(1,31 26,9(13 'IbW 1-ily WaNr USC 21,217,111X1 18,963,()(X) 22,717,71 31,166,.) 31551,3(X) 43,833,91X1 45,894,4(X) 41,695,1(X) 25,236,71 24,424,91X1 21,32731(X) 22,377.1(X1 36"4114,SX111 TI 1a-CityWfficr CO-i0re 3,879 3,885 3,955 31. 3.9911 3.985 4.014 4.028 4.023 4.017 4,(11(1 4,013 3,982 A4rWa Daily 1-ity-Use 663.710 631,862 732,829 1()8,893 "(117,718 1,461,1311 1,481,465 1,345,(X13 1Yl 1,223 787.91 71(1,9(X1 721,842 WNSI ON CI1'YCLEN COVE Singlc family R idcaasl Coasampti0a(gallons) 755,6) 925,3() 9!19,11.1 1,42(1,8(X1 1121.91 2,144,6(X1 1,938,6(X1 2,054,71 878,31 889,6(X1 811,3(X1 8865(X1 14624,3(X1 Coaac-, 238 239 2411 237 239 239 2411 241 242 242 242 243 24(1 Avrsagc(gpd) 24,374 25,0111 29,326 47,36) 39,(89 71,487 62,535 66,281 29,277 28,697 27,043 28591 Mold beauty R idcatial Ccasomp-(galloas) 20,10(1 18211 22}t1 3(1,71 28,81 37,21 42211 34,1(X1 22211 23,31 23,61) 22.61 325,200 --ions 2 2 2 2 2 2 2 2 2 2 2 2 2 -W,(gpd) 648 621 735 1)24 929 12.1 1.355 "I(XI 733 752 7X1 729 Com-iA Coasamptioa(gAlcas) Ift11,2(Ill 158,4(X) 174,61.1 221,8(X1 1.(.1 3(X1,8(.1 2211,(!(8! 282,61.1 185,(!(8! 179,7(X1 178,71 2117,61) 2,486,()(1 --i... 43 43 44 45 45 45 45 45 45 45 45 45 45 -Mc (gpd) 5.813 5,462 5,632 7,393 6,342 10,027 7,1197 9,116 6,167 5,791 5,957 6,691 Gmc Coaaamp-(galloaa) c.-ions A We (,d) - - - - - - - - - - - - Irn'.ioa Coa-f ion(gpllons) 9(1(1 1,21X1 2,01X1 3,71 3,11() 2745() 111,3() 6,4(X) 1111() 51111X1 2,(11 2211 312,1)(1 -.-ions 2 2 2 2 2 13 2 2 1 2 1 1 3 A4rWa (gpd) 29 41 65 123 y7 9,15(1 332 215 1 33 161 67 65 TR (M Of lb.Wa u. 956,.1(1 9!02,91X1 "1(185(X) 1.677,111X1 1,438,3() 2,757,1(X1 2,21011X1 2,377,8(X1 1,1)86,3(X1 1,17,6(X1 1,(115,6(.1 1,118,71 17,747,5(1(1 TR (M Vlb.-C-iaas 2ffi 286 288 286 288 299 289 2911 2911 291 2911 291 289 Avrsagc DMy-Of'1 Watu Usc 311,865 31,134 35,758 55.91.1 46,397 91.9(3 71,319 76,703 36,2111 35,41 33,853 3631X1 'IT�CU Wfficr USC 22,173,81X1 19,865,91X) 23,826,21X1 32,843,81 32,-6(.1 46,591,(1(X1 48,1115,3(X1 44,(112,9(X) 26,323,(1() 25,5225(X) 22,12,61 23,495,8(X) 368,152,4(1(1 'total Wfficr COarccti0as 4,164 4,171 4,243 4,275 4.278 4,211 4,303 4 318 4,36 4,3(3 4.a1 4.- 4,272 Avcmgc Daily Wfficr U. 694,514 662,991 7685X1 12194193 1,(54,181 1,553,033 1,551,711 1,421,7(5 877,433 823,315 744,753 757,929 M-r(Cl'Srffiioa) 25,870"659 22,915,455 235(X),1112 31,777,352 38,159,897 43,1(X),271 62,022,698 511,426,148 3 1,257,149 28,(.X1,939 24,X1"862 24,686,352 415,448,793 L,fi ed aamRCmdlotkermMred water use !!.7(8,.15 Unn2d WffiG' 306,859 2,9!19555 (326,188) ((56,448) 5,17(1297 (3,4911729) 13,917,398 6,153248 4,934,149 2,47$439 2529,262 "19(1552 2.6591587 %Unsmonhd Watts' 14% 13% -1% -3% 14% A% 22% 13% 16% 9% 1(1% 5% 7% LUU(YUD9esvlre A-) 41!,7(1(1 54461.1 762,2(X) 1,1916(X) 973,2(X1 1,.)4,2(X1 1,71151.1 1,857,3(X1 736,111X1 797,3(X) 00,4(X) 746,5(X) 12,299,5(1(1 Avcmgc(gpd) 15,635 18,779 24,587 39,7211 31,394 6(1,14(1 55,210 59,913 24,533 25,719 232113 242181 YI'Ya Ca.• 42954551111 4117,2275(X1 433.741,154 413,743566 432,672,21) 4(5.3711,8(X1 433,7111,21X1 18,875,8(11 33(1.113,(1 365.51)8,833 418,017,(XXI 437.381,233 4,9(5,898,196 City Lake MC[cr° 452,211,(X)(1 427,63821(X) 458,329,464 447,778,961 466.635,111X1 454,766,111X1 483,518,111) 444,.16,111X1 1 357.1725(X) 391,828,633 44"(151.1() -,623533 5,2X1,350,16 *Mill vse calwlffiN by sob[meting City maerer nxxer aM LUD avcfiam City Lvkc meter sarsagc °l'MCi lake mxera enercev riNic lass of owe esoltin intM mercs'trnalizer Min a'ased.Totals cakmlfficd from avesa cdail rradin atom ffic for loo tiara. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS JsaX15 -115 -16 Apr 42 Mny{IS Jan-115 Jal-115 19(b S,,)5 (.6[415 Nov-(15 Ucc(15 'IaraF2(X2 IN-CITY Sinslc family RCVidcntisl Gnaamp[icn�sllans) 12534,700 I1,151,]lNl 14,]85,4(X) 2,625,(1(.1 18,)65,2(X) 20,128,7(X1 25,515,6(.) 31,826 I(.) 1$.(1,111.1 12,793,8(X) 11,52(1,](X1 14,(132,6(X) 2(X,311.10 ConncRions 351% 3,524 352% 3,535 3,54(1 3,546 3,551 3,553 3,561 3,564 3,579 35%3 3.11 Avciasc(gpd) 4(14.345 384,541 476,94% 454,167 592,426 67(1157 823.05.8 1,1126,648 911,333 412,](13 384,023 452.66 MakiI.ulyR idcatial Coaaomptioa(Xal-) 1,8.89,91)(1 1.912,21.1 2,2911,7(X) 2,13],1(X1 2}25,6(.1 2,5951(.1 2,681,1(.1 2..121(.1 2,498,11.1 2,112,21.1 1,738.7(X1 2,.1,..1 26,]66,2(X1 ConncRians 119 119 119 119 II% 118 11% 118 12 119 II9 119 119 Avcrosc(%pd) 59.674 55,248 73,894 ]1,23] 75,1119 %653() 86,48] 91,](16 83,270 68,135 57,951 6],4]7 Commciaia( Ccaaamptica(,al-) 4,(1611,2(X1 3,065.(1(X1 414(111X) 4.383,4(X1 511%]5(.1 5122,1(.1 5521,4(.1 7,714,1(X1 6.226,31X1 5,(1%(11(.1 3,FQ35(.1 45211. 91,83],2(X1 Coaac-, 3111 312 3(M 3(M 3(M 3(M 3(2 3(M 3(M 3(M 3(M 3115 31M Avcmpc(%pd) 130,974 126,(24 151,38.8 146,113 167,339 197,402 17%,1111 248,842 2(1]543 163,91.1 120,783 145,868 ('rcrvcrnnxnt Canavmp[ion l%sllons) 1297.10(1 1.1(195(X1 1,555,()(X) 1311,8(x1 21119,61X1 2,511,8(X) 2,(112,5(X) 3360,0(X) 2,15(1,4(X) 2.9,3. 15(11,3(X) 1,42]5(X) 22.665,%(1(1 GnncRions 51 51 57 58 58 58 38 58 58 58 58 58 56 -Wc (%pd) 41,842 3%,259 511161 571191 65,148 83,]2] 64119 Ill%.3X1 ]1,68(1 64,816 511,(143 46,048 Irrisffiion Canaamp[ion(pallcna) 119.11111 95,31X) 1,482,21X1 8(M,4(.1 2,416,6(X) 3,86(1,3(.1 4,51185. 4,6%411.1 2314,6(X1 3]4,9(.1 154,4(X) 1541(X) 211,9]11,111(1 CanncRions IS Z(1 32 4(1 53 55 56 57 56 27 ZI 23 38 -Mc (%pd) 3,842 3,2%6 47.813 26,813 ]]155 128,6]] 145,435 151,126 ]],153 12,1194 5,147 419] WMlcvak:(I T WOa3ca) Coreampu-(sal(oaa) 913.1X)0 67],(1(X) 9]],111.1 ]58111X) I,(146111N1 I,-O(M 1562111X) 2593111.1 682111X) 1,3511111.1 9113,(1(X1 8861(1(X1 Coaac-, 1 1 I 1 1 1 1 1 1 1 I I 1 -Wc (gpd) 19,452 23,345 31,516 25,267 33,742 47167 50,3X1 .3,645 22,733 43,548 3(1,1(.1 28581 'IbW 1-ity WaNr Uac 211,464,(IIXI 18,29(1,7(X) 26,(21,21X1 23,419,7(X) 31,3915(.1 36,457,81X1 41,%(11,1(X) 53,121,11(X1 31111,4(X) 23,721,1(X) 19,441,6(X) 23,114,7(X) 3491134,.111 TI 1a-City WfficrC-i- 41114 4,(23 4,(141 41157 41 1]4 411%2 41166 4.091 4.018 41173 4,0. 4,0. 4,(166 A We Daily 1-ity-USC 6411.677 630,714 839,716 7%11,657 1,(111,629 1,215,291 1348,423 1,7111,355 11163,713 765,- 648,053 745,635 WNSI ON C11'YCLEN COVE Siaplc familyR idcatisl Ccaaamptica(,aa-) 882,](X1 %(1],(1(X1 Yll Alp 99115(X1 1,121,4(X1 1,4955(X1 1,]63,1. 23(X1,1. 12350. )]5,21.1 71(11(.1 1,(M 1.1(.1 14,29451111 Coaac-, 245 245 246 243 24R 245 246 251 253 253 253 254 249 Avcmpc(%pd) 28,474 21,82% 31,335 33,(11] 36,174 49,85(1 56,874 74,197 41,187 31,458 23,69] 335.1 Mold beauty R idcatial Ccaacmptioa(%slloas) 21,5X)(1 I8A1. 21-1 221. 24,61X1 27,8. 88,4(X) 4661M 25)1. 21 M) I%31X) 24,0(X) 361,411(1 --ioaa 2 2 2 2 2 2 2 2 2 2 2 2 2 -W,(%pd) 7(X5 621 716 763 794 927 2,852 1,503 .33 7(X) 610 774 Commcirial Caaaamptioa(pAloaa) 193,.11 1431. 196,61X1 1825(X1 1%3,(1(.1 2291. 4691(.1 684,21X1 226,3. 219,3(.1 1%3,6(X) 22$8. 3,141,(X)(1 ConncRio.. 45 45 45 48 45 48 45 45 45 45 45 45 46 -Mc (%pd) 6,226 4,6Q 6.342 6,0%3 5,103 7,663 151158 22,071 7,543 7,074 6,1211 7,381 Gmc Coaaamptica(salloaa) Coaac-, A We (%pd) - - - - - - - - - - - - Irri%ffiioa Coa ,kioa(v.11 s) 2,(X)(1 3,11(X) 2,111X1 I,lllp 5111. 6,(1(X) 6,0(X) 7,(1(X) 3,(1(X) 40(X) 1,(1. - 39,1X)0 -.-ioaa 1 2 2 1 2 2 2 2 2 1 1 1 2 -Wx (%pd) 6 103 65 33 161 21.1 194 226 11.1 65 33 32 TR (MOf lb.-USC 1,.9,.(1 -,9(.1 1,192,2(X) I,ISK1l.1 1,334,111.1 1,759,2(X) 2,327,4(X) 3,127.x. 1,48911.1 1,21 8,-1 913.8(X) 1,2941(X1 1],%35111(1 TI (M Vlb.Ware Caarectiaaa 293 294 295 294 2Y1 2Y1 295 3IX1 3(2 301 3(11 3(12 298 Avciasc Daily-f'1 Watu USC 35,471 33,514 3%,458 39,- 43122 58,64(1 ]511T1 9]19] 49,663 39,29] 30491 41.]]1 'IT�CU Wfficr USC 21563,61X) 19,262,6. 27,223,41X1 24,616,6. 32,6945(X) 38,217,(1(.1 44,1285(X) 56,(1581(X1 33,41)1,3. 24139,3. 211,355,4. 24,.19,6. 366,X1(1,7(10 'Total Wfficr COarcctiore 4,3(1] 4,317 4,336 4,351 4,371 4,3]9 4,361 4,391 4,4(.1 4,374 4,3 83 4391 4,363 -Mc Daily Wfficr U. 676,148 664,228 X1,174 %2(1553 IJ24,fi61 1,2]31(X1 1,42351X1 1,%118,352 1,113,377 .M,4. 6'18513 787,4116 M-r(Cl'Srffiioa) 21,274,448 21124,421 25591,1168 25,63(),315 33515,615 36,X19,110 52145,734 55,.3,673 39,111(1,(1]5 29,4911,434 23159,715 27,135,027 395,419,654 Ustimatcd aamRCmdlotkcr mMrcd emtcr use 2,766,39% Unn2d Wffirw' 2.]1(1,8.88 2,661.821 (1,632,332) 1112.]15 821,115 0,337,891) $817,234 (995,22]) 5,.8.]75 4551,134 3,9.,315 2,725X2] 25,782556 %Unsmonhd Watm' 11% 12% -6% 4% 2% A% 17% -2% 14% IS% 15% Ill% 7% LUD(YUD9ervire Area) ].,1110 6635. %251(1(X) 91.16(X) IA1471. 1,195,4(X) 1,635,11X) 2 42,ft(.1 1,.15,3. 913,31X) 45],1(X1 %25,7. 13,443,.10 Avcrosc(%pd) 22,8]4 22,8]9 26,613 3(),020 33,812 39,847 52,745 78,252 61,510 29,461 15,237 26,635 YI'Ya Ca.s 438,110.100 4116,.82711 45(1,215,6(X) 342.1891126 1 443,.1(1,36] City Lakc MC[cr° 4.,382,.10 426,534,370 4]8,284,111X1 368,1.25%6 469,(175,667 *Mill vvccalwlffiN by vob[mctins Citymaercr nrxcr aM LUD avcficm City lakcmctGsar�c °l'MCi lake mxcrcx cncrccv riNic lass of nac csoltin intM mcrutoralizcr Min aascd.Totals cakmlfficd from avGa cdail rradin atom ffic for(eat tiara. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS J-6 -1. Mar{Yr Apr-(X) ay{)6 Jaa{)6 Ja1{)6 Aug-(X) Scp416 (kt{16 Nov-(16 Ixc-(16 'I'alaF2(N16 IN-CITY Single amity RCSidcntisl Gnsomp[ion(gallons) 11,]41,.1(1 12,331,11.1 12,16],1(.1 12,81871.1 I%}I56,ft(.1 24,%11,11.1 26,522,111X1 31,6)],6(X1 16,10,71.) 14,1.1,11.) 13,4(11,2, 13,6117, 2(18,615,51111 Co-ions 3,5X5 358% 3,58] 3,115 3,601 3,03 3,61. 3,617 3,614 3,623 3,631 3,635 3,.1 Avrsagc(gpd) 3%0,310 425,238 418,214 421,157 5%2,471 %21,703 .1114. 1,(2(1,16% 544,61.1 454,152 446,173 441,281 MakiI.ulyR i-ial Coasomptioa(gal-) 2,0!16,100 L-,4(.1 1,145,7(X) 1,]1],3(.1 2,475,11.1 2.%64,0(.1 2,138,11.1 3,43 1,0(.1 2,136.1, 2,130,(.X) 2,(22,40!1 2,242,1(X1 2],158,31.1 ConncRions 111 111 111 IZ(1 IZ(1 IZ(1 IZ(1 IZ(1 IZ(1 IZ(1 INI 1211 12(1 Avcmgc(gpd) 64,731 6],8]6 62,761 51,110 71,%42 15,467 14,777 110,6]] 71,23() 6%,71() 67,413 72,331 Comnrsaial -.,t-(,a-) 3,840,1..1 4,558,6(.1 45]1,3(X) 4,1311,21.1 5,366,8011 6,443,21.1 6,518,70.1 ],46(1,4011 5,7111,4011 5,128,21.1 450].6(.1 4.818,1(.) 62,144,1011 Coaac-, 316 3lW 3(W 3(W 3(W 3(W 3(W 3Q3 3Q3 3Q3 3(13 3(W 3(W Avrsagc(gpd) 123,871 157,113 147,461 137,613 173,123 214,713 2111,281 2411,65% 1111,047 162,21X1 1511,253 155,435 ('rcrvcrnnxnt Coasomp[ioa(galloas) 151%,(X)(1 1.154,1(X1 1,343,6(.) 2,774,1(.) 1,184,1(.) 2,527,]0.) 2,161,1(X) 2,578,5(.) 3,(11 1,3(.) 1,814,0(.) 1,284,3(.) 1,21(1,8(.) 24,231,.)) Coaacaioas 58 58 58 58 58 58 58 58 51 51 51 51 58 -Wc (gpd) 48,168 31,8111 43,342 12,41] 64}21 84251 15,]71 %3,171 112,371 5%516 42.810 31,()58 Irrigffiion Consumption(gallons) 11],l.Nl 26115(.1 231,31X1 614,](.1 2,%30,21.1 4,141,31.1 6,168,21X1 5,831,(1(.1 2544,6(.1 161,2(.1 161,6(X) 714,5(X) 25511%,111(1 ConncRions Z(1 24 34 41 4fi 62 62 65 61 45 23 15 42 Avcsagc(gpd) 3,774 8,183 7,461 23,157 1121] 164,1]] 118,174 1%8,355 86,153 31,265 5,653 24,181 WMf-s (IT WOn3cn) Coreomph-(gaiona) 82%1.N) %(1,()X) 1,(116,1)(X) 75%1)X) 7511)X) 1,3351)X) 1,4151)X) 1545111.1 6%11).1 51161)X) 4]2,(1(X1 320,(1(.1 Connc-, I 1 I 1 I 1 1 I I I I I 1 AvcWa (gpd) 26,710 33,103 32,]]4 25,267 24,4&1 44,11.) 48,226 4%831 22,167 16,323 15,733 10,323 'IbW 1-ity WaNr USC 2(1,1111,51.1 21233,1(X) 22,(115,01X1 23,053,81X) 31,4]2,8(X) 43,010,3(X) 46,611,1(X) 52,411,1(.) 30,523,1(X) 24.538,1(X) 21,465.1(.) 23,(W.0(X) 3.1}21,4(1() 'Ib 1-City Wfficr CO-i0re 4,1188 4,(114 4.103 4,111 4,13(1 4,148 4,153 4,164 4,158 4,151 4,137 4,134 4,132 Au W Daily 1-ity-U. 648,371 732,203 712}117 768,4.1 1,(115,252 1,433,671 1,5113,11, 1.613,274 11117,463 711,50 72 8,837 743,411 WNSI ON C11'YCL):N COVE Singlet-1,R idea im Consumpt-(,a-) ]81,1.X) 140.8X) 1,124200 1]52(.1 1,3522(X1 2.2(152(.1 2515,1(.1 2,18470.) 163,745 1,(150,300 lj-,Wl 1,2542(.1 16}62,345 Connc-, 251 257 251 258 263 265 2]4 261 265 266 262 263 262 Avrsagc(gpd) 25,223 32,424 33,361 32,123 43,635 ]6,84(1 81,145 16,281 5,458 33,881 33,463 411,458 Mufti lanuty R idcntisl --ph.. 11,5(1(1 21,4(.1 22,1(X1 17 5(X) 17 9(X) 35,1(.) 43})(.) 64,21.) 28,1(.) 12,0(.) 1],4(X) 23,4(X) 323,200 --ions 2 2 2 2 2 2 2 2 2 2 2 2 2 -W,(gpd) 621 738 731 584 571 1,1](1 1,3X1 21171 163 3X1 5.1 755 Com-iA Coaaomp[ion(gaiona) 1155011 24],11X) 2]671.1 1]8,4(.1 1 313,8(.1 454,6(.1 383,11.1 313,7(.) 273,7(X) 226,8(.1 2]$6(.) 268,8(X) 3,412,(X)(1 --i... 4% 45 45 45 45 45 45 45 45 45 45 45 45 Avcsagu(gpd) 6,306 8.534 8,126 5,147 1(1,123 15,153 12,381 1271.) 1,123 7,316 1,28] 8,611 Gmc c.-ph-('11-) c.-ions AvcWs (,d) - - - - - - - - - - - - - Irrigffiion Consomption(gpllons) I,IXI(1 2}I(.1 I})X) 31,(1(X) 2,(1(X) 8,(1(X) 1,(1(X) 3,(1(X) I,O(X) 2}I(.1 2}1(X) 62,(X)1) -.-ions I 1 1 2 1 2 2 2 1 1 1 1 -W(gpd) 32 61 33 LIX.1 67 258 210 I(.1 32 67 65 TR (m of lb.-Use 11],10() 1,211,21.1 1,333,8(X) 1,172.6(.) 1,715,41X) 2,716.1(X) 2,150,41.1 3,451,6(X) 461,345 1,21(),1(.1 1,301,1(x1 1,54%,4(.1 2(1,231,545 TR (m Vlb.-c-ions 2(2 3(15 3(16 3(16 1 312 313 323 301 314 314 31() 311 310 Avrsagc DMy-Of'1 Watu Usc 32,11() 41,766 43,1126 31118] 55,335 13,23(1 15,174 111,342 15,645 41,616 43,31 41,148 'IT�CU Wfficr USC 21$-,41.1 22,445,1(.) 23,4(18,81.1 24,226,41X) 33,188 AM 45,1X)],2(X) 415615(.1 55,143,1(.I 311,113,245 25,%28,6(.1 23,16],(1(.) 24,514,41X) 3W 1,2611,145 'Total WfficrC-i0, 4,3(1 4,- 4,41. 4,425 4,442 4,461 4,476 4,473 4,472 4,465 4,447 4,445 4,442 Avcsagu Daily Wfficr U. 6.1,161 713161 755,123 8(11,14] 1,070,587 1,526,1(1] 1,518758 1,.W,616 1,1)33,11)8 833,181 712,233 ]13,368 M-r(Cl'-ion) 25735,857 24,%61,1167 2],8115]2 28,411,627 35,321,354 41,468,047 6(),%65,773 58,384,721 40,851537 31,131,118 25,180,011 26,425,11X1 41,344,568 Ustimatcd unmRCmdlotkcrmMrcd emtcr use 1,810,134 Unacmnn2d Wffics' 4,638.45] 2,415,16] 4A14- 4,265,22] 2,133,154 (4,331,153) 112(,2]3 2.441.621 1.%66,212 5,311,318 2,813}111 1,83(1,6,( 45,243,488 %Unsmonhd Watt' 18% 10% I6% 15% 6% -Ill% Ilk 4% 24k 1]k Ilk ]% II% LUD(YUD9esvlre A-) 512,4(10 682,1(.1 642,6(.) ]%1,11.) 147 MM 2,1]3,(1(X) 2,11652(.) 2 35,4(.) 13651X) 1,1,1,4(.1 %7 9M ]36,1(.1 13,MI),5(1(1 A,ci (gpd) I6'- 23,121 2(),- 26,3x) 2(),148 72,433 66,611 76,1177 31,217 33,852 32.263 23,745 YI'Ya Ca.• 388, 0,20 3]8,%13,44(1 442,381.833 421,25671X) 4(1]1853,8(X1 318.812,8(X1 428,623,162 416,*)0,](X) 3]2.3]4255 35],413,0(.1 312,1151,1(.1 351,153,(11] 4,675,834,877 City Lake MC[cr° 4111,1110,(161 4(12.12(1,640 466,433,233 446,2]3,(1(X) 441,181,11(X) 446,823,(1(X) 480,211,862 474,1)2,21X) -.8)41)X) 384,211,11(X) 336,186,8(.) 3]6,483,11] 5,(161,156,322 *Mill vsccalwlffiN by soMmc)ng Citymaetcr nxxcr aM LUD asctiam City LkcmclG'saraagc ""I'MC'.i lake rrctcrcx cncnccs riMic lass of ouc csulOn inlM mcrcr totalisr Min aascd."Totals caknlfficd from avcm c6'I rcadin srom ffic for loa tiara. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS J-7 Irh(II -117 Apr-1 M,117 Jun{I] Jvl{l] ,lvp-07 1,117 (x[417 Nov-(!1 Ixc-(1] 'I'vlaF-7 IN-CITY Sinslc family RCSidcntisl Gn,omp[ion l%sllons) 12,(111,.1(1 It 757,3(X) 13,71%,5(.) 12,473,4(.1 23A112,11.1 11,157,2(.1 22,ISfi,ft(.1 24,55%,4(.1 15,331,11.1 13,747,ft(.1 12,611,fi(XI 22,33(1,1(X1 2(3,11,]1111 Co-iovs 3,634 3,638 3,642 3,647 3,657 3664 3,661 3,673 3,675 3,674 3,675 3,675 3,1(1 Avr,asc(gpd) 38],]35 4(14,]34 442,532 415,71 742,352 665,24(1 714,735 712,21 511,303 443,471 420,3211 720,352 MvkiI.ulyR i-ial covsvmptiov(Sal-) 1,764,A1() 1.114,( 1 220,3(X) 1,%(12,3(.1 2,118,41.1 2,346,](.) 2,5()0,6(.1 2,768,8(X) 2,155,11.1 228521.1 2016,1(Xl 215,8(Xl 26,11%.6X1 GnncRions Izl IZI M 121 120 12(1 120 120 12(1 121 Izl IZI IZI Avcrosc(%pd) 561111 681161 73,235 61,077 16,723 78,223 80,665 %1,316 71,837 73,716 67231) 67,60fi Com-i. -.,t-(,a-) 3,.17,(XX) 4,516,81.1 5,1115,%l.l 3,811,8(11 6,6%1,8) 551%1 5,136,5..1 6.)12,21.1 5,160,6011 4,111fi.1(X) 4.12.1) 4A211NX) 1,855,7011 covvc-, 3(3 3(13 313 31 31 31 3(18 31 305 305 305 3115 .15 Avr,a0c(Spd) 1111,113 155,752 164,](3 127,327 215,8011 1%3,1111 111,41) 211,426 11%,687 15%,2%7 135,403 133,114 ('rcrvcrnnxnt Cov .f iov(,.R vs) 136(1,2(1(1 1.376,2(X) 1,626.](X) 1,331,2011 3.161,4011 2,243,11X1 2,12,5011 2,154,2011 1,781,5011 1,687,3011 1,3(1(1,](.1 1,133,11X1 21,212,1!1(1 --iov, 51 51 57 57 57 57 57 57 57 51 57 57 58 -Wc (%pd) 43,871 47,455 52AI 44,6411 112231 74,770 66,532 61,4111 51,651 54,421 43,357 36,577 Irnsffiion Consumption(gallon,) 78,7(X) 3(1],41X1 227,81X1 618,8011 4,151,21(1 3,725,7(X) 4,541,8(11 4,743,7(X) 2,(11%,21.1 4(14,,5(.( 1611,4(X) 65,2(X) 22,011,410 Conn-.. 17 I1 25 31 6) 61 63 57 51 21 24 14 31 Avcmgv(gpd) 2,531 1(1,61X1 7,348 23,213 151,175 124,1111 146 510 153,023 61,14(1 13,()8 5,347 2,1(3 Whalcsak:(I T WOn3cn) c.-ph-(,n-) 21],(.X1 38$111 666,111X) 5]2311X) 142311X) I,271 SAX) I,1 I31(.) 1,3313X.1 ]111311.1 ]34311X) 6]6,(1(X1 421,(11 1,(15,0!X1 connc-, I 1 1 I I 1 1 1 1 1 I I 1 AvcWa (gpd) 1,5%I 13,371 21,4)1 11,067 311,381 42,367 34,226 42,1(3 23633 23,671 22,533 13,831 'IbW 1{ily WaNr U,c 18,12],21.1 2(1,211,]0!) 23,615,1(X) 20,71,5() 41,771,710 35,(163,4(X) 38258,]0!) 42,357,3(X) 2%,(151,51 23,765,]0!1 20,%25,7(.) 311,183,8) 343,%25,310 TI 1-CityWfficrC-i0re 4,136 4,141 4.15() 4,161 4,2111 4,21 4,210 4,214 4,21] 4,1%1 4,183 4,173 4,183 AerWa Daily 1-ity-Use 61(1,555 611,1111 761,]7] 6111,183 1,1 475 1,168,7.1 1,234,152 1,36fi,365 135.-1 766,635 614,11!1 173,671 WNSI ON C11'YCLEN COVE Single1-ly Residential Con,umpti0n(gallon,) 615,3(X1 1,35281X1 1,1114,41X1 833,4011 2,(1%6,6011 1,15(1,31.1 2,(.X1,]0.1 1,127,8011 1.3]7311.1 155,4011 813,21 122.71 15,131,6X1 connc-, 268 268 2711 276 276 271 28 271 27% 281 281 281 275 Avr,agc(gpd) 11,848 46,648 35,626 27,].1 67,310 65,(11(1 64,531 62,187 45,11.1 311,811 2],1(1 21,765 Mvki lanuty R idcvtim Con,vmption(gallons) 12,700 21 AI(X) 2631(X) 2(0(X) 45,O(X) 323100 213100 42,O(X) 34A11 74A11 42,(1(X) 23,01X) 4(1(1,](1(1 --ion, 2 2 2 2 2 3 3 2 2 2 2 2 2 Avcmgc(gpd) 401 724 831 667 1,452 13167 135 1.355 1,133 2.387 1,41X1 742 Com-iA covavmp[iov(pAlova) 141,.)(1 2]6,21.1 211,111X) 181,]00 5112,5(X) 4(X1,4(.1 434,]) 454,81.1 410"(.1 467,600 1,014,2(X)1 2118,(1(.) 4,884,61(1 Conn-.. 45 45 45 45 45 45 45 45 45 45 45 45 45 Avcmgu(gpd) 4.811 1,524 1,645 6,257 16,210 13,347 14,023 14,671 16,337 15,081 33,.11 6,710 Gmc consumption(gallon,) connc-, AvcWa (gpd) - - - - - - - - - - - - - Irngffiion c.-,.-(,'l-) 1,1.1(1 1}Il.l 211(X) 201X1 6,(1(X) 3,(1(X) 4,01X1 3,(1(X) I,OIXI IOIXI IAI(.1 25,10 -.-ion, 1 1 1 2 2 1 2 1 1 1 1 1 A,rWa (gpd) 32 1 65 67 114 I(.l 121 17 33 32 32 TR (m of'I'own-Use ]]8,4(1(1 "6513XX) 1,431,4(X) 11143,11.1 2,fi4(1,11.1 2,385,](X) 2,468,4(X) 2,427,6(.) 1,11121(.1 "418,111.1 1,11fi1,4IX1 1,154,]1 21,211,1011 TI (m of'I'own-conrection., 316 316 31% 325 325 3211 32% 325 326 321 )2% 321 324 Avrsagc Dai(y()ot of'1 Watu Usc 25,110 56,131 46,174 34,770 %51165 71,523 71626 78,3111 63,403 48,323 62,313 37,248 'IT�CU Wfficr U,c 11,71,61.1 21,1511,71X) 25,1.615(.1 21,]48,61 44,411,810 3],441,100 40 727,100 44,]84,1(X) 21,153,600 25263,]00 22,15,1(X) 31,338,5(X) 365,(15,21(1 'total Wfficr COnrcvti-, 4,452 4,451 4,468 4,414 4526 4,521 4538 4,531 4543 4518 4,511 4,502 4,5(16 Avcmgu Daily Wfficr U. 635,6fi5 756,121 .)7,152 724,153 1,432,631 1,248,303 "313,]]] 1,-674 11$453 814,158 756,503 1010,111 M-r(Cl'-ion) 23,768,017 22,116,11.1 26,141,511 26,%25,(34 38,355,11.1 31,13,317 511,663,376 41,071,743 37,133,822 26,%52,103 24,%%5,568 24,)1,701 3%1,516,36(1 3ffiimatcd vnmctcmd/othcr mdcrcd waN,'v,c 5,100,478 Unacmnn2d WffiG' 4,(162,411 215,41.1 "15,(111 51176,434 (6,(255,11(1) 1,644217 1,136276 4,286,843 7,1811,222 1,588,403 2,11(1,468 (6,72%,711) 11,42(I,fi72 %Unsmvntcd Watt' 17% 1% 4% 11% -16% 4% 2(1% 1% 11% 6% 1% -27% 5% LUD(YUO9e,vlre Area) 513,.10 671,11X1 816,1(X) 655,2(.) 1,]%6,2(.1 1,41],5(X) 11518,51.) 1,740,6(X) 1,14221.1 Wl1,ft(.1 684,4(X) 763,]1 12,647,1011 Avcmgc(gpd) 16,574 23,445 26,326 21,8411 57,611 47,2511 51.565 56,148 38,073 27,413 22,813 24,635 YI'Ya Gs 417,134.111 4111,582,585 473.(176A(X) 4,3;;.028 463, 2y10 45],811,8(.1 47],552,4(X) 446,518333 351.12,21X1 421.433,2 6]1 3.( 1,071 466,3111,..1 5,32(1,118,174 City Lakc MC[cr° 438,154,(X)(1 432213,1115 418,131,(1(X) 486,714,828 5111,]21,111.1 416,678,41 511,81$(1(.) 413,1.3,533 382,188.0 455,16,767 486,4411,571 41$411411(X) 5,611,121,284 *Mill vsc calwlffiN by svb[mcting City maetcr nxxcr a�LUD asctiom city lake mctrw'sar�c ""I'he C.i lake rrcterexenenecs n.w lass of owe esvlan iv the merr totalisr Min a'ased."Totals-1-from avemc6'I rcadiv,tom ffic for I-data. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS JaMI% Irh(1% Mar{I% Apr 0. May{18 Jun{I% Jal{I% Aap-(1% "pll% IN-CITY sin Il I mity RCSidcntisl Gnaomp[ion lSsllOns) 11,%5),2(1(1 I1,915O1N1 12,43ft,(1(xl 13,393,8(x) 14,62%,51x) 1],755,3(x1 25,677 x1 21,5266(x( 16,4(1(1,3(x) 14,11%8,8(x) 11,521,51 14,924,7(x) I%5,113,1(10 Co-i- 3,674 3,6%5 3,6%5 3,691 3,691) 3,69% 3,7(x) 3,71 3,701 3,7(16 1- 1711% 3,16 Avciasc(gpd) 382,6. 410,862 .11226 446,41 471,887 591,171 %2%,3113 14,4(X) 546,671 454,471 3 84,(15() 4 81,442 MakiI.uly I-i-ial Consomptioa(Sal-) 1,826,1)(1 2,1.31.x1 2,134,5(x) 2,(168,71x1 1,981,6(.1 2,264,8(x1 2,791,3(X1 2,538,9(x1 2,11,21x1 2,151.91 1,745(Nxl 221].1(X1 25,47%,Ilxl ConncRi0ns 121 122 122 123 123 123 123 123 123 123 123 123 123 Avcrosc(Spd) 5891 ](1,448 6$855 6%,951 64,116 75,493 9011M2 81191 7(1,3(17 1,416 58,167 71519 Comnr�aial -.,t-(,a-) 3,%92,2(x) 4,254 51.1 4.430,7(.) 4,61 8,31x1 4,5113.x1 5,(.23)1 6,76(1,4(.1 6,(1%%,Ilxl 4,533.9(x1 4,92(1.91 3,524,3(x1 4,270.11 56,,5,46,411(1 Connc-, 3115 3115 3115 - - - - 3(!1 3(!1 3(!1 3(3 3(112 3(17 AvcmOc(,,d) 125,555 146,707 142,926 153,943 145,516 16 8,067 21%,077 196,39!1 15111311 15%,739 117,477 137,745 ('rcrvcrnnxnt Con .f ioa(,.(Ions) 1.16920(1 1.324A(X) 1,390,1(x1 1,371,7(.) 1586,2(.) 1,722,1(x) 2,327.6(x) 1,724,4(.) "&I8,()(.) 1.411,9(.) 1,037,4(x) 1,264,1(x) 17,943,10() GnncRions 51 51 58 57 57 57 57 57 57 57 57 57 57 -Wc (Spd) 37316 45,61 44,842 45,9'24 51,168 57,4(3 75.0. 55,06 53,6(M 45,545 34,5%0 40,771 Irnsffiion Conxomp[ion(pallona) 62,10(1 94.71.) 1(12,4(x1 212,91x1 2,1911,9(x1 1,732,0(x) 5,655,21x1 4,2(19,1(x1 2.123,9(x( 992,1(x1 2811,3(X) 641,71x1 19,17,3(1(1 ConncRions I1 28 23 311 47 55 64 65 53 41 23 23 39 -Mc (Spd) 2,1x)3 3,266 3,313 7,1197 70,674 57,733 182,426 135,777 97,463 32,1x3 %343 20,7(x) WMf-s (IT w-) Coreomptioa(san-) 287,1X)0 414,1)(x1 5)20(x) 5683.x1 541m ,5,420(x1 1,32701x1 1Q17O1x1 63701x1 5943.x1 370,0(X) 4%1,(Ml 7,645,(.x1 Coanc-, I 1 I 1 1 1 1 I 1 1 I I 1 AvcWs (gpd) 9,258 14,276 161194 18,933 17,613 28,1167 42,8(16 34,742 21,233 19,161 12,333 15,516 'IbW 1-ity WaNr Uac 191199,81x1 20,(.5,6(.) 211,997,71x1 22,239,4(x) 25,450,21x) 29.338,2(x) 44.538,9(X) 37,164,1(x) 28.212,3(x) 24,159,6(x) 18,478.51 23,79$71 313,523,(X)0 TI 1-City Wfficr CO-i0w 4,173 4,199 4.194 4,21 4,225 4,241 4,252 4,255 4,246 4,235 4215 41.1 4,222 Au W Daily 1-ity-J. fi16,113 11,228 677}45 741,313 8211,974 977,9411 1,436,739 "198,842 9411,4111 719,342 615,950 767,7(.1 WNSI ON C11'YCLEN COVE single 1-1,I-i&aisl -.,t-(,a-) 9391(.X) 1.121,8(.) 942,51 I,(1&1,11 1,1220(.) 154s,1ar 2,799,6(.) 1,9481.x1 "08111(.1 "134,4(.) 8(199(.) 1,237,5(x) 15,743,- CoaacRioas 281 282 282 211 285 285 2M 285 281 28(1 281 21 z84 Avcmgc(gpd) 311,291) 38,683 30,413 35,337 36,194 51,63 911,31(1 62,831 36,037 36,594 26,99!1 39,919 Mold I-ity R i-isl --ph..(9s0oa1) 23,(X)(1 2801 24)11 27,0(.) 333)(.) 4(1,0(.) 55,0(.) 39,0(.) 223)(.) 263)(.) 23,01X) 2-M 368,(X)0 --i- 2 2 2 2 2 2 2 2 2 2 2 2 2 -W,(gpd) 742 91 774 9(x1 1.065 1.333 1,71 1258 733 839 767 903 Com-iA Consumption lgallona) 234,5(x1 275,31X) 265,11x1 264,8(.)1 3%6,(1(x1 3911,21x1 558,8(x1 495,11x1 284,3(x) 291,6(x1 1 193,71 I 2116,5(X) 3,.1,911(1 --i... 45 45 45 45 45 45 45 45 45 52 45 45 46 -Mc (gpd) 7,565 9,493 8552 8,827 12,452 13,007 18,026 15,971 9,477 9,406 6,457 6,661 Gmc Consumption(gallons) Connc-, AvcWs (,d) - - - - - - - - - - - - - Irngffiion Con ,kion(gpllons) 10(x) "ll(x) "ll(x) 3,(1(X) 5,(1(x) 4,0(x) 3,0(x) - - - IS,IX)(1 -.-iona I 1 1 I 1 1 2 - - - 1 Au W(Spd) 1 33 32 1(.1 161 129 Ilxl - - - TR (M Of'I'own-Use 1.196,,51x1 1.426,11x1 1,231,6(x) 1,35211.11 1,542,111x) 1,981,3(x1 3,418,4(X) 2,48fi,11.1 1,390,4(x) 1,452,111x1 "026,4(.) 1,47211(x) 19,975,711(1 TR (M OVlb.-COnrectiona 328 330 329 332 333 333 333 333 336 334 334 337 333 Avciagc Dai(y-Of'1 Watu Usc 38.517 49,176 39,729 453197 49,742 66043 110271 80,- 46,347 46,839 34213 47,411 'IT�CU Wfficr USC 20,2K 1 21,471,71 22,229,31x1 23,592,3(x1 26,992,21x1 31 31115(.1 47,957,3(x) 39,65(1,2(x1 29,&)2,7(x) 25,611,6(x1 19,5114,9(.1 25,2711,7(.) 333,498,700 'total Wfficr COnrcati0, 4.501 4,529 4,523 4,541 4,558 4,574 4,585 4,588 4,582 4,51 4,549 4,557 4,555 -Mc Daily Wfficr U. 654,719 740,413 717,1174 7%6,410 870716 "(M3,9.3 1,547,1)10 1,279,039 986,757 826,181 65(1,163 815,111 M-r(Cl'-ion) 22,371,2%6 20,138,939 22,572,818 22,5110%2 30,333,949 33,1)75,8(16 48,075,459 43,651,556 35,464,352 23,637,391) 24,997,271 242119,238 35"112,145 L,fi cd anmc[cmd/otlrr mdcrcd watG'vac 5,936,738 Unacmnn2d WffiG' 2,-,9M (1,332,761) 343,518 (1,1x18,218) 3,341.749 1,756,31 118,159 41X)1,356 5,%61.652 (1,914,210) 5,492,371 (1,1161,462) 11.676,7117 %Unsmonhd Watt' 9% 1% 2% 4% 11% 5% 0% 9% 17% A% 22% -0% 3% LUD(YU39ervire Area) 661,2(10 694,91.1 883,4(x) 757,8(x1 -,-) 1,428,111 2,211,8(x) 1,879,8(x) 914,11x) 953,71X) 646,3(.1 I,16(1,91 13,(119,1(Ill Avcmgc(gpd) 2 1329 23,962 28,497 2521 26,611 47,6(x) 71,348 6(1,19 3(1,471) 3(1,765 21,543 37,448 YI'Ya Ca.• 476.641,5011 462,993043 48(1,954.3(X) 465,(36.9(.1 475,(.11,6(x1 454,976,5(x1 446,259.9(x1 506,104,581 387,44321x1 390,5911,71x1 383,447,076 j 485,114,432 5,415,299,732 City Lake MC[cr° 4)7,S99,IX1(1 485.159.643 &M,(X)7,lllxl 489,381,11(X) 5112,827,11(x) 487,724,111x) 496,429,111X) 547,634581 417.9&10(x) 417,156,11(X) 41,598276 512,276132 5,761,817.532 *Mill use ca 1-by,.!A.Ong City-rnrxcraM LUD ascfiom City Lkcmctcrsar c --"I'MC'.i lake rrct -enenecs nMic lass of owe esulan intM mercy totalisr Min a'ased."Totalscaknlfficd from avem c6'I rcadin.tom ffic for loa tlsat. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS ­9 Irh) Mar- Apr-(H May{ly Jun{ly Jal{ly Augm "poly 'I'alaF2(NIy IN-CITY Single family RCSidcntisl Gnsump[i0n lgallOns) 11,436,.10 I11,8AR,71N1 11,780,9(X) 14,1711,111.1 22,452,11X1 22,)0,2(.1 28,159,91.1 21,3(17,6(.1 18,]6151.) 12,791,51.1 12,701,8(.1 12,345,8(.1 -y 4 M1 Co-ions 3,7) 3,70. 3,711 3,714 3,]18 3,721 3,724 3,731 3,741 3,]48 3,755 3,758 3,]28 Avrsagc(gpd) }68129 374,093 380,1.21 4]2,333 721,261 760.0(( -,- 687,342 625,383 412,88] 423,393 318.252 MvkiI.ulyR i-ial Covsvmptiov(gal-) I,-,7((1 I.fi12,(XX) 1,158,2(X) 2,(1411,5(.1 2,624,9(.1 2,415,4(.1 3,(128,4(.1 2,28],1(X1 2,465,3(.1 1,812,6(.1 2,(182,6(.1 1,834,8(X1 26,(114,5(X1 ConncRi0ns 123 12} 12} 12} 123 123 123 123 12} 123 IZ} IZ} IZ} Avcmgc(gpd) 57,1.1 58,345 63,168 68,017 .1,674 8(1,513 97,69!) 73,777 82,1]] 58,471 69,4211 Comnr�aia( Consump[i0n(,al-) 3,5(13,(.X1 3,396,3(X) 3,8348(X) 4.358,1(.1 5,689,21.1 4,761,3(.1 6,397,7(.1 5,4335(.1 5.53],1(.1 3,14(1X(.1 3,934,1(X1 3.481,4(X1 54,2]5,4(X1 (.OaaCR1011F 3118 3118 3111 31(1 3) 31(1 311 311 312 312 311 311 3111 Avrsagc(gpd) 113,01.) 117,114 123,](3 145,270 183,523 158,9]] 2(16,377 1]5,2]4 1845](1 127,126 131,137 112,303 ('rcrvcrnnxnt COnsvmp[ion(gallons) 1.139,5(1(1 1.1()55(.) 1,129,](.1 1,235,1(X) 1,988,8(x1 1265,8(.) 2,113(1,8(.1 1,762,6(.1 1-4,7(.1 1,4(186(.1 1,)3,7(.) 1,(.14,(11.) 1].138,.1(1 Conncaions 5] 5] 56 56 56 56 56 56 56 56 56 56 56 -Wc (gpd) 36158 38,121 36,442 41,1](1 64,155 42,113 65,510 56,858 65,823 45,431 36,457 32,- Irngffiion COnsump[ion lgall0ns) 444,(X)(1 13521.1 116,3(.1 738,4(X) 2,189,6(.1 4,834,4(X) 4,754,3(X) 3,757,2(X1 2.938,7(X) 831,31.1 228,5(X) 482,0(X) 21,441,9011 COaaCR1011F Z(1 20 11 38 58 67 68 65 6i 47 24 I8 43 Avcmgv(gpd) 14.323 4,662 3,752 24,613 70,632 161,147 15330 121,2(X) 1],95] 26,816 7,617 15,548 WMlcsalc(I T w-) Corevmpti0v(gan-) 312,1X)0 521,()(X) 567,111X) 627311X1 1Y1S(X) 512311X) 1,252311X) T123(X) 644311X) 5111311X) 31(1,(1(X1 -MIM 780.,)1( Coaac-, I 1 1 1 1 1 1 I I 1 I I 1 AvcWa (gpd) 10.(165 18,241 18,2) 211,91X) 32,226 1],116] 4(1,381 24,913 21,467 16452 13})(.) 1355 'IbC(1-ily WaNr Uac 18,608,01X) 17,7116,7(X) 19.386,91X1 23,169,1(X) 35,943,6(X) 36,517,1(X) 45,623,1(X) 35,32(1,(1(X) 32,321,3(X) 21...1,9(X) 2(1,4311,7(X) 19,4381(.) 325,.17,4(10 'Ib 1-City WfficrC-i0w 4,218 4217 4,22(1 4,242 4,265 4,- 4,283 4,287 4,299 4,287 42](1 4267 4,261 Au W Daily 1-ity-U. fi(.),25R 610,576 625,3.1 772,303 1,159,471 1,219.903 1,471,713 1,131,355 1-7,- 687,1 SY1 681,023 62],(132 WNSI ON CI1'YCLEN COVE Single1-ly R i&aisl Consump[i0n(gallons) 929,4(X) 85(4(.) 914.7(X) 1,228,8. 1875,7) 2283,1) 2543,6. 1,826,8(.1 I,T15,7IX1 1,]114.9(.1 1,2517(.1 1,151.](.1 18,416,11X1 (.OaaCR1011F 2)2 2)2 213 288 294 294 294 294 294 294 214 214 293 Avrsagc(gpd) 29,981 2}I0 32,0.1 411,961 6)5(X) 76,103 82,052 581921 11ISX) 54,997 41,723 37,152 Mold1-ity R i-im --p- 26,(X)() 21 A)(.) 27,0X.1 31 AI(.1 46,31(.) 58,0(.) 45,31(.) 35,0(.) 24,31(.) 20,31(.) 24,(X.) 210(X) 3]8,(X)() --ions 2 2 2 2 2 2 2 2 2 2 2 2 2 Avcmgc(gpd) 839 721 871 1.033 1,4.4 1133 1,452 1,129 81.1 645 8(.1 677 Com-ial c.aaomp[i..(gAl-) .15,61(1 221,01X) 213,2(.) 245,7(X1 1 358,8(.1 368,7(.1 310,1(.1 431,81.1 317,4(X) 214,5(.1 222,2(X) 2(145(X) 3X)01,50(1 ConncRions 45 45 45 45 45 4fi 46 46 4fi 4fi 46 46 46 Avcmga(gpd) 6,632 7.621 6,- 8,19!1 115]4 12290 125.1 14,187 t0,5.1 6,119 7,4111 659] Gmc Consump[i0n(gallons) AvcWa (,d) - - - - - - - - - - - - - Irngffiion Conaomp-(,'l-) - - - - S,O(X) 2,111.1 4,0(X) 3,01.1 1,(1(.1 15,)0 ConncRions - - - - 1 1 1 2 1 1 -W(gpd) - - - - 161 67 129 17 33 TR (M Of lb.-Use I.I6 L(.X) 1(92.((X) 1,234,9(X) 15()5,5 2,28551X) 2,711,8(.1 2,982,71X) 2,304,6(.) 2,11],11.) 1,131,4(.) "4%8,9(.) 1,37]2(X1 22,2111.61(1 TI (m of lb.-COarectioas 339 }}y 1 3.1 335 1 }42 343 }43 }44 }42 }42 343 342 111 Avrsagc Dai(y-Of'1 Watu Usc 37,452 37.655 3%835 11,113 73,726 1(),313 96,216 74,342 70,5](1 62,561 49,%3 44,426 'IT�CU Wfficr USC 11,761,((X) 18,79$71.) 20621,8(X) 24,674,6(X1 38,229,1(XI 39,30$11.1 48,615,8(.1 37,624,6) 34,438,4(.1 23,212,3) 21,129,6(.) 20 815,2(X) 348,058,(X)() 'Total WfficrC-i-, 4,557 4,556 4,161 4,577 4,6111 4,621 4,626 4,631 4,641 4,629 4,613 4,6) 4,6)2 Avcmga Daily Wfficr U. 637,710 648,231 665,219 822,487 1,233,19] 1,31(129] 1,567,129 1,213,6%7 1,14],94] 749,752 73(1,96] 671,458 M-r(Cl'-ioa) 23,156,415 19,687,361 21,115,341 23,874,63() 3(1,870,2(11 44,135,664 56,032,422 43,883,748 34,286,617 25,6X),4]3 20,T 1,828 22,565,112 36i,-,812 Ls(matcd vvmcicmN rmdcrcd emtm'vac 5,226,088 Uascm-w-, 3,387,415 888,661 493,541 (1%1,970) (7,358,891) 5,6261. 7,426,622 6,259,148 (151183) 2,358,173 (1,157,772) 1,741,912 13,495,]23 %Uasm-Watt' IS% 5% 2% -3% 14% 13% 13% 14% (1% 1% fi% - 4% LUD(YUO9ervire Area) 6(18,1(() 6]1,(X.) 676,1(X) 8]8,2(.1 1,411251X) 2,3]4,1(X) 2,497,6(X) 1,31X5(.1 1,45%,3) 715,91.1 617,1(.1 881,4(.) 14,088 610 Avcmgc(gpd) 11.616 23,138 21,835 29,273 45,242 79,137 8()568 42,177 48,643 23,014 20571) 28,4(.) YI'Ya Ca.• 4y 0,6]3,4011 4311,281,3(X) 462,335,3) 450,981,21.1 446,693,4(X) 438,576,655 446,472,433 3fi().466,y(X) 345,544,433 2]6.}66,8(XI 329,178,657 353,2(X,4(.1 4,830,777,879 City Lake MC[cr° 511,05(1,500 449,75 LOU) 483,634,0(X) 476534,0(X) 486,325,0(X) 480,259,55 497515,833 399,399,0(X) 381.442.133 30(1,325,111.) 351,725,357 374,)33(.) 5,192,924,479 *Mill vsc ca 1-by,.k.c vg City maetcr.-raM LUD oscfivm City lake-,sarW, --"I'M Cily lake rrctcrc cncnccs nMw lass 4 oac csvlav iv IM-totalisr Min a'ascd."Totals-1-from avcm c6'I mathssrom ffic for I-tlays. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS Janl(1 Ir6111 Mar-Ill Apr'-10 Mny-Ill Jan-Ill Jal-Ill Anp Scp01 (bt-1(1 Nov-1(1 DcFlll 'falaF2(Illl IN-CITY Single family RCSidcnsisl Gnsamp[ian lgallans) 1(1,962,7(1(1 11,212,(.X1 13,1]1,2(X) 13,(176,6(X1 15,416,3(X) 18,492,3(M) 24,163,2(X1 22,69),%(X1 14,239,](X1 I(I,R14,lI1M1 12,221,3(X) 13,133,2(X) 1]9.596,10 Co-ioas 3,75% 3,759 3,%29 3,71 3,71 3,771, 3,772 3,772 3,770 3,774 3,775 3,774 3,- Avrsagc(gpd) 153.635 386,621 424.87] 415,%%] 497,31x1 616,4111 779,458 7323158 4]4,65] 18,839 4(1],377 423.652 MakiI.ulyR i-ial Coasom"i-(gal-) 1.707,4(10 1.715,41x1 2,()58,1(X1 1,%SK,7(xl 1,911,21.1 2,261,11.1 2.15,11.1 2,58],9(x1 2,053,(.X) 1,705.9(X) 1,91.6,(.x( 2,1138,8(X1 24,735.&X) ConncRians 123 123 123 123 123 123 123 124 124 124 124 124 123 Avcmgc(gpd) 55,077 59,152 66,3911 63,223 63,8]] 75,370 9(1181(1 %3,481 68,433 5511129 63,867 65,768 Com-i. -.pt-(,a-) 3,824,](X) 3,46].6(.) 4.-0,41X, 4231,21x1 4,1.69,3(X1 51(.(115(x1 5,%22.9(X1 6,630,7(X1 4,454,8(X1 3,9%21.x1 3,736 Ml 4,258,%(MI 54,(X19,(X.l Coaac-, 3111 311 312 312 313 313 314 315 316 315 316 316 314 Avrsagc(gpd) 123,3]] 119572 143,811 141,(14(1 134,494 168,017 187,835 213,894 148,493 128,452 124537 137,381 ('rcrvcrnnxnt Cansvmp[ion(gallons) 11X)91(1 %3(1,1(X1 1,038.6(XI 9(X),51 1.126,3(X) 1,592,1(X) 1.-6,71 1.916,71 1,15.6(x, ]48,2(X1 761,81X, 816,1(X1 13,288,1(, Conncaions Sfi Sfi 59 59 59 63 58 1 1 1 55 55 57 -Wc (,pd) 35,461 28,624 33,503 311217 3.6.332 53,070 45,- 61,829 34,853 24,135 25,393 26,326 Irrigffiion Caa .f ioa lgallans) 16,-l1 83,41.1 294,91.1 865,31.1 2,2111,3(X) 2,34],2(X1 5,633,4(X) 5,179,01.1 1.221),1(.1 760,1(X1 22],9(X) 1118,(1(X) CanncRions 14 22 29 39 53 54 1 76 52 39 21 I] 41 Avcsagc(gpd) 1}519 2,876 9513 28,843 ]1,(11(1 ]824(1 1%1,]23 167065 411,6](1 24519 759] 3,411 WMf-s (IT WOa3ca) Coreampu-(salloaa) 24].(.1(1 414,01X) 562,1.X, 5]311(X1 ]]311(X1 8131.X) 1,05%11(X1 91311(X1 6291.X1 .68111(X1 555,(IIXI 45$(1(X1 7.736111 Coaac-, 1 1 I 1 1 I 1 I I I 1 1 1 -Wc (gpd) 7,968 14,276 181,19 19,1(X, 24,935 2%11.1 34,129 29,452 20.967 21,968 1815(.1 14,]]4 'IbW 1-ily WaNr USC 1],89],51.1 1],7225(X) 21,58521X1 21549,3(X) 25,69,4(X) 30,&16,21X1 4(1.99,3(X) 39,921,1(X) 23,642,21X1 18,691,2(.) 19,418.1(.) 211,812,9(.) 298,411,91111 TI 1a-City WfficrC-i0w 4,262 42]2 4,353 4,31x1 4,318 4,324 4,339 4,342 4,317 4,3111 4292 4287 4,3(19 A4rWa Daily 1-ity-U. 5]],339 611,121 .6,297 718,3111 82],948 11120,207 1.319,332 1,287,777 ]8811]3 &12.942 64],270 671.311 WNSI OF CI1'YCLEN COVE smglc 1-lye idcaim (:maump[ioa(,al-) 899,4(.1 619,1 1,0%]2(X1 1,315,4(X1 1,019 Mx1 1,4119,7(x1 2,&IR,ft(xl 2,2%%1.x1 1,(3151 1,033,7(X1 9821,(X, 1,11491 15,-$700 Coaac-, 2% 297 299 }(MI 299 299 299 }(NI 3(NI 3(NI 3(X1 3(11 299 Avrsagc(gpd) 29,013 21,355 35,071 43,847 32,871 46,91 %4,155 73,8116 34,383 33,345 32,733 35,958 Mold beauty. i-ial Caasomp-(gall-1) 23,(X)(1 22,4,1 24311 2]311 2631(X) 32311 53311 4431(X1 2(13,1 29311 29,01X) 27,01M, 356(X)(1 --ioas 2 2 2 2 2 2 2 2 2 2 2 2 2 -W,(,pd) 742 759 71 9(Ml .39 11167 1,710 1,419 667 935 967 871 Comnrsrial Caaaamp[ioa(pAloaa) 214,1(1(1 47,0(X) 37 8,81X) 266(X1 1 2075(.) 183,21.1 -,6(X) 315,9(., 195,51&1 168,9(X) 1%2,(a)I 191,91 2,QOJXI(1 47 47 - - 47 - - 46 Avcsaga(gpd) 6,9(X5 1.621 12,219 1,553 6,694 6,107 .,(119 111,1911 6517 5,448 61167 6,1911 I-r.- Coasamp-(galloas) 15111X1 191.X, 111111X1 11111X1 14111&1 12111&1 191,1&( 9111X1 19111X1 21(11 15,(11 164,(X)(1 Coaac-, 4 4 1 1 1 4 1 4 4 4 4 4 3 A We (gpd) 517 613 333 355 467 381 613 3(M, 613 71 411 Irrigffiion Coasomp-(pplloas) 1,1x,(1 11111X) 11111X, 3,0(X) 1,()(X) 6,0(X) 6,0(.) 19,1.111 ConncRions 1 1 1 2 1 1 1 1 A4rWa (gpd) 32 33 32 y7 32 194 2(X1 TR (M Of lb.Wa u. 1.137,51X1 ](13,31X1 1,5(19,(1(X) 1.6411,0(.) 1,26451X1 1,63811.1 2,925,41.1 2,9711X1 1,256(1(X) 1,2 6,6(Ml 1,22(111(x) 1,34$6(x1 1%56],711(1 TI (M Of lb.Water C-iaas 349 349 1 34% 35(1 1 349 352 351 353 352 354 353 353 351 Avrsagc Dai(y-Of'1 Wasu Usc 36,.694 24,252 48,67] 54,667 411,711 54,63(1 94,368 %6,061 41,867 4(1535 40.667 43,503 'IT�CU Wfficr USC 19,1135,01X) 18,425,81.1 23,1X14,21.1 23,189,3(X) 26,9311,9(.) 32,215,11 43,%24,71 42,589,(1(.1 24,%98,2(X1 19,94],8(&1 20638,1(X) 22,1615(X) 316,919,1() 'Total WfficrC-i-, 4,611 4,621 4,](11 4,6511 4,667 4,676 4,6911 4,695 4,61 4,661 4,645 4,6.) 4,91 Avcmgc Daily Wfficr U. 614,032 635,372 ]44,9]4 772,977 -139 lj-,837 1,413,]1 1,3]3,%39 %29,9- .643,4]] 6 87,937 714,887 M-r(CI'-i-) 20,454,421 19,419512 21,994,121 22,8111,4(X) 30,475,931 311,135,903 49520,214 42,838,96) 28.132,1]9 24,329,18 23,194,239 211,812,(181 334,11.68,67() L,fi daamRCmdlo rmMrcd water use 6052,9.6% Uascm-Wfficr' 1419.421 993,712 (1,10(1,11]6) (38],9(X1) 3545,11 (2,2(19,191) 5,15514 249,9&1 3233,979 4,381,898 2556,139 (1,289,413) 11136,1111 %Uasm-w-, 7% 5% -5% -2% 12% -7% 12% 1% I1% 18% 11% b% 3% LUD(YUD9esvire Area) 62.6,824 626,821 8]6]1 %61,71.) 9511,299 1,2 6,842 2,116(1,64.6 1,302,12.6 123,4(X, .1 MM 724,1(X) 882,6(X1 11,161,(1.61 Avcmgc(gpd) 20,220 21.615 28,281 2 8,723 x,,655 42,561 66,472 42,0(. 4,113 27,3%] 24,13] 28,471 YI'Ya Ca.• 375525,107 426,1.68}76 41.(19,1(X) 438,4811X.1 471219.968 439,714,058 455138,654 454,9117,874 -],249,471 456,26],21X)1 --6,3 4-,7(18,9(X1 5,342536,(18(1 City Lake MC[cr° 395,186,931 44522111(.1 4%],781),1,1x1 -2532,111X1 499.6(11,16] 4]3,236,11(X) 1(1,924,111X1 49$799,111X1 492,2711171 477,14,111X1 471,3(18571 -6,7531(.) 1670676 741 *Mill vsccalwlffiN by sob[mcting Citymaetcr nxxcr aM LUD ascfinm City L�kcmc[rsavrsagc ""I'MC'.i lake nexerex enenecs riMic lass of owe esalan ins.mercy sotalisr Min aased."I'srcal.s caknlfficd from avem e6'I rradin srom ffic for loa tleas. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS Jamll Irhll Mar-11 Apr-11 May-11 Jun-11 Jal-11 1911 1c0 (kt-11 Nov-11 Ucc-11 'I'a Ia ,II IN-CITY Sinslc family OCSidcntisl Gnavmp[iOn�sllOns) 1(1,684,](1(1 11,)7,3(X) 12,318,6(X) 10,979,5(-) 14,167,0(X) IR,93I,lll-1 18,380,0(.) 25,208,0(-) 18,)6,0(-) 11,262,111X1 11,284,0(X) 12,3351)(X) 175,113,1(1() Co-ions 3,776 3,779 3,78() 3,783 3,781 3,785 3,787 3,789 3,7) 3,7) 3,789 3,789 3,785 Avciasc(gpd) 344,668 381,286 39],3]4 365.983 45]3)(X) 631.33 592.913 813,161 616,861 363,2) 376.133 397,903 MvkiI.ulyR i-ial Covsvmptiov(Sal-) 1,732)() 1,72(1,8(.1 1,908,1(X) 1,614,9(.1 2,095,3(.1 2,082,2(X) 1,953,11-1 2,728.9(X) 1,170,61.1 1,701,(X.) 1,746,((X) 1,832,(XX) 23,285,5(X1 GnncRiOns 124 124 124 124 121 125 125 125 125 125 IZ5 125 125 Avcrosc(Spd) 5518) 5%338 61.552 53,83() 65) 69,4(1] 63,013 881029 72,353 54,871 582(X) 59319] Comnr�aia( -.,t-(,a-) 3,4252(X) 3,723.6(x) 4.169,6(X) 4,041,3(X) 4,6165(X) 4,806,3(X) 5,11843)(X) 6,610,8(X1 5,0571(X) 3,]69,](X) 3,809,1(.) 3,93].6) 53,15(),](X1 Coaac-, 315 315 315 316 316 317 317 317 318 318 317 31] 31] AvcmBc(,,d) 113,716 -,x) 134,513 134,]1(1 148,919 160,21(1 16401-1 213,252 168567 121,603 126,9]() 12],(119 Gmcrnnxnt COV .f iov(,.R vs) 998,4(1(1 ]21,8(X) 8(12,1(x) 1,0]2,0(X) 847,4(X) 1,1.2,9(X) 1227,0(X) 1,803,0(X) 1364,0(X) 699,()(X) 649,()(X) 862,0(.) 12,138,&X1 Covvcaiovs 55 55 55 55 55 55 56 56 55 55 55 55 55 -Wc (Spd) 32,A. 24,8911 25,8]4 35,733 2].335 36,4311 39,58, 58,161 45,467 22,548 21.633 27X06 Irrisffiion COnxump[ion(pall0na) 86,10() 78,91x) 95,21.1 181,2(X1 .62,6(X1 3,284,6(X1 3,6]5,0(X) 5,]2$0(-1 3394,0(M) 572,01-1 188,()(x) 139,()(X) IR,2911,)(1 COaaCR1011F 14 11 16 26 44 6) 72 76 74 39 Zll 16 39 -Mc (Spd) 2,777 2,721 3,1171 6,24() 27,826 0)9,48] 118548 184,]]4 113,133 1$452 6,267 4,481 Wbof-s (I T w-) c.reompu-(san-) 38]1.X) 434,1)(X( 565,0(-) 5493X3 6153X3 8)SX-) ,,05(10(. 8991(-) ]510(. 6603113 61],0(X) 62],(1(X) 7,965,(X)(1 Coaac-, I 1 I I I I 1 1 1 1 I I 1 -Wc (gpd) 12,481 14,966 18,226 18,3(.) 19,839 26,767 33,8]1 29,01.1 25,3(.1 21,290 2(156] 2()226 'IbC(1-ily WaNr Uac 1],414,0(X) 1],]36,4(X) 19.85$61X1 18,443,9(X) 23,203,8(. 31,(.1(1,111-1 31369,1(. 42,9]],](X) 31,250,6(X) 18,663,7(X) 18,293.1(X) 19,732,6(X) 289,943,5(1(1 TI 1DeityWfficrc-i- 4,285 4289 4,291 4,305 4,321 4,343 4,358 4,364 4,363 4,328 4,3(2 4,303 4,321 Au W Daily 1-ity-U. 561,742 611,61. 640,6(U 614,]91 ]48510 1.33,333 11111.906 1386,- 11)1,68] 62,055 &19,]]0 636535 WNSI OF C11'YCLEN COVE Si,lc1-ly(evidential Covsumpti0v(,a-) 8R$&x) 937,81x1 1,103.3(X1 932,2(X) 1,2631(X) 132411(.1 1,]4811(.1 2,43511(.1 158211(.1 952111X1 9881X.1 1,(IR]1X-1 15,20(1,91X) Connc-, 31X1 31X1 31X1 30, 3(2 301 301 301 3(2 293 3(2 3(2 3(111 AvcmBc(gpd) 2].3]4 32,338 35,591 31,073 4(),742 44,133 56,387 78548 52,733 311,]1(1 32,933 35,(K Mold lanuty R idcntim COnavmption(9ml-1) 181(.() 221)(X) 223)(X) 213)(X) 221)(X) 203)(X) 26O(X) 63,0(. 273)(X) I6O(X) 21013 22,0(X) 3(3,(X)(1 --i- 2 2 2 2 2 2 2 2 2 2 2 2 2 -W,(Spd) 581 759 710 8181 701 667 .39 2.032 9(-) 516 ]1X) 71() Commcirial Coaaomp[ion(pAl-) -,- 16115(.) 195,41.1 17951.1 1 23(1,(1(-1 1855181 175,01-1 2285181 169,4(X) 188,(1(81 1395(X) 136,0(X) 2,145,7(1(1 ConncRio.. 47 47 47 47 4fi 4fi 4fi 46 4fi 55 46 46 47 -Mc (Spd) 5111() 5534 6}(3 5,983 7,419 6,183 5,645 7,371 5,647 6,()65 4,651) 4.38] Government c.-p-('11-) 14,1.X1 1011)(-1 16,1)(.) 121X.) 151X.1 131X.1 131X.1 I6.(1(XI 171X.) 111X.1 I ((X) 17,((X) 165(MO Connc-, 4 4 4 4 2 4 4 4 4 4 4 4 4 A We (,d) 452 345 516 4(-) 4&1 433 419 516 567 355 367 548 IrnBffiion Conaom.-(,'lops) 1,(.)() 1,01.1 1,111-1 111(-1 4,1.11) ConncRions 1 - 1 - 1 - - - - - - 1 (1 -W(Gpd) 32 _ 32 _ 32 32 TR (M Of'I'own-Use 1,(W(I,INNI 1,13(1,31.1 1,337,7(X) 1,147,7(X) 1531,0(.) 1,54251X1 1,962,01.1 2,7425(X) 1,795,41.1 1 1,167,0(.) 1,159,5(.) 1,2631(X) 17,818.&I0 TI (M Of'I'Own-COnreffii. 354 353 }54 354 353 353 353 353 354 354 354 355 354 Avciasc Dai(y-Of'1 Watu Usc 33548 38,976 43,152 38,251 49,387 51,417 63,290 88,468 59,847 37,645 386511 'IT�CU Wfficr USC 18,454,O(.l 18,866,71.) 21,196,31X) 19591,6(.) 24,7348(X) 32,5425(X) 33,331,1(X) 45,720,AM 33,1W6,O(X) 19,8311,7(X1 19,452,6(X) 211,995,6(X) 301,]62,100 'I'ota,WfficrC-i-, 4,639 4,642 4,645 4,659 4,674 4,6% 4,711 4,717 4,717 4,682 4,661 4,658 4,675 AvcMs Daily Wfficr U. 5952911 650,576 683,752 643,053 ]91,89] 1,1184,]5(1 1,015119] 1,474,845 1,101533 639,](X) 648,420 61],27] M-r(Cl'-ion) 21,1129,939 18,623,320 20,863,265 20,497,361 23,836,1() 30,856,719 39,865,638 46,]27,961 39,213,813 25,938,370 19,769,383 19,]93,195 32],015,06] Lfim vnmfficmd/o r 1 1 3,637,571 Unarm-w-, 2575,939 (2133.) 0334035) 9()5.]61 (898,6%) (1,685.]81) 6 534 538 1,(X)].]61 6,167,813 6,10],6]() 316,783 (1,2112,405) 15615,395 %Unsmvntcd Watt' 12% -1% -2% 4% -4% 1% 16% 2% 16% 24% 2% 6% 5% LUX)(YUD9ervire Area) 6(2,)() 616,4(X) 656,7(X) 647,8(X) 926,0(.) 1,223,7(X) 1,432,4(X) 2,197,6(.) 1,381.6(.) 652,3) 749,5(.) 882,6(X) 111969150() Avcrosc(Spd) 19,448 21,255 21,1)1 21,593 29,871 4(1,79) 46,206 7(),89) 46,053 2111)2 24,983 28,471 YI'Ya Ca.• 461.6415011 392,461,91X) 451,388,721 426,442,6(X) 450,439,2(X) 418.789,8(X) 479,286,016 431,963,4) 458,491,289 447,8901(-) 430,368,934 456,761,8(X) 5,3(5,925,254 City Lake MC[cr° 48(1,698,40() 411.945,0(X) 4]3,211,721 446.682,0(X) 476,1(X),0(X) 452,556,0(X) 514,()9516 479,881290 492,918,889 46$373,0(X) 450,511134 478,64(1 OR) 5,62506,854 *Mill vsc ca 1-bysvblmc,City maetcr nrxcr and LUD avcft.City lake mclG'srxmpe ""I'he C'.i lake rrcter ex enenecs riMic lass of owe esvlan in the mercrtotalisr Min cased."I'oml.s caknlfficd from avem c6'I reMin srom ffic for loa tlavr. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS 1an12 Ir612 Mar-12 Apr-12 May-12 Jvn-12 Jvl-12 Avg-12 Scp12 (bt-12 Nov-12 DcF 12 'fvlaF-2 IN-CITY Single family RCSidcntisl Gnsomp[ion(gallons) 1(1,]82,15(1 I(1,9I19,(NNI 12,1(18,(1(81 10,78(1,0(.) 16115410(-) 14,%6(),(1(-) I-,ZI LO(-) 24,648,(1(.1 1],581,0(.1 13,0840(-) 11,656131 11,551.1(x) 192,324,111 Cv-iovs 3,793 3,795 3,78] 3,79] 3,71 3,794 3,]98 3,822 3,81 3,818 3,81 3,- 3,13 Avciagc(gpd) 14],8(5 376,172 39(),581 359,333 521.19] 495,333 581,452 ]95.19] 586033 422.165 388,543 312.613 MvkiI.ulyR idcvtial Cvvsvmptiov(ga1-) 1,16,1X1(1 1.18,(8X1 1,8(13,1)1 1513,(.X1 2,(188,(.-1 1,9117,(.-1 2,149...1 2,543,(.-1 2,154,(..1 L9411(.M1 "818,0(X1 1,854..X1 22,984,(..1 ConncRians 125 125 125 125 126 126 126 126 126 12] 12] 126 126 Avcmgc(gpd) 53,(19] 57,517 58,161 5(1,133 67,355 1.567 69,323 82,1132 68,815 62581 611,6(.) 59,815 Cvmmcmial Covsomptivv(,al-) 3,14,1-81 3,81115(X1 3,954,415 3,554,315 5.136,6(X) 4,889,7(.1 5544,1(.1 6,052,31X1 55]1,8(.1 3,916,4(X) 3,6]45(-) 4.186,3(X) 53.(85,11.1 Cvvvc-, 317 317 315 315 316 316 315 314 314 313 313 313 315 Avcmgc(gpd) 116,258 131,4(.) 127,561 118,477 162,471 162,9591 178,842 195,235 185,727 126,335 122,4X1 131,816 Gmcrnnxnt Caysvmp[iov(gallovF) 672,(5(1 6](1,()1 758..X1 774,0(X) 928,0(X) 848,()(x) 912,0(X) 1,186,0(X) 92(1,()(x) 798,0(X) 708,01.) 634,01.1 Cvvvcai-, 55 55 55 55 55 55 55 58 55 56 56 56 56 -Wc (gpd) 21,691 23,103 24A52 25,8181 29.935 28267 29,419 38258 311,667 25,742 2351 20,452 Irngffiion Caysomp[iov(gallons) 65,1511 311,015 217,01.1 33,01.1 1,621,01.1 2,028,01.1 3,623,0(X) 4,766,(1(X) 3,474(1(X) 1,216,01.1 977,(1(X) 112,1115 18,162,(5(1 COaaCR1011F I3 9 15 13 4fi 41 65 51 68 47 19 13 33 Avcmgv(gpd) 2,(191 1.114 7,0(X) 1,1(X) 52,29!1 676(.) 116,871 153.742 115,8(X1 39,226 32567 3,613 WMf-s (IT w-) Cvrevmp[ivv(gan-) 526.1.11 16,1)(-1 ]6(1,01.) 51115181 7235181 735U(M1 1.1435(-1 1.124..81 ]3]5181 446U(M1 51,(1(X1 333,(1(X1 8127,(5(1 Cvvvc-, I 1 I 1 1 1 1 1 1 1 1 I 1 -Wc (gpd) 16,968 24.881 24,516 16,715 23323 2451U 36- 36258 24567 14,3X1 16,767 10,742 'IbC11-ily WaNr USC 17,295,01X1 17,783,6(X) 19.10,4(.1 17,146,3(.) 2655(1,1!) 25,26],70!) 31.582,1(X) 4(1.319,30!) 30,34],8(5 21,4(1(1,4(81 19,336,9(X) I8,170,3(MI 2ffi,211(1,4(Ill TI 1v-City WaterC-i- 4}114 4.3112 4298 4,3(5 4,314 4,333 4,31 4,392 4,373 4,362 4,322 4,316 4,332 A Wz Daily 1-ity-U. 557,5-5 613,228 632271 571,543 856,471 812,251 1.(11 ft,777 1,3011,623 1.1111593 6911,335 .4,163 599.142 WNSI ON C11'YCLEN COVE Sivglc family R idcvasl Consumption(gallons) 886,(X-1 1,268,01-) 856.85 9135(X1 1,4885(X1 1.2455(X1 155(151X1 1,86(15(X1 1,4965(X1 T125(XI 9381.-1 1,1(14(.-) K321,0181 COnnC-, 297 312 312 3(2 3Q3 3Q3 305 3(11 3(11 291 31 31 3(2 Avcmgc(gpd) 2],291) 43,]28 27,613 30,133 48,01.1 41,5(MI 5(110(MI 6110(M) 41,867 24,903 31,267 35,613 Mvki lanuty R idcvtial Cansvmption(9all-1) I(1,(5(1 12.15 1(1,(1(X1 8.51) 13,0(!) 28,0(!) 44.5!1 38.1-1 28.5!1 2(1.5!1 24,01-) 27,0(-) 262,(5() --ions 2 2 2 2 2 2 2 2 2 2 2 2 2 Avcmgc(gpd) 323 414 323 267 419 933 1,419 1226 933 645 8(X1 871 CommcmiA Covsomp[ivv(gAlovs) 118,5(81 138,01.) 15115(81 11,(1(81 186,(11.1 1365(MI 156,01.1 213,0(.) 2285(MI 107,01.1 1375(X) 138,(1(X) 1,814,511(1 --i... 46 46 46 4fi 4fi 4fi 47 46 4fi 4fi 46 46 46 Avcmgu(gpd) 3,823 4,759 4,855 351 6,0(X1 455(1 5,052 6,871 7,617 3,452 4,583 4,452 Government Consumptivn(gallons) 8.1-111 21,()(U I1,()(-) 14.1.1 14.1.1 12U(M1 15U(MI 14.0(.) 14.1.1 1115(81 13,(1(X1 91(1(X1 1551(5(1 c.-ions 4 4 4 4 4 4 4 4 4 4 4 4 4 A We (gpd) 258 724 355 467 452 41.1 4. 452 467 323 433 2911 Irngffiion Con ,kion(v.11 s) L(X)(I I.IIMI I O(X) 11,0(X) 165,1115 13,1115 3(1,0(X) 72,0(X) 16,0(X) 1.1(MI 479 MO -.-ions 1 1 1 14 13 3 2 3 3 1 4 -Wa (gpd) 32 14 367 5,452 55(X1 1 419 968 I 2,4(X) 516 33 TR (M Of lb.-Usv 983,5(1(1 1.44(111181 1,(275(X) 11142,111-1 1,8111,111-1 158651-1 L918,(I(-1 2,155,(1(X1 1,8385(X1 925,11(.) 1,1135(X) 1,2]8.1(X) 1].3],5(1(1 TR (M Vlb.-Canreffiivns 35(1 355 354 355 31 368 361 355 356 346 359 358 35] Avciagc Dai(y-Of'1 Watu Usc 31,726 4%655 33,145 14,733 61,323 52,883 57,355 1,516 61,283 29,839 3].117 41,226 'IT�CU Water USC 18,2]85(81 19,223,6(X) 20627,91X1 IR,I88,3(NI 28,420 6(X) 26,354,21X1 33,36111(81 42,474,31X1 32,186,31X1 22,325,4(-1 211,4511,400 19,8!8,3(X) 302,23],911(1 'fora(Wfficr CVVrccti-, 4,654 4,657 4.652 4,661 4,703 4,701 4,721 4,727 4,]29 4,708 4,681 4,674 4,689 Avcmgu Daily Wfficr U. 589,629 662,883 665,416 61,277 9161. -5114(1 1,M16,132 1,370,139 L(M12,877 720,174 681,680 64(1,268 M-r(Cl'-ion) 19,317,192 17,]6],618 1 20,124,472 20,441,803 27,453,989 27582,061 355211,398 45,135,664 411,445,882 ZR,113,464 21,732,047 22,491543 326,126,132 L,fi dvnmctcmd/ rmdcrcd vmtm'vsc 3,036,771 Unacmnn2d WffiG' 78.12 (455,982) (5(13428) 2253513 (966,611) 72],861 2,1611298 2.661,364 8.259582 5,]88,(164 1,28 I,fi47 2,643243 2(Iffi1,4fi1 %Unsmvnhd Watm' 5% at% -3% 11% 4% 3% 6% 6% 211% 21% 6% 12% 6% LUD(YUD9ervire Area) 682,2(10 7(11,6(X1 668,70) 869,9(.) 1.1811,11-1 1,MI6,41.1 1,413,11(.) 2,1.05(.1 1,753,3(-) 771,9(-1 811,6(.1 983,6(.1 12,852,8(1(1 Avcmgc(gpd) 22.)(5 24,193 21,571 28,99] 34,842 35,88() 45581 65,823 58,443 24,915 2].)53 31,729 YI'Ya Co.- 463,955,162 4215()9,13 4211198,4(-) 431,256,51-1 448.145,-) 428,92(1,4(X) 439,998,314 4(12,12(1,392 436,797,7115 353,313,459 318,613.172 35(1,369,85(1 4,915,928,7117 City Lakc MC[cr° 4821915,562 11.434.193 441,495,111X1 450,315,0(X) 477.646,0(X) 456,85"0(X) 4]4,771,414 446,635,172 470.737.385 3]6,94(1,759 339,8]5.172 3]1,2(11,75(1 5,23(1,519,-17 *Mill vsccalwlffiN by svb[mc0ng Citymaetcr nrxcr aM LUD ascfivm City lxkcmc[Gsa2mgc ""I'MC'.i lake rrctcrcx cncnccs nMic lays of ouc csvl0n intM mcrcr totalisr Min aa�cd."Totals cslcvlfficd from avcm c6'I rcadin srom ffic for loo data. APPENDIX B WATER USE RECORDS 2004 TO 2013 CRY OF PORT TOWNSEND WATER SERVICE AREAS Jam13 lv"3 Marl} Apr'-13 May 13 Jun-3 JuF 13 Aug 13 Scp13 (ICt-13 Nav-13 -13 'Ibtal-2(11J IN-CITY Single 1.n kyl idcntiA Consumpti-(gal-) 6,594,(X)(1 9,813,0(.) 11,191,(1(.1 13,2112,(1(X1 15,944,(1(X1 1.8,739,(1(X1 25,27101(.) 21,994011.) 11191191()(.) 13,160,01.1 1(1,645,(1(.1 13,(1550(.) 116947,(..) Connccion., 3,801 3,%17 3,819 3,822 3,822 3,819 3.%21 3,828 3.%29 3.828 3,829 3.81 3,%23 Ago (gpd) 3]4.1(X1 339,414 373906 44(1,(161 514.323 624.633 %15,194 7(19,481 396,961 424,516 354,833 421,129 Muki Uanulyl idcntisl Gn,vmp[ion(gallon,) 1816,000 1,112,(1(X1 1819,0(.) 1,99(1.1(X1 2,(152,0(X) 2,1010(.1 2,36].1(X1 2.8(X1,01.1 IS%1,(1(X1 2,2(x1,()1.1 1.]61,(1(X1 2,164.11X1 23,793,(XX) Conn--1 126 126 126 126 126 126 126 126 126 126 126 127 126 Avcmgc(gpd) 581581 52,138 59.645 66,333 66,194 ](1163 76355 ]],419 52,](X1 711,968 58,](X1 69,8(16 --isl Gn-f ion(gallon,) 4,(161,(X)(1 3,236,()(X) 4,3()8,31X1 4,5]2.11X1 4,]311,81X) 5,28251X) 6,52].1(.1 6,193,31X) 4,272,4(.) 4.X1%%1 3,493,31X) 4,(.9,4(X1 55335,](1(1 Conn-ions 313 313 313 313 313 313 314 314 314 315 314 313 314 Avcmgc(gpd) 131,1X.1 111,5%6 138,9]] 152,416 152,6116 176,1183 21(1,552 199,].! 142,413 148,694 116,443 13(1,626 Govcrnnxnt Con,umptian(gtli-) 8111x)() 563,(1(.)1 717,0(.) 814,(1(.)1 863,0(.) 1,(113,0(.) 1,2(12111.1 1092,01.)1 7114,111X1 I X6,0(.) X)3,11(.1 1 ]](1,11(X1 9,985,(X)(1 Connccion., 56 57 56 56 56 56 56 56 56 56 56 56 56 Av wi (gpd) 27,129 19,414 23,129 27,133 27,839 33,767 38374 35,226 23,467 25,916 2(),I(.) 24,839 (rogation Consumption(gallon,) 711,(X)11 63,1X.1 133,1X.1 574,1X.1 2,(153,1X.1 4,3](1,(X.) 6,598,0(X) 5,251,(X.1 1545,(.X) 66],(.X) 87,(X.) 7(1,(X.) 21,481,(.x1 Connecion., 18 15 211 38 X) 68 77 74 51 33 14 M 4() nvGagc(gpa) 2258 2,172 4291) 19,133 66,226 145.667 212.839 169,381 515(.) 21616 29(.) 2,258 WMIc,e1c(I k WOrdcn) Coummp-(gallon,) 449.X)1) 722.11.) 61],(1(X) 540,(1(.1 6811,(1(.1 %60,01.1 1,401,0(.) 1 013,(11X1 ]49111X1 %99111X1 5571(.) 8581(.) 9385,(X)(1 C(InnCRI(In, 1 1 1 1 1 1 1 1 1 1 1 1 1 Avcmgc(gpd) 14,4.! 24,897 l%103 1.801(X1 21935 28667 45,194 33968 24967 29,(1(.) 18567 2],6]7 'total In-City-USC 18,831,1)(X) 15,939.1(X) 19,2153(X) 21,692,1(X) 26,322.8(X) 32,365,5(X) 43,366,1(X) 37,9833(.) 2(1,7611,41X) 22,3385(.) 17,1463(.) 20,%6A(X) 296926,700 'I'oL 1-ity-Connection, 4,321 4.329 4.335 4.356 4.378 4.383 1 4,395 4,399 4,377 4,359 4,34(1 4,347 4.360 A We Ortily 1-ity Water USC 6117,452 549,621 619,848 723.)]0 .19,123 1,078,8511 13989116 1,225268 692,013 72(1,197 571543 676,335 W MSI OF C11'YCLUN COVE Single l-lly XC,idcn0al --ption(gallon,) 916,0(X) 854.11X1 815,(11X1 1128,0(X) 1,317,(11X1 1,.13,(11X1 435$(1(.) 1.]18.1(X) 863,111.1 1,(191,111.1 871,0(.1 1,172,0(.) 14952.1X)11 --i- 3(16 3(6 3(6 3(6 3(6 3(17 3117 316 316 316 3112 316 3(6 Avcmgc(gpd) 291097 2%448 28,226 3],6(.) 42,4.1 60,1(.1 76,1)65 55,419 28,]6] 35,194 2%1133 37,8116 Muki family. i-im c.-ption(gaiana) 211,(X)(1 17,(1(X1 17,(1(.1 23,0(.) 23,0(.) 19,(1(.1 120(.) I10N.) 50X.) 8,01X) 7,(Mm 6 0(Xl 168,(.)() Connccion, 2 2 2 2 2 2 2 2 2 2 2 2 2 Avcmgc(gpd) 645 585 548 767 742 633 387 355 167 258 233 194 COmmcmisl Conaumptian(gallons) 154500 129,01.1 16],(X.1 2245(.) 2()6,1..) 182,(..) 31431.) 217,(1(.1 163.11.) 15(1,(x.) 51("(x.1 285,(X.1 2,702,31X) ConnM-1 46 46 46 46 46 46 46 46 46 46 46 46 46 AvGagc Npd) 491. 4,448 5381 7,483 6645 6067 10139 7,(X11 5,433 4,839 1]3..1 9,194 (:ovcrnmcnt Coummption('a-) 16.1.X) 12.11.) 13,(1(X) 18,(1(.) 12,(1(X) 13,(1(.1 171X.) 14 01M 101X.) 171X.) 1(101.) 1911(.) 171,(X)(1 Connecion, 4 4 4 4 4 4 4 4 4 4 4 4 4 Avcmgc(gpd) 516 414 419 6(X) 387 433 548 452 333 548 333 613 Irn,.ian Consumption(gallon,) 1111(X) 140(X) 73,()(X) 125,0(X) 1611,0(.) 81(1(X) 100)(.) 2,(1(X) 391,(X)() Co -ions 1 2 3 2 2 2 1 2 1 Avcmgc(gpd) 34 387 2,433 4.032 5,161 267 323 65 To)al6v[of'll-W-r Urc 1,(92,5(.1 1,1113,(1(NI 1,1)72,(1(.1 1,3935(.1 1,5)ll,(1(NI 2,09(1,0(X) 2,82631.1 2.1211,(1(.1 1,(.9111.1 1,2]6111.1 1,398,0(.) 1,48411(.) 18384,3(X) 'I'o0il(M Ofll--Gnrcati0ns 358 355 354 354 356 362 361 356 356 355 354 356 356 -Wc D.0y-f -Water USC 35.242 34931 34581 46,45() 50,645 69,667 91,1]1 68,381 34967 41,161 46,61X) 4],8]1 'I'oN W-r USC 19,9235(.) 16952,(X.) 20 2873(.) 23,085,6(.) 2],892,8(.) 34,4555(.) 46 1924(X) 40,103 M) 21,%09,4(.) 23,6145(.) 18,5443(.) 22,450,4(.) 315311,(.X) 'Total W-CrInlMFtl(In, 4,679 4,6.1 4,6%9 4,710 4,734 4,745 4,756 4,755 4,733 4,714 4,694 4,]16 4,716 A We Daity W-r USC 642.694 584552 654,429 769520 899,768 1,148517 1,490,077 1,293,655 7269.1 761,758 618,143 724,2(16 MRU'(C'I'-ian) 22544,691 20,017,453 22,64],]44 23,279,869 293(15,015 37,339924 53,561,846 44,955,519 311,1156,633 24,190,638 22,950,897 23,465,242 354315,471 U,ti-onnMGCd/othcr mdcrcd water¢,c 5,(12956] Unacmun[M Water 2.621,191 31)65,453 2,360444 194269 -,M 2,884,421 ]369,446 4,852,219 $247,233 5]6.138 4,4(1659] 11114,842 33974,5.15 %Unacmun[cd Water 12% 15% 1(1'X; 1% 5% %% LUU(-,%wire Area) 9115,%()() 621,6(X) 9(1.8,((X1 1,11)1,8(X1 99118(X) 1,654,6(.) 2,42115(.) 2,261,2(X) 641011.1 899181.1 715,81.1 816,7(.) 13968,](1() AvGagc(gpd) 29,219 22,2(X) 29,294 36,]2] 31994 55,153 78,081 72,942 21367 29,026 23861 27313 YI'Yaper Crns 4(15,1.3.6(X1 466,2155(X) 445,9932(X) 461477,6(X) 451,22119(X) 4]6,2]6,1(.) 477,9803(.) 388,988.8(.) 414,5449(.) 394,18391X) 366,8329(.) 4,]49557,](.) City LM.c MC[cr° 423,417,2(X) 487,4109(.) 4](1,180.6(X) 49(1,3622(.) 487,3 310(X) 524,889,0(X) 520344,8(X) 411.43921.1 439,059,2(X) 413,444,0(X) 390 13(1,0(X) 51158,(.)8,loo *Mill usccalcolaM bys.k.a ng Citynu,tu meta-LUU¢,cfinm City Lakc rrctm a W, --The Ci lake mxercx en- nMw loss of p.r m,oltin in the coder totalizer kin aasN.'I'oW,rak 1l fi,.,-,delly rradin,mm ac for lost data. Appendix C Figures 3-1 through 3-7 from the 2008 Water System Plan This Page Intentionally Left Blank _ m �Ell Ell❑ ❑m❑ ❑®®® ❑❑°O❑°❑ , ��� ❑❑a❑®❑❑®❑ J� emmmm®❑® E9 El EL100 ®❑❑❑❑❑®❑® s;� �s ®❑❑❑®m®R®❑ - DE -im ooE. SANS, �asr E .N S. §r 88E eeFMST 1NSS, � � ��gz ♦ I p 2211 IT 5 MG• 11 11—IT 1 MG J — w C 11 T SrPS� ,z.IT IT SoNNr��NOF«RO � � Z i LNPINES. III IT Legend Pipe Diameter ERo r a4in &� 6in-8 in „S o >10in Transmission Pipeline SRO I ♦ PRV Pump Station • Storage Reservoir High Zone Morgan Hill Zone Future High Zone K Low Zone S oFS rS SENORO City Limits FIGURE 3-1 90RT N EXISTING DISTRIBUTION a 0 1,500 3,000 4,500 6,000 SYSTEM MAP _ _ _ _ Feet City of Port Townsend Water System Plana 1 inch equals 3,000 feet This page left blank intentionally. •�'3i • •i• UjUjdj � �•� �� _ • ,.rR sr�Mw,Nav • • 3v°,oE�RO •�"�„o�oi � � • • • s"„Efts, �'�/ ® ® Bmmmm®[ �i� +Y� �� !� • i'�� • ®® ❑®®®®❑C® ®❑❑❑❑❑®G •N•� ®❑❑❑tE®®®.�L • s•p 38 Nj•°�s� ! • • • w s, 3.TGT • • •°��° •• • F� r r� i r j a,R3, • � � �• • • pi • 1 •�— oT 0R TWTOO ••� n> • ••� j •• •• • y3,•�• • • � �• �° 3 • ••• 'i�� • � � • �` 1 0„� • •iaTOPti•• • � �6. i7V7 - •• •_ ° S� 1 - ••••�••� • = j • •• • • ••mss•• • • £� •� ! • T' • • j • TV =• �• 1-1–R, • r� L • • •• a • • �• •�i• i•3R°i��• e•s ,•`, n.RCAnin.wFS. • �• • °E°R°EROMEO„"."�•i • Legend Pressure • vs. w <30psi 30-50 psi °o°",RR°°ER° • • • `Rii�"ssi • • ew j • 50-80 psi N • 80-100 psi • • >100 psi High Zone sE,a"RO Morgan Hill Zone Future High Zone o Low Zone Cityl-imits oLof°Rrr°n 1IRO Water Pipes N FIGURE 3-2 901T mw EXISTING SYSTEM = o PRESSURE AT 2005 PHD = = _ 1,5 00 3,000 4,5 00 6,000 y�_r s o Feet Q�NIN■�C1 1 inch equals 3,000 feet City of Port Townsend Water System Plan This page left blank intentionally. • ••YTW O • •i�T�i F h Alf • To •• • oi i o •• • ETR w mmm ®[ P Bm ob, 0 ❑®®®®❑L s o 011ie., • ® �®❑❑❑❑❑®G� •N• • • ��� X09 1 ® • ❑❑ o z • �� m 1® • �� •: � • eel �sT AI. • 000 M �* ®E • • Y���° • ��t _ • •• •• • • 21T.T 30 0*04 • • g�M 'o s • $�T T EoP n> • •��• -Vo 00 1 RAE ••• •• � ••i i igs •i�� ••� •• • •:• M • � � 1 • •!• •'�i1 • %6 1 �•s� •�P i -••• • •• � �• - ••••=Nib • PT 0 j • i mil• 00 o,�,�RwAT • •4• • 4400 • —FILL so* ' Sr� � ••e 0 Po` • �" C. �R is • yF 001 1 �oAs, s a . �E EoRR�MER„RNA 10 • SRO Legend Pressure • = s ,.�^ <30 psi Ra, kkoc�RO • • • FR*,R'c,FS 30-50 psi • 0 • 50-80 psi • -' • 80-100 psi ff • >100 psi sFTORRO High Zone Morgan Hill Zone Future High Zone o Low Zone ono FORTT0 N RORo Cityl-imits Water Pipes No —EAR x N FIGURE 3-3 fQORT mw EXISTING SYSTEM = o PRESSURE AT 2025 PHD = _° ° 1,500 3,000 4,500 6,000 r mmR Feet City of Port Townsend Water System Plan DIC yyASN■�' 1 inch equals 3,000 feet This page left blank intentionally. 6£Oo£ , _ 6 6'fRO STS ' CsAFrNCE 9T r _] 515 q,�} • Tx IT s? Y � T�; • �T�sT� •• a < DOE 47TI 4?M—TVA°• • -.°ER Al. R ° ❑❑❑ T�uJ ❑®®®®❑❑❑❑ • w ]] ❑❑8❑m❑❑ 3 •� IE � ®®®®�❑❑ 3 �1s ��..i:: ®❑❑❑❑❑®❑® ®❑❑❑®®®®®❑ • El UE-100 eM�T°sT BB��i QTR 9• R sT sT ego � p w eel o m •• • tiP° ° -HT T !— •• •• �� 0 4°ti�� 'mss n� w L , �TRS " a • N•'• �6s s - .,&T,R.AV Al • ti6s £� • o HHS A �g s. , w ETERI rii�T•• "<n ETERVIm s s gF to 'a a ° z?rvo AT m naY • rsTn s - obi eT� c`Aµa • "� • �' � 2 n �6t ge�gt IA—T s 11,T-T aTrR Sr � JTIIT Np �➢�' 11T-T� a aonnreu w„v a I—AT s C—TY�woF UR R sm s, CR V CR ' ME� sT EST • 3RRRT o �E EoRRO MERTERRANEANA Ro Legend ARRD,11 ory a v eus TE Available Fire Flow a k s • 500 gpm ERE E kRRT 500-1000 gpm En sT • 1000-1500 gpm } • 1500-2500 gpm • >2500 gpm High Zone 5 SET-R. • Morgan Hill Zone Future High Zone Low Zone IIII'm Cityl-imits o�oFOR?rowNSEN°R° -Model pipes —TER ll FIGURE 3-4 ART N AVAILABLE FIRE FLOW at 2025 a° MDD in EXISTING SYSTEM 1,500 3,000 4,500 6,000 = Feet City of Port Townsend Water System Plan Of2 � 1 inch equals 3,000 feet This page left blank intentionally. EPU,E�,aR 5TH 18 I--IT 17 �y 0 —IT 13- T. —'S IT 12 LJ L --T 16 ❑❑E DOE U]U]LH 10pliffiff1p]❑OOF ElElffEl[--[][]F- IITTI IT II IT _0 0E I IT Fim� :9 El ID ID E0 D E91HIME10BE-1 o 110DOODEK, M ❑❑❑❑ BEIE 19 'EDRIE =TREM OI T IT QIr 'IT.I T .1.T I B I, L2 1 -0-T 12—T -T —T Is, k TI IT d -IING- 2—IT 28TH Si I, I 14' 2 TI.T IS, I—TERY100, 211DIT 22—T 10 % 2— 21—T .:TORIII % 11T1IT IT 7 15 III"IT 1—IT 12T.IT 6 4 ✓ IT 1—IT 3 I—TY-11R. I PIRK 1 9 8 IT 31.IT ISTST on —.1—T Legend Required Fire Flow Z�E� 0-1,000 gpm —' I. ANAI T.EI­V 2,500 gpm 2,750-4,500 gpm I.——.E IT High Zone 20 Morgan Hill Zone Future High Zone A Low Zone sE—RI d16, City Limits FIGURE 3-5 6 19011T N FIRE FLOW 0 1,500 3,000 4,500 6,000 LOCATIONS Feet City of Port Townsend Water System Plan 1 inch equals 2,900 feet This page left blank intentionally. IT I r IT IsT—IT DR 3 41R..T Is, SS S r'r 11 IT MIL T 'IT ST IT I T I 1111 IT IT —T'T IT —TING Is, IT Is, CI-TIRI IT --Rl I, ID —I IT T T—T A 4 j E ,� aT.TIT "6, IT 1 -tom sr IT I IT IT IT IIT IRII IT i MEwAr 41 IT a sTS T Legend High Zone Distribution Pipeline Improvements is Morgan Hill Zone D-1 Future High Zone D-2 Low Zone D-3 NIAN,v City Limits D-4 D-5 D-6 I-IIIII—Is ---IT D-7 D-8 D-9 sET D-10 Fire Flow Storage and Treatment Improvements Storage:S-1,S-2,S-3 Treatment:T-3,T-4,T-5 FIGURE 3-6 90P.T N DISTRIBUTION, STORAGE, AND TREATMENT SYSTEM 0 1,500 3,000 4,500 6,000 IMPROVEMENTS !!n Feet City of Port Townsend Water System Plan 1 inch equals 3,000 feet This page left blank intentionally. . ■II:I::C:I_::EI:: ON. ■n■■�_-''s�:aiZ. L�` 1 �= X11 n�._.■■■■i� �� �1e��o yin ION i:'.:• 11.1:■■■:■■1■■_■;_m.•s1 ' L'111111■1....■:I�::::I:_:�;••. �,112:■■__■n:■■■peel°I2=r:�jlli.. 1:■■■1::1�:1:■■1_A NONE MMAv Crla�o•��:'.s' y FIGURE 3-7 i .• DISTRIBUTION OF 1"T� 1 11 111 11 . 111 City of Port Townsend Water System Plan • This page left blank intentionally. Appendix D Local Government Consistency This Page Intentionally Left Blank F"OrHealth grwbn'Ci: nl+l Hmlllr l�'r uJ[41Mi~{'Iln Local Government Consistency Review Checklist Water System Name: City of Port Townsend PWS ID: 69000R Planning/Engineering Document Title: 2014 Water System Plan _ Plan Date: September 1, 2014 Local Government with Jurisdiction: City of Port Townsend and Jefferson County WAC 246-290-108 Consistency with local plans and regulations: Consistency with local plans and regulations applies to planning and engineering documents under WAC 246-290-106, 246-290-107, and 246-290-110(4)(b (ii). 1) Municipal water suppliers must include a consistency review and supporting documentation in its planning or engineering document describing how it has addressed consistency with local plans and regulations. This review must include specific elements of local plans and regulations, as they reasonably relate to water service as determined by Department of Health (DOH). Complete the table below and see instructions on back. Page(s)in Planning Yes—No— Local Government Consistency Statement Document Not Applicabl e a) The water system service area is consistent with the adopted land 2008 WSP Yes use and zoning within the applicable service area. Figure 1-5 b)The six-year growth projection used to forecast water demand is consistent with the adopted city/county's population growth 2014 WSP 'Yes projections. If a different growth projection is used, provide an Section 2.2 explanation of the alternative growth projection and methodology. c)Applies to cities and towns that provide water service: All water 2008 WSP Appx G service area policies of the city or town are consistent with the utility PT Municipal Code Title Yes service extension ordinances of the city or town. 13 Article 2 - d) Service area policies for new service connections are consistent 2008 WSP Appx G with the adopted local plans and adopted development regulations of PT Municipal Code Title Yes all jurisdictions with authority over the service area [City(ies), 13 Article 2 Count ies . e) Other relevant elements related to water supply are addressed in the water system plan, if applicable; Coordinated Water System plans, 2008 WSP Regional Wastewater plans, Reclaimed Water plans, Groundwater Section 1.4 I Yes Area Management plans, and Capital Facilities Element of . ,c Comprehensive plans. I certify that the above statements are true to the best of my knowledge and that these specific eler7ients are consistent with adopted local plans and development regulations. Signa re Date Printed Name, Title, & Jurisdiction September 2009 Page 1 of 2 This page left blank intentionally. 0�r�i "Yof port Development Services Department 250 Madison, Suite 3 ownsen Port Townsend, WA 98368 360-379-5095 Fax 360-344-4619 To: Port Townsend City Council From: Jack Range, Port Townsend Planning Commission Vice-Chair Date: June 27, 2014 Subject: File No. LUP14-037, Review and Recommendation on adoption of the 2014 Water System Plan (WSP)update Findings of Fact, Conclusions of Law and Recommendation The Port Townsend Planning Commission respectfully submits to the City Council the following Findings of Fact, Conclusions of Law and Recommendation for the above-referenced application: FINDINGS OF FACT Proposal and Background: 1. As a purveyor of public water, the City of Port Townsend is required to prepare and adopt a Water System Plan(WSP) in order to maintain compliance with Washington State Department of Health (DOH) requirements. 2. Per DOH requirements, a WSP is normally be updated every six (6) years. The City's current WSP was approved in July 2008. The DOH has agreed to the City providing a limited update in 2014 that will be valid for three years. This abbreviated WSP effort will allow the City to complete installation of a new federally-mandated water filtration system and evaluate changes needed to it once online. At that time, a full WSP update will be prepared and processed. 3. The 2014 WSP applies to land within the City of Port Townsend as well as to certain areas of unincorporated Jefferson County located within the WSP-defined service area. No changes to the water service area established by the 2008 WSP are being sought with the 2014 update. Adoption of the 2014 WSP update is designed to improve and update existing standards in a manner consistent with the City's adopted Comprehensive Plan, as outlined below. Environmental Review: 4. Adoption of the 2014 WSP update is undergoing environmental review and threshold determination in compliance with the State Environmental Policy Act(SEPA) (Chapter 43.21C RCW, and Chapter 197-11 WAC) and Chapter 19.04 PTMC. A Notice of Application and Intent to Issue a Determination of Non-Significance (DNS) was published and provided to interested agencies on June 18, 2014. The public comment period for SEPA review ends on July 3, 2014. SEPA review will be completed prior to seeking final adoption of the 2014 WSP update from the City Council. 5. On June 18, 2014,the State Department of Commerce, Growth Management Services, acknowledged receipt of the City's intent to adopt the 2014 WSP update as required under RCW 36.70A.106. Review Process: 6. In addition to environmental review under SEPA, adoption of the 2014 WSP update must be reviewed for consistency with the City's Comprehensive Plan. The Planning Commission finds the most applicable Goals and Policies of the Comprehensive Plan that relate to adoption of the 2014 WSP are found in the Capital Facilities and Utilities Element . They include the following: Purpose: The purpose of the Capital Facilities & Utilities Element is to identify and coordinate improvements necessary to accommodate orderly growth, set policy direction for capital improvements, and ensure that they are provided in a timely manner. The need to provide specific facilities and services is directly linked to community expectations. Capital Facilities - Generally Goal 1: To plan and provide adequate public capital facilities and utilities to address current needs and growth and development. Policy 1.1:Design public facilities to be compatible in scale and design with surrounding uses, and to incorporate common design elements which enhance a sense of community and neighborhood identity. Policy 1.2:Determine capital facilities and utilities needs based on adopted level of service standards, adopted population projections, and the growth patterns established in the Land Use Element. Use population projections for the 50 year planning period or ultimate build- out under the growth patterns established by the Land Use Element to determine City needs for water, wastewater and stormwater facilities. Recognize that limited water supplies, financial resources, and environmental constraints may restrict growth to a level below adopted population projections. Policy 1.3:Promote conservation of energy, water and natural resources and the use of alternative technologies in the location and design of public facilities and utilities (e.g., use natural drainage systems rather than constructing piped stormwater systems). Policy 1.4:Provide adequate public facilities and responsive and efficient public services in order to attract and support commercial and manufacturing development consistent with the Economic Development Element of this Plan. Phasing of Capital Facilities & Utilities Goal 2: To phase the timing and provision of capital improvements in a manner that promotes orderly growth and development and the efficient use of City resources. Policy 2.1:Ensure that the growth and development patterns established by the Land Use Element minimize facility demands for transportation, water treatment and distribution, wastewater treatment, surface water management, and police and fire protection, Policy 2.2:Make efficient and cost-effective use of existing public facilities, including such techniques as: conservation; demand management and improved scheduling; shared use of public facilities; and the use of alternative technologies. 2 Policy 2.3:Expand public facilities, or construct new public facilities, only when necessary to achieve efficient service delivery or attain identified levels of service. Policy 2.4:Identify and designate urban capital facility and utility growth tiers which are consistent with and support the growth and development patterns established in the Land Use Element. 2.4.1 Designate areas that are currently characterized by urban development and densities, which are provided with the full range of public facilities and utilities, as "Tier 1" areas. 2.4.2 Designate areas currently provided with limited public infrastructure which are designated for commercial, manufacturing, or higher density residential development, as "Tier 2" areas. 2.4.3 Designate all remaining areas as "Tier 3." [Ord. No. 2825, § 3.3, (January 6, 2003)]. Policy 2.5:Within the framework of the annual Capital Improvement Program (CIP)process, prioritize the provision of capital facilities, services and utilities. 2.5.1 Highest priority should be given to ensuring the continued operation and maintenance of urban capital facilities, services and utilities regardless of their location. 2.5.2 Second priority should be given to expanding capital facilities, services and utilities within Tier 1 areas. 2.5.3 Third priority should be given to expanding capital facilities, services and utilities within Tier 2 areas, within the 20 year planning horizon. 2.5.4 Lowest priority should be given to expanding capital facilities, services and utilities within Tier 3 areas. Policy 2.6:Consistent with policy 2.5, above, the City should not provide facilities, services and utilities in unserved areas unless clearly specified within the annual CIP. However, developers and home builders may, at their own expense, provide facilities, services and utilities for new development in presently unserved areas, based on adopted level of service standards. Levels of Service Goal 3: To provide adequate public facilities that achieve and maintain the level of service standards for the existing and future population. Policy 3.1:Use the following level of service standards for determining the need for public wastewater and water facilities: ABLE VII-1: WATER& WASTEWATER LEVEL OF SERVICE STANDARDS FACILITY STANDARD City: Raw Water Supply 360 gallons/capita/day Tri-Area: Raw Water Supply 340 gallons/capita/day City: Raw Water Storage 50,000 gallons/capita ri-Area Raw Water Storage N/A City: Treated Water Storage 475 gallons/capita 3 TABLE VII-1: WATER& WASTEWATER LEVEL OF SERVICE STANDARDS FACILITY STANDARD ri-Area: Treated Water Storage 535 gallons/capita City: Wastewater Collection & Treatment 120 gallons/capita/day Concurrency Management Goal 4: To ensure that water, wastewater, stormwater and transportation facilities are provided concurrent with new development, based on the City's adopted level of service standards. Policy 4.1:Evaluate each development to ensure that it meets the City's adopted level of service standards for water, wastewater, and stormwater facilities prior to issuance of a building permit. Evaluate each development to ensure that it meets the City's adopted level of service standards for transportation facilities within six years of issuance of a building permit. Policy 4.2:Review and condition each development to ensure that appropriate provisions are made for facilities, services and utilities not required for concurrency, including, but not limited to: a. Fire and emergency medical services (EMS); b. Parks, open spaces and trails; c. Law enforcement; and d. Schools and school facilities. Policy 4.3:Provide the following options for applicants when adequate public facilities are not available concurrent with the impacts of development: a. Mitigate all development impacts on levels of service; or, b. Revise the proposed development to reduce impacts and maintain satisfactory levels of service; or, c. Phase the development to coincide with the availability of increased water, wastewater, and transportation facility capacity. Policy 4.4:Develop, adopt and implement a concurrency management system within one year following adoption of this Comprehensive Plan. Funding & Financial Feasibility Goal 5: To provide needed public facilities within the City's financial capabilities or within the City's authority to require others to provide such facilities. Policy 5.1:Base the Capital Facilities Plan on estimates of local revenues and external revenues which are reasonably anticipated to be received by the City. 5.1.1 Consider a wide variety of potential funding sources to finance the capital improvements specified in the Capital Facilities Plan, such as: real estate excise tax; user fees; general obligation bonds; and impact fees. 5.1.2 Match revenue sources to capital projects on the basis of sound fiscal policies. Sound fiscal policies include: cost-effectiveness; prudent asset and liability management; ensuring that the length of financing does not exceed use of the City's borrowing capacity; prudent use of the City's borrowing capacity; and maximizing the use of grants and other external revenues. Policy 5.2:Finance the six-year Capital Improvements Program to assure a positive balance between available revenue and needed capital facilities and utilities. If projected funding is inadequate to finance needed capital facilities and utilities based on adopted level of service standards and forecasted growth, make adjustments to one or more of the following: a. Level of service standard; b. Land Use Element; and/or c. Sources of revenue. Policy 5.3:Ensure adequate funding is available for long term operations and maintenance costs prior to the construction of new capital facilities. Policy 5.4:Ensure that new development pays a proportionate share of the cost of new capital facilities and utilities needed to serve the development. Policy 5.5:Ensure that developers provide capital facilities and utilities concurrent with new development, or provide a contractual agreement for the phasing of facilities and utilities, subject to approval by the City. Consistency with Other Plans Goal 6: To ensure that the Capital Facilities Element is consistent with other City, local, regional and State adopted plans. Policy 6.1: Ensure that functional plans (e.g., Stormwater Master Plan) and subarea plans (e.g., Urban Waterfront Plan) are consistent with the goals and policies of the Comprehensive and Capital Facilities Plans. Policy 6.1.1: Where found inconsistent with the Comprehensive Plan, process initial adoption of/revisions to functional plans and subarea plans as a Comprehensive Plan amendment during the annual amendment cycle. Policy 6.2: On an annual basis, reassess the Comprehensive Plan to ensure that capital facilities, utilities needs, financing, and levels of service are consistent and that the Plan is internally consistent. [Ord. No. 3075, § 3.6, (June 18, 2012)]. Essential Public Facilities Goal 7: To ensure efficient and equitable siting of essential public facilities through cooperative and coordinated planning, with Jefferson County and other jurisdictions within the region. Policy 7.1: Work with Jefferson County to jointly develop specific siting criteria and standards for essential public facilities. Elements of the siting criteria should include, but not be limited to: a. Proximity to major transportation routes and essential infrastructure; b. Land use compatibility with the surrounding area; c. Potential environmental impacts; d. Effects on resource lands and critical areas; e. Proximity to urban growth areas; 5 f. Public costs and benefits, including operations and maintenance; g. Current capacity and location of equivalent facilities; and h. The existence, within the community, of reasonable alternatives to the proposed activity. Policy 7.2: Ensure that the Comprehensive Plan and implementing regulations do not preclude the siting of essential public facilities. Unincorporated Areas Served by the City Goal 8: To ensure that urban level public facilities and utilities are only extended into UGAs and LAMIRDs and otherwise extended only if consistent with official land use designations. Policy 8.6: Cooperate with Jefferson County to contain urban growth within appropriately designated UGA's, ensuring that commercial and manufacturing areas outside of UGA's: a. Are rural in character, scale and intensity; b. Are served at a rural level of service; and c. Do not accommodate businesses and services that directly compete with uses within the UGA's; or d. Are approved Major Industrial Developments (MIDs), wihich MIDs are permitted and approved consistent with GMA and interlocal agreement between the City and Jefferson County providing for siting and permitting criteria. (Ord. No. 2825, § 3.3, (January 6, 2003); Ord. No.2783, (November 19, 2001). UTILITY GOALS & POLICIES Utilities—Generally Goal 9: To ensure the provision of utilities to address current needs and growth and development. Policy 9.1: Ensure environmentally sensitive, cost effective, safe and reliable utility service that is compatible with the surrounding land uses. Policy 9.2: Encourage the joint use and provision of utility corridors, facilities and services. Policy 9.3: Coordinate planning and development review with other jurisdictions when utility additions and improvements cross jurisdictional boundaries. Policy 9.4: Ensure that above-ground utility installations (e.g., microwave relay towers) are located and designed in a manner most compatible with the surrounding neighborhood and natural characteristics of the land. Policy 9.5: Install new and, where feasible, relocate existing utility distribution lines underground. (Note: Placing utility lines underground will enhance the visual aesthetics of town, reduce the potential for power outages, and eliminate unattractive pruning of vegetation). 9.5.1 Explore prioritizing the placement of utility lines underground along major transportation routes with good territorial views. 9.5.2 Acknowledge the disproportionate costs of placing existing lines underground for smaller developments by allowing owners to defer until underground placement occurs as part of a larger project where economies of scale can be realized. 9.5.3 Consider the rates and tariffs of the Washington Utilities and Transportation Commission (WUTC) in determining which existing distribution lines should be placed underground. Policy 9.6: Work to ensure reasonable and equitable utility rates and regulations for Port Townsend residents by offering regular testimony before the WUTC. Policy 9.7: Periodically review the scientific research on risks associated with exposure to electromagnetic fields (EMF). If warranted by new information or changes to state or federal regulation, modify policies and regulations. Policy 9.8: Ensure that public and private utilities minimize the clearing of trees and vegetation in the management of utility corridors and street rights-of-way. City Water Utility Water Service- Generally Goal 10: To provide quality drinking water to all Port Townsend residents. Policy 10.1: Allow developers to provide service extensions within the City service area, provided: City design and construction standards and Washington State Department of Health(i.e., DOH) regulations and requirements are met; the costs of the extensions are paid for by the developer or new customers; off-site impacts are mitigated; all necessary permits are obtained; and all right-of-way issues are resolved. Policy 10.2: Ensure that water service extensions are consistent with this Comprehensive Plan, adopted level of service standards, the City's Water Master Plan, and the Coordinated Water System Plan (CWSP). Policy 10.3: Maintain commitments to provide water to existing retail customers. (Note: Water provided to contractual customers should be subject to the terms of the contract). Policy 10.4: Tier water system infrastructure improvements and service extensions in a manner consistent with Policy 2.5 of this element. Policy 10.5: Following installation and approval by the City, ensure that all water main extensions are owned, operated and maintained by the City. Policy 10.6: Meet federal and state water quality requirements. Policy 10.7: Coordinate water supply, delivery and service systems with adjacent water purveyors. Policy 10.8: Organize and participate in water education programs and develop and distribute materials to inform citizens about water system issues and concerns. Emphasize public health, water conservation and watershed protection as essential elements of the education program. Water Service- Out-of-City Goal 11: To ensure the continuity of high quality water service to the out-of-City service area, without sacrificing the ability to serve the residents of the City. 7 Policy 11.1: Establish boundaries for the out-of-City service area that are based on the need to balance current service obligations with known limitations in the carrying capacity for the water resources available to the City. The City Council may adjust boundaries on an interim basis if an emergency exists. Policy 11.2: Provide water service to new customers only to the extent that excess water is available, as determined through the City's water reservation system. Policy 11.3: Allow service extensions within the out-of-City water service area under the following circumstances: the extension is consistent with the City's water reservation policy; the extension meets system design and construction standards and DOH regulations and requirements; the development costs are borne by the developer; off-site impacts are mitigated; and the extension is consistent with the CWSP. Policy 11.4: Allow service extensions outside the out-of-City water service area only for system looping, fire flow requirements, other specific system needs that provide enhanced service within the service area, or to meet prior contractual obligations. Policy 11.5: Continue to satisfy contractual obligations which require the City provide water to the Port Townsend Paper Company (PTPC). When renegotiating contracts or leases with the PTPC, give consideration to City water utility needs, historical partnership arrangements with PTPC, conservation requirements and opportunities, maintenance of the water system, in-stream flow needs and other related issues. Water System Planning Goal 12: To integrate water system planning with all other related planning efforts. Policy 12.1: Ensure that the City's Water Master Plan is consistent with this Comprehensive Plan(i.e., the Land Use Element, level of service standards and the Capital Facilities Plan set forth in this element). Policy 12.2: Participate in the Jefferson County Water Resources Council (which implements the Dungeness-Quilcene Water Resources Pilot Project Plan and addresses other regional water issues) to protect and enhance the overall water resources of eastern Jefferson County. Policy 12.3: Actively participate in the development of the Jefferson County Coordinated Water System Plan (CWSP) as a member of the Water Utilities Coordinating Committee (WUCC) and the WUCC Steering Committee. 12.3.1 Coordinate City GMA and water system planning with the CWSP process. 12.3.2 Assure that appropriate procedures are followed in the preparation of the CWSP, particularly public involvement processes and environmental review procedures. 12.3.3 Implement the policies of the Dungeness-Quilcene Water Resources Pilot Project Plan in the development of the CWSP. Policy 12.4: Regularly update, and implement the City's Water Master Plan, and monitor the effectiveness of the City's water system. Policy 12.5: Cooperate with the U.S. Forest Service to protect and enhance the water quality of the Big and Little Quilcene rivers. Update the Watershed Management Plan as needed to protect river resources. Policy 12.6: Use the joint County/City GMA population forecast to develop 20 and 50 year projections of water demand for both the in-City and out-of-City service areas. Policy 12.7: When projecting future water needs, anticipate possible reductions in demand which could be achieved through water conservation programs. Water Supply Goal 13: To develop and maintain water supplies to meet the needs of future City water utility customers. Policy 13.1: Reserve and develop the supply system capacity required to meet the current and future water demands of City water utility customers. Policy 13.2: Protect surface water rights. Cooperate with the PTPC, the Point No Point Treaty Council and other entities to develop an in-stream flow program for the Big and Little Quilcene Rivers. Policy 13.3: Protect groundwater rights and supply. Water Conservation Goal 14: To promote the conservation and prudent use of water resources. Policy 14.1: Ensure that water conservation is an integral component of the City's water supply planning program and that new development is designed to conserve water resources. Policy 14.2: Encourage all City water customers to voluntarily conserve and prudently use water resources. Policy 14.3: Develop an Emergency Water Shortage Response Plan to ensure that the essential needs of City water customers are met and that available water is distributed equitably. Give priority to the basic public health needs of all customers in the case of a severe water shortage. Policy 14.4: Examine opportunities for water reuse and recycling as an approach to reducing water demands. Potential uses include: a. Recycling water for manufacturing processes, industrial cooling, and power plant cooling; b. On-site wastewater treatment and recycling of effluent for nonpotable uses in residential and commercial buildings; and c. Reuse of treated effluent for municipal irrigation. Policy 14.5: Promote voluntary conservation and prudent use of water by all customers, including the mill, through City programs, and programs developed in cooperation with other agencies. 14.5.1 If conservation incentives are determined to be a cost-effective means of increasing the quantity of water available for municipal uses, the City should participate in these incentives, with such costs shared by all system users. 14.5.2 Design a water rate structure that encourages conservation. Water Quality Goal 15: To protect and enhance the quality of all surface and groundwater supplies. Policy 15.1: Continue to work with the Washington State Department of Health to implement the measures necessary to remain an unfiltered surface water supply system, while at the same time planning for the potential future requirement of filtration. Policy 15.2: Provide water that meets all state and federal water quality standards for source water and domestic supply to City retail customers. Policy 15.3: Develop and enforce a cross connection control program as required by the Washington State Department of Health and the Federal Environmental Protection Agency. Policy 15.4: Protect groundwater resources through the identification of aquifers and regulation of activities in aquifer recharge areas. Policy 15.5: Develop and implement a well-head protection program as required by the Washington State Department of Health. Water Supply System Performance Goal 16: To develop a more efficient water distribution system. Policy 16.1: Approve new service connections under the following circumstances: a. When sufficient water quantity and pressure exist to meet minimum design and construction standards in effect at the time of development; or b. When the necessary improvements are scheduled within the six year Capital Facilities Plan (CFP). When development is proposed in an area where existing water system levels of service are below standard and no improvements are scheduled in the CFP, allow the project applicant to provide needed system enhancements to allow development to proceed. Policy 16.2: Ensure that new system connections do not reduce levels of service to existing customers. Policy 16.3: Design and construct all water system connections and extensions in accordance with the standards contained in the City's Design and Construction Manual. Policy 16.4: As financial resources become available, improve the existing distribution system in order to satisfy minimum standards for pressure and fire flow. Water System Financing Goal 17: To manage the City water utility in a fiscally sound manner. Policy 17.1: Operate the Water Utility as a self-supporting enterprise that maintains fiscal solvency and rate stability. l4 Policy 17.2: Complete replacements and improvements to the water system in accordance with the Capital Improvement Program (CIP). Policy 17.3: Establish fees and charges that recover utility costs related to development. Policy 17.4: In instances where service extensions are requested before the City is scheduled to make the improvements, allocate the costs of extensions in accordance with the Water Master Plan policies. Policy 17.5: Require payment for off-site impacts related to system extensions in accordance with the Water Master Plan policies. Policy 17.6: Permit latecomer agreements for system extensions in accordance with the Water Master Plan policies. Policy 17.7: Ensure that the water utility rate structure allocates costs fairly between different classes of customers and service areas. Apply cost of service principles to determine appropriate cost allocations. Policy 17.8: Design a water utility rate structure that encourages conservation. Policy 17.9: Continue to provide water utility rate assistance to low income customers, as defined in Chapter 13.24 of the Port Townsend Municipal Code (PTMC). CONCLUSIONS OF LAW 7. It is not anticipated that adoption of the 2014 WSP update will result in probable significant adverse impacts to the built or natural environment, or place uncompensated burdens upon existing or planned service capabilities. To confirm this, environmental review pursuant to the State Environmental Policy Act (SEPA) is underway and will be completed prior to staff seeking final approval from the City Council. 8. The proposed adoption of the 2014 WSP update is consistent with the GMA, the adopted countywide planning policy of Jefferson County, and the City's Comprehensive Plan. RECOMMENDATION After careful review of the record, consideration of testimony provided at a public hearing and Commission discussion, the Port Townsend Planning Commission by a vote of (0 in favor and Q opposed hereb recommend to the City Council that the 2014 Water System Plan (WSP) update b PPRQVI DISAPPROVED with the following recommendations: Ar5 5PBRJ-K Ot > Respectfully submitted on behalf of the Port Townsend Planning Commission, VOL.U0 3 lLjk A• p o a_ c_, K 6AAA" Tvtis e­2(a) ZA l,q . ;�Izexl - 11 ck Range, Vice-Chair ate 1L This page left blank intentionally. f v rcalt� Local Government Consistency Review Checklist Water System Name: City of Port Townsend_ PWS ID: 6900OR Planning/Engineering Document Title: 2014 Water System Plan Plan Date: September 1, 2014 Local Government with Jurisdiction: City of Port Townsend and Jefferson Count WAC 246-290-108 Consistency with local plans and regulations: Consistency with local plans and regulations applies to planning and engineering documents under WAC 246-290-106, 246-290-107, and 246-290-110(4)(b (ii). 1) Municipal water suppliers must include a consistency review and supporting documentation in its planning or engineering document describing how it has addressed consistency with local plans and regulations. This review must include specific elements of local plans and regulations, as they reasonably relate to water service as determined by Department of Health (DOH). Complete the table below and see instructions on back. Page(s)in Planning Yes—No— Local Government Consistency Statement Document Not APPlicable a) The water system service area is consistent with the adopted land 2008 WSP Yes use and zoning within the applicable service area. Figure 1-5 b) The six-year growth projection used to forecast water demand is consistent with the adopted city/county's population growth 2014 WSP Yes projections. If a different growth projection is used, provide an Section 2.2 explanation of the alternative growth projection and methodology. c) Applies to cities and towns that provide water service: All water 2008 WSP Appx G service area policies of the city or town are consistent with the utility PT Municipal Code Title Yes service extension ordinances of the city or town. 13 Article 2 d) Service area policies for new service connections are consistent 2008 WSP Appx G with the adopted local plans and adopted development regulations of PT Municipal Code Title Yes all jurisdictions with authority over the service area [City(ies), 13 Article 2 County(ies)]. e) Other relevant elements related to water supply are addressed in the water system plan, if applicable; Coordinated Water System plans, 2008 WSP Regional Wastewater plans, Reclaimed Water plans, Groundwater Section 1.4 Yes Area Management plans, and Capital Facilities Element of Comprehensive plans. I certify that the above statements are true to the best of my knowledge and that these specific elemerltl are consistent it ted local plans and development regulations. Signature Date Printed Name, Title, & Jurisdictio'n ` September 2009 Page 1 of 2 Consistency Review Guidance For Use by Local Governments and Municipal Water Suppliers This checklist may be used to meet the requirements of WAC 246-290-108. When using an alternative format, it must describe all of the elements; 1a), b), c), d), and e), when they apply. For water system plans (WSP), a consistency review is required for the retail service area and any additional areas where a municipal water supplier wants to expand its water right's place of use. For small water system management programs, a consistency review is only required for areas where a municipal water supplier wants to expand its water right's place of use. If no water right place of use expansion is requested, a consistency review is not required. For engineering documents, a consistency review is required for areas where a municipal water supplier wants to expand its water right's place of use (water system plan amendment is required). For non-community water systems, a consistency review is required when requesting a place of use expansion. All engineering documents must be submitted with a service area map per WAC 246-290110(4)(b)(ii). A) Documenting Consistency: Municipal water suppliers must document all of the elements in a consistency review per WAC 246-290-108_ 1 a) Provide a copy of the adopted land uselzoning map corresponding to the service area. The uses provided in the WSP should be consistent with the adopted land use/zoning map. Include any other portions of comprehensive plans or development regulations that are related to water supply planning. 1 b) Include a copy of the six-year growth projections that corresponds to the service area. If the local population growth rate projections are not used, provide a detailed explanation on why the chosen projections more accurately describe the expected growth rate. Explain how it is consistent with the adopted land use. 1 c) Include water service area policies and show that they are consistent with the utility service extension ordinances within the city or town boundaries. This applies to cities and towns only. 1 d) Include all service area policies for how new water service will be provided to new customers. 1 e) Other relevant elements related to water supply planning as determined by the department (DOH). See Local Government Consistency--Other Relevant Elements, Policy B.07, September 2009. B) Documenting an Inconsistency: Please document the inconsistency, include the citation from the comprehensive plan or development regulation, and provide direction on how this inconsistency can be resolved. C) Documenting Lack of Consistency Review by Local Government: Where the local government with jurisdiction did not provide a consistency review, document efforts made and the amount of time provided to the local government for their review. Please include: name of contact, date, and efforts made (letters, phone calls, and e-mails). In order to self-certify, please contact the DOH Planner. The department of Health is an equal opportunity agency. For persons with disabilities,this document is available on request in other formats.To submit a request, please call 1-800-525-0127(TTY 1-800-833-6388). September 2000 Page 2 of 2 This page left blank intentionally. PUDBoard of Commissioners Jefferson County Barney Burke, District 1 Public Utility District Ken McMillen, District 2 Wayne G. King, District 3 July 21, 2014 James G. Parker, Manager City of Port Townsend Attn: Ian Jablonski< ablonski @cityofpt.us> 250 Madison Street Port Townsend WA 98368 Ian: The purpose of this letter is to verify that PUD#1 of Jefferson County received a copy of your draft 2014 Water System Plan Update. I have reviewed in great detail and understand the process and the results and recommendations. The PUD is in the process of consolidating its LUD#3 water system into the Quimper Water system and will have the inter-tie completed by the end of 2016. This is in line with the PT Water System Plan. If your any questions please call. 4J mes G. Parker, PE anager I PH(360)385-5800 FX(360)385-5945 230 Chimacum Road/P.O.Box 929,Port Hadlock,WA 98339 customerservice(affpud.org 310 Four Corners Road,Port Townsend,WA 98368 This page left blank intentionally. Page I of 6 PORT TOWNSEND CITY COUNCIL BUSINESS MEETING AGENDA CITY HALL COUNCIL CHAMBERS, 540 WATER STREET Business Meeting 06:30 p.m. August 4, 2014 L Call to Order and Pledge of Allegiance II. Roll Call III. Changes to the Agenda IV. Special Presentation A. Waste Water Treatment Facility and Biosolids Awards Presentation with the Department of Ecology Bio-Solids Wastewater Treatment Plant Outstanding Performance Award Letter Wastewater Treatment Plant Outstanding Performance Award Letter B. Community Vitality Index (CVI) Special Presentation CVI Presentation to Port Townsend City Council V. Comments from the Public (re consent agenda items and items not on the agenda) (Each person has 3 min. to comment - City Clerk will signal at 2 min. 30 sec. A. Public comment B. City staff response VI. Consent Agenda A. Approval of Bills, Claims and Warrants B. Approval of Minutes: July 14, 2014 July 14 2014 Minutes http://cityofpt.granicus.com/GeneratedAgendaViewer.php?view id=2&clip id=861 8/6/2014 Page 2 of 6 VII. Public Hearing A. Ordinance 3115, Adopting the City of Port Townsend 2014 Water System Plan and Establishing an Effective Date Action:Move to waive Council Rules and approve Ordinance 3115 Adopting the City of Port Townsend 2014 Water System Plan and Establishing an Effective Date. 1. Staff presentation 2. Public comment 3. Council deliberation and action AB 14-105.W aterSystemPlan.080414 Attachment 1 - Ordinance 3115 Water System P1an.080414 Attachment 2 -Port Townsend Water System Plan Update Attachment 3 - 2014 Water System Plan Update Summary Sheet VIII. Unfinished Business A. Ordinance 3112 Adopting Zoning Regulations and Standards Relating to Both Medical and Recreational Mari-juana_ and Amending Port Townsend Municipal Code Chapter 17.08 Definitions, Chapter 17.16 Residential Zoning Districts, Chapter 17.18 Mixed Use Zoning Districts, Chapter 17.20 Commercial Zoning Districts_ Chapter 17.22 Marine-Related and Manufacturing Zoning Districts, and Chapter 17.84 Conditional Uses. Action: Move to Approve Ordinance 3112 Adopting Zoning Regulations and Standards Relating to Both Medical and Recreational Mar4uana, and Amending Port Townsend Municipal Code Chapter 17.08 Definitions, Chapter 17.16 Residential Zoning Districts, Chapter 17.18 Mixed Use Zoning Districts, Chapter 17.20 Commercial Zoning Districts, Chapter 17.22 Marine-Related and Manufacturing Zoning Districts, and Chapter 17.84 Conditional Uses 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda AB 14-106 Attachment 1 - Ordinance 3112 http://cityofpt.granicus.com/GeneratedAgendaViewer.php?view id=2&clip id=861 8/6/2014 Page 3 of 6 Attachment 2 - Ordinance 3112 Exhibit A Attachment 3 - Ordinance 3112 Exhibit B Attachment 4 - Ordinance 3112 Exhibit C Attachment 5 - Ordinance 3112 Exhibit D Attachment 6 - Ordinance 3112 Exhibit E Attachment 7 - Ordinance 3112 Exhibit F B. Ordinance 3114 Revising Port Townsend Municipal Code Chapter 5.32 Relating to Sales and Performances on Street and Sidewalks and Amending PTMC 3.36.070 on Fees, and Repealing Chapter 5.64 on Theatres and Shows Action: Move to approve Ordinance 3114 Revising Port Townsend Municipal Code Chapter 5.32 Relating to Sales and Performances on Street and Sidewalks and Amending PTMC 3.36070 on Fees, and Repealing Chapter 5.64 on Theatres and Shows 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda Bill AB 14-107 Attachment 1 - Ordinance 3114 Attachment 2 - Ordinance 3114 Exhibit A Attachment 3 -PTMC Chapter 5.64 Attachment 4 -Email to City Council from Amani Funk IX. New Business A. Resolution 14-044 Authorizing the City Manager to Sign Funding Documents with the United States Department of Agriculture (USDA) for a Rural Development Grant and Low-Interest Loan to Fund Critical Drinking Water Facilities Action: Move to approve Resolution 14-044 Authorizing the City Manager to Sign Funding Documents with the United States Department of Agriculture (USDA)for a Rural Development Grant and Low-Interest Loan to Fund Critical http://cityofpt.granicus.com/GeneratedAgendaViewer.php?view id=2&clip id=861 8/6/2014 Page 4 of 6 Drinking Water Facilities 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda Bill AB 14-108 Resolution 14-044 City Manager Memo USDA Letter of Conditions USDA Form - Request for Obligation of Funds USDA Letter of Intent to Meet Conditions B. 2014 Jefferson County Study Partnership Agreement with FEMA Action: Move to authorize the City Manager to sign the 2014 Jefferson County Study Partnership Agreement with FEMA 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda Bill AB 14-109 Attachment 1 - 2014 Jefferson County Study Partnership Agreement with FEMA C. Resolution 14-045_ Extending the term of the Climate Action Committee Action: Move to approve Resolution 14-045, Extending the term of the Climate Action Committee. 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda Bill AB 14-110 Attachment 1 -Resolution 14-045 http://cityofpt.granicus.com/GeneratedAgendaViewer.php?view id=2&clip id=861 8/6/2014 Page 5 of 6 Attachment 2 - Workplan Approved by the City Council and BOCC November 14 2011 D. Climate Action Committee Appointments Action: Move to approve appointing Jack Pokorny (student), Kevin Scott (PT Mill), Samantha Thomas (Non Motorized alternate); Laura Tucker (County Health-Green Business) to the Climate Action Committee 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda Bill AB 14-111 E. Joint Service Agreement-Fort Worden Public Development Authority Action: Move to authorize the City Manager to execute a joint services agreement with the Fort Worden Public Development Authority 1. Staff presentation 2. Public comment 3. Council deliberation and action Agenda Bill AB 14-112 PDA Agreement X. Presiding Officer's Report XL City Manager's Report XII. Suggestions for next or future agenda, regular meeting and/or study session XIII. Comments from Council XIV. Executive Session XV. Adjourn http://cityofpt.granicus.com/GeneratedAgendaViewer.php?view id=2&clip id=861 8/6/2014 Page 6 of 6 Americans with Disabilities Act In compliance with the Americans with Disabilities Act, those requiring accommodation for this meeting should notify the City Clerks Office at least 24 hours prior to the meeting at(360) 379-5045. http://cityofpt.granicus.com/GeneratedAgendaViewer.php?view id=2&clip id=861 8/6/2014 Ordinance 3115 Page I of 4 ORDINANCE NO.3115 AN ORDINANCE OF THE CITY OF PORT TOWNSEND ADOPTING THE CITY OF PORT TOWNSEND 2014 WATER SYSTEM PLAN AND ESTABLISHING AN EFFECTIVE DATE FINDINGS AND RECITALS. Based upon the public record before the Port Townsend City Council, the City Council of the City of Port Townsend finds as follows: 1. In the State Board of Health Code, Chapter 43.20 RCW, the Washington State Legislature has authorized the State Department of Health (DOH) to adopt rules and standards for public water systems, including mandatory planning and system development requirements. In accordance with Chapter 43.20 RCW, and for the purpose of protection of public health and safety, the Department of Health, through WAC 246-290, requires all public water utilities to prepare comprehensive water system plans consistent with the provisions of state law. In accordance with Washington law, and for the protection of public health and safety,the City has the authority to undertake necessary planning and regulatory activities regarding the City's municipal water utility. 2. On October 15, 2007 the City adopted the current Water System Plan with the passage of Ordinance No. 2954. The DOH requires that water system plans be updated every six years. In 2014 the City initiated the process of updating of the 2008 Water System Plan. The City's current plan approved by the DOH in August 2008 is comprehensive. Those chapters of the 2008 Water System Plan that are not identified in the 2014 Water System Plan will remain valid for three years from the date of final approval by DOH to allow the City to install filtration and evaluate the changes needed to the system once the filtration is online. 3. The City of Port Townsend adopted its Growth Management Act Comprehensive Plan in accordance with the Washington State Growth Management Act(GMA) on July 15, 1996, Ordinance No. 2539. All findings, recitals and other provisions of Ordinance No. 2539, and all provisions of the Comprehensive Plan and the public record supporting the Comprehensive Plan are incorporated herein by this reference. Adoption of the Comprehensive Plan was an essential prerequisite to adoption of a Water System Plan, in that the GMA Comprehensive Plan provides the City with analysis and guidance in assessing and anticipating population growth and infrastructure needs for the present and future residents within the City's water system service areas. The City's Comprehensive Plan is in the process of being revised and the 2014 Water System Plan uses the interim population growth rate of 1.01% compounded annual growth. 4. On June 26, 2014, the Planning Commission reviewed the Draft 2014 Water System Plan for consistency with the Comprehensive Plan, held a public hearing, and found it to be consistent with the Comprehensive Plan. Ordinance 3115 Page 2 of 4 5. The City's Water Service Area Boundary was confirmed by the City Council on April 2, 2007, and has not changed since that time. No changes to the Water Service Area Boundary are proposed for this update. 6. On July 16, 2014 after timely public notice, the City's SEPA Responsible Official issued a determination of non-significance (DNS) in accordance with Chapter 43.21C RCW, the State Environmental Policy Act(SEPA), with a final DNS issued thereafter. The City did not receive an appeal of the SEPA threshold determination. 7. In accordance with Washington law, the City forwarded the draft Water System Plan to the State of Washington Department of Health for review and comment. On July 1, 2104 the Department of Health provided comments to the City's Draft Water System Plan Update. The City responded to the comments and appropriately incorporated the response comments into the Draft Water System Plan. Following City Council approval of the Water System Plan, the Plan will be submitted to DOH for their final approval. 8. The Port Townsend Water System Plan contains goals, policies, system maps and design standards intended to guide the development of water system facilities. Components of the 2008 plan that have been updated in the 2014 plan include: (a) Basic planning data including population, service connections, equivalent residential unit(ERU) data, large water users, monthly and annual production and consumption, annual water use by customer class, and annual water use for wholesale or other systems. (b) System analysis of the carrying capacity indentifying limiting factors for the system and associated equivalent ERUs. (c) Capital improvement plan (CIP) for the next three years. (d) Budget analysis for the period of 2014 through 2017 identifying the financial impact of water operations and projects identified in the CIP. (e) Review of Water Rights Self Assessment. Other components of the 2008 Water System Plan remain in effect until the next plan update. 9. The Port Townsend Water System Plan has been prepared in conformance with the requirements of Chapter 43.20 RCW and WAC 246-290, and is consistent with and compatible with the Jefferson County Coordinated Water System Plan, adopted in accordance with Chapter 70.116 RCW. 10. On August 4, 2014, at its regularly scheduled open public meeting, the City Council held a public hearing regarding the update to the Water System Plan. 11. Based upon the foregoing findings and recitals, the City Council finds that adoption of the 2014 Port Townsend Water System Plan is consistent with and implements the City's Water System Policies, the requirements of Washington law, and serves and Ordinance 3115 Page 3 of 4 advances the public health, safety and welfare of Port Townsend and Jefferson County citizens. NOW, THEREFORE,based upon the public record and the foregoing Findings and Recitals, the City Council of the City of Port Townsend does ordain as follows: SECTION 1. ADOPTION. The 2014 Port Townsend Water System Plan Update (May 2014) is hereby adopted. The Update and the 2008 Water System Plan (except those portions of the 2008 Water System Plan modified or replaced by the 2014 Update) comprise the City's Water System Plan(2014). As stated in the Update: No updates to Sections 1.0, 5.0, 6.0 and 7.0[of the 2008 Water System Plan (WSP)J have been made for the 2014 WSP. However the City developed an interim Watershed Protection Plan which will be implemented until the water treatment plan is operational. Only portions of Section 3.0 and 4.0[of the 2008 WSPJ have been updated to address the information requested by DOH. Sections 2.0, 8.0 and 9.0[of the 2008 WSPJ have been updated in their entirety. The Water System Plan Update (May 2014) is included as Exhibit A (attached and incorporated by reference). The Council declares that the adoption of the Water System Plan through this Ordinance is necessary for the protection of public health and public safety. SECTION 2. REPEALER. Sections and portions of Sections of the 2008 Water System Plan are replaced or modified as set forth in the 2014 Update. SECTION 3. PREPARATION OF FINAL WATER SYSTEM PLAN COPIES. Copies of the Port Townsend Water System Plan (2014) (including relevant portions of both 2008 and 2014 documents) adopted by this Ordinance shall be prepared by Port Townsend Department of Public Works staff and shall be made available for public inspection within 30 days of final approval by the State Department of Health. The Water System Plan (2014) shall include as necessary all grammatical and numerical revisions. SECTION 4. FILING. The Water System Plan (2014) as approved by the City Council shall be filed with the City Clerk and shall be available for public inspection upon the effective date of this Ordinance. SECTION 5. TRANSMITTAL TO DEPARTMENT OF HEALTH. Upon completion of all final revisions, the Department of Public Works shall promptly transmit a copy of the final Port Townsend Water System Plan to the State Department of Health. SECTION 6. EFFECT OF REPEALED WATER SYSTEM PLAN(S). Upon the approval of the Water System Plan(2014) by the State Department of Health, those portions of any previously adopted Water Plan(s) repealed by this Ordinance shall be superseded by the Water System Plan (2014). If the Water System Plan(2014) adopted pursuant to this Ordinance Ordinance 3115 Page 4 of 4 is at any time hereafter declared by a court of competent jurisdiction in its entirety to be invalid or of no effect, the 2008 Plan shall constitute the City's Water System Plan exclusively for Washington State DOH compliance purposes, and all water system-related planning and regulatory actions by the City of Port Townsend undertaken thereafter shall be governed by adopted City Engineering Design Standards and the 1997 CWSP, including the City's Water Utility Service Area Agreement. SECTION 7. SEVERABILITY. If any clause, sentence, paragraph, section or part of this Ordinance or the Plan adopted herein, or their application to any person or circumstance is held to be invalid or unconstitutional by a court of competent jurisdiction, such order or judgment shall not affect the validity or constitutionality of the remainder of any part of this Ordinance or Plan. To this end, the provisions of each clause, sentence, paragraph, section or part of this Ordinance and Plan are declared severable. SECTION 8. EFFECTIVE DATE. This Ordinance shall be the date on which the State Department of Health approves in writing the Water System Plan (2014), which date is more than five days following publication of this Ordinance or a summary thereof. If DOH does not approve the Plan in its entirety, then those portions approved by DOH shall be effective, and the portions not approved by DOH shall not be included in this adoption. Adopted by the City Council of the City of Port Townsend, Washington, at a regular meeting thereof, held this 4th day of August 201,y', David King, Mayor Attest: Approved as to Form: oanna Sanders, C John P. Watts City Clerk City Attorney o -r VA STATE OF WASHINGTON DEPARTMENT OF HEALTH SOUTHWEST DRINKING WATER REGIONAL OPERATIONS PO Box 47823, Olympia, Washington 98504-7823 TDO Relay 1-800-833.6388 July 1, 2014 Ian Jablonski Port Townsend Water Department 250 Madison Street, Suite 2R Port Townsend, Washington 98368 Subject: City of Port Townsend, ID#69000R,Jefferson County; Water System Plan Update 3- Year Extension of 2008 Plan, ODW Project 414-0606 Dear Ian Jablonski: Thank you for submitting the City of Port Townsend Water System Plan (WSP)received by the Office of Drinking Water(ODW) on June 4,2014. We have reviewed the WSP and have the following comments that need to be addressed before ODW can approve the plan: 1. Page 15. Please provide a system schematic with a hydraulic grade line to clarify how water is moved within the service area. 2. Page 17. According to the presented capacity analysis,the system capacity limiting factor will be the Water Treatment Plant flow rate of 3 million gallons per day (mgd). Please verify that using this flow rate and peak hour demand that the treatment plant will meet the new CT requirements of 0.5 log Giardia inactivation for the membrane treatment facility, using the one and five million gallon (MG) reservoirs. The required volume to meet CT for the new treatment facility cannot contain equalization storage volume within the reservoirs. 3. Page 17. Please be aware that ODW has recently begun reevaluating baffling factors used in estimating contact time. We have assigned a baffling factor of 0.4 to the 1 MG standpipe and 0.25 to the 5 MG reservoir. Please verify that future CT for the new treatment plant can be met using these baffling factors and proposed peak hour demands. 4. Page 20. Standby Storage is not required but is recommended for system reliability and is a purveyor option to provide. Please clarify this under the standby storage discussion. 5. The operation and maintenance of a treatment plant can be more expensive that running a water system without treatment. Please clarify if the potential increase in operation and maintenance costs were included in the budget presented in this plan. General Comments 6. Please provide the Local Government Consistency Forms from both the City and the County. 7. Please provide documentation that a consumer meeting was held,the document was made available to adjacent purveyors,and that the plan was adopted by the governing board. Ian Jablonski July 1, 2014 Page 2 Recommendations/Observations 8, Pages 46 and 47. The interest rate for Drinking Water State Revolving Fund is a minimurn of 1 percent and the Community Block Grant is from the Department of Commerce, Please consider revising these pages. DEPARTMENT OF ECOLOGY On June 10, 2014, a copy of this WSP was sent to the Department of Ecology(Ecology). ODW received a response from Ecology that stated that they have no comments regarding this system's water system plan. Please note that ODW's approval of this WSP will not provide any guarantee and should not be considered to provide any guarantee concerning legal use of water or subsequent water rights decisions by Ecology. To expedite the review of the revised WSP, please summarize how each of the required responses were addressed and where each response is located(for example,page numbers,appendices, and so on). Regulations establishing a schedule of fees for review of planning, engineering, and construction documents were adopted April 30, 2012(WAC 246-290-990). An invoice for$3,705.is enclosed. If you have any questions, please contact me at(3 60)236-3031 or Teresa Walker(3 60)236-3032. Sincerely, f Teresa Walker, P.1 , king Water, Regional Planner Office of Drinking Water, Regional Engineer Enclosures cc; Mike Blanchette, HDR Engineering Eric Habermeyer,HDR Engineering Jefferson County Health Department Jefferson County Planning Department Tammy Hall,Department of Ecology City of Port Townsend 2014 Water System Plan Response to DOH Comments(Submitted to City via Letter Dated July 1,2014) Comment DOH Comment Draft Response Number I Page 15.Please provide a system schematic with a hydraulic grade line A figure has been provided in appendix F to clarify how water is moved within the service area. 2 Page 17.According to the presented capacity analysis,the system A CT calculation is provided at a flow rate of 3 mgd,the total capacity limiting factor will be the Water Treatment Plant flow rate of 3 capacity of the future treatment plant.The 2033 peak hour demand is million gallons per day(mgd).Please verify that using this flow rate and 2.86 mgd,less than the total treatment capacity.The flow from peak hour demand that the treatment plant will meet the new CT metered data is approximately 15%to the 1 MG standpipe and 85% requirements of 0.5 log Giardia inactivation for the membrane treatment to the 5 MG reservoir.As an added conservative measure,the CT facility,using the one and five million gallon(MG)reservoirs. calculation assumes a flow split of 30%to the 1 MG standpipe and 70%to the 5 MG reservoir.That calculated inactivation ratio(T achieved over T required)is 7.8 for the 1 MG standpipe and 10.4 for the 5 MG reservoir.Both tanks provide a CT greater than required for 0.5 log inactivation of Giardia.Appendix E contains the CT calculation. 3 Page 17.Please be aware that ODW has recently begun reevaluating See above.The baffling factors prescribed are used in the CT baffling factors used in estimating contact time.We have assigned a calculation. baffling factor of 0.4 to the 1 MG standpipe and 0.25 to the 5 MG reservoir.Please verify that future CT for the new treatment plant can be met using these baffling factors and proposed peak hour demands. 4 Page 20.Standby Storage is not required but is recommended for The statement has been revised by deleting the mention of system reliability and is a purveyor option to provide.Please clarify this "requirement'for standby storage.It is stated that the recommended under the standby storage discussion. standby storage volume is calculated per the Water System Design Manual. 5 The operation and maintenance of a treatment plant can be more See Section 9.4.A cost for future O&M cost related to the water expensive than running a water system without treatment.Please clarify treatment facility has been estimate and added to the projected if the potential increase in operation and maintenance costs were revenues and expenses in Table 9-6.Additional costs for filtration included in the budget presented in this plan. water treatment plant O&M expenses are expected to begin in October 2016 an increase yearly with a 3%inflation factor.Labor for plant operations is assumed to occur with existing staffing levels. 6 Please provide the local government consistency forms from both the These are provided Appendix D. City and the County. J u ly 8,2014 1 Comment DOH Comment Draft Response Number 7 Please provide documentation that a consumer meeting was held,the Appendix D includes an agenda for a consumer meeting and document was made available to adjacent purveyors,and that the plan adopting ordinance and documentation of adjacent purveyor was adopted by the governing board. consistency review 8 Pages 46 and 47.The interest rate for Drinking Water State Revolving DWSRF minimum interest rate is revised to be one percent.The Fund is a minimum of 1 percent and the Community Block Grant is Community Development Block Grant has been revised to reference from the Department of Commerce.Please consider revising these the Department of Commerce.See section 9.3 pages. J u ly 8,2014 2 STATE O� o `¢ STATE OF WASHINGTON DEPARTMENT OF HEALTH SOUTHWEST DRINKING WATER REGIONAL OPERATIONS PO Box 47823, Olympia, Washington 98504-7823 TDD Relay 1-800-833-6388 September 4, 2014 Ian Jablonski Port Townsend Water Department 250 Madison Street, Suite 2R Port Townsend, Washington 98368 Subject: City of Port Townsend, ID #69000R, Jefferson County; Water System Plan Update of 2008 Plan Three-Year Extension, ODW Project#14-0606 Dear Ian Jablonski: The Water System Plan(WSP) update received by the Office of Drinking Water (ODW) on June 4, 2014, along with the subsequent submittal received on August 12, 2014, have been reviewed and are APPROVED. Approval of this WSP is valid as it relates to current standards outlined in WAC 246-290 revised April 30, 2012, WAC 246-293 revised September 1997, and RCW 70.116 (Municipal Water Law) effective September 2003, and is subject to the qualifications herein. Future changes in the rules and statutes may be more stringent and require facility modification or corrective action. Based on the information supplied in the WSP, your water system has sufficient capacity to meet the growth projections for the identified three-year planning period. ODW is approving this plan for three years. An approved update of this WSP is required on or before September 4, 2017, unless ODW requests an update or plan amendment pursuant to WAC 246-290-100(9). APPROVED NUMBER OF CONNECTIONS Based on the analysis presented in the WSP, the City of Port Townsend water system is approved for 11,024 Equivalent Residential Units (ERUs), and for an Unspecified number of connections. The capacity was determined based on a Maximum Day Demand (MDD) of 272 gallons per day per ERU (gpd/ERU). The limiting factor for the system is treatment capacity (MDD) for the new filtration treatment facility. 9 1a Ian Jablonski September 4, 2014 Page 2 You are responsible for permitting the addition of new service connections to your water system in a manner consistent with the approved document. We expect you to maintain a process, which recognizes all new connections added to the water system, and the water demands associated with each connection. Your process must assure that physical capacity and water right limitations are not exceeded. LOCAL GOVERNMENT CONSISTENCY John McDonagh, Senior Planner, City of Port Townsend signed the local consistency statement on July 15, 2014. Stacie L. Hoskins, Planning Manager, Jefferson County signed the local consistency statement on July 14, 2014. This meets local government consistency requirements for WSP approval pursuant to RCW 90.03.386 and RCW 43.20. WATER RESOURCES Our approval of your water system plan does not confer or guarantee any right to a specific quantity of water. The approved number of service connections is based on your representation of available water quantity. If the Washington Department of Ecology, a local planning agency, or other authority responsible for determining water rights and water system adequacy determines that you have use of less water than you represented, the number of approved connections may be reduced commensurate with the actual amount of water and your legal right to use it. Ecology has not determined this WSP is "not inconsistent" with the approved watershed plan for WIRA 17. Please contact Ecology for more information. We recognize the significant effort and resource commitment involved in the preparation of this WSP. Thank you for your cooperation. If you have any questions, please contact Corina Hayes at (360) 236-3031 or Teresa Walker at (360) 236-3032. Sincerely, o Pin a es Teresa Walker, P.E. Office of Drinking Water, Regional Planner Office of Drinking Water, Regional Engineer cc. Mike Blanchette, HDR Engineering Eric Habermeyer, HDR Engineering Jefferson County Health Department Jefferson County Planning Department Tammy Hall, Department of Ecology Appendix E Chlorine Contract Time Calculation This Page Intentionally Left Blank Port Townsend WTP CT Calculation Model Updated: 7/8/2014 Using DOH-recommended hydraulic contacting efficiency(T1 0/T)values. iardia Cysts Viral Agents Plant Plant Tank Volume HDT Tta/T(5) Comam Chlorine Chlorine Chlorine pH Water CT Required CT Inactivation CT Required CT Inactivation Flow Flow(3) (1,2) Time 1 Applied Dose Residual(4) Temp Achieved Removal(6) Required Ratio Achieved Removal Required Ratio (gpm) (MGD) (gal) (min) (min) (lb/day) (mg/L) (mg/L) ("C) mg-min/L (log) (mg-min/L) (Inactivation mg-min/L (log) m�/L (CTa IcTr�) Initial WTP Capacity-3.0 MGD Winter High-Flow Conditions-Normal O ration with UV Disinfection 1 MG stand i e 625 0.90 600,000 1,260 0.40 512.0 6.0 0.60 0.60 8.0 4.0 307.2 0.5 39.4 7.80 307.22 4.0 72.00 25.60 5 MG reservoir, 1456 2.10 4,000,000 2,743 0.25 685.6 14.0 0.80 0.60 B.0 4.0 411.5 0.5 39.4 10.45 471.45 4.0 12.00 34.29 Notes: 1)Required Giardia log removal:0.5-log with filtration credit;3-log under emergency conditions with no filtration. 2)5 MG reservoir is 80%full(minimum) 3)1 MG standpipe is 80°/full(minimum) 4)Tanks operate in parallel,with assumed average flow split 70%to 5 MG tank,30%to 1 MG standpipe. 5)Assumes a target chlorine residual at oullet of each tank is not less than 0.6 mg/L and average total chlorine demand after injection is 0.2 mg/L.(Normal operating conditions.) 6) Tna/T value is assumed to be 0.40 for the standpipe and 0.25 for the reservoir. This page left blank intentionally. Appendix F Hydraulic Profile This Page Intentionally Left Blank m ---- 2�M —11R M M� El IN 3. x muf=50o w"«; o>o _ 3. PORT TOWNSEND WATER SYSTEM PLAN E L�) July 2014 HYDRAULIC PROFILE aE 11300-01 This page left blank intentionally. Appendix G SEPA Checklist and Determination This Page Intentionally Left Blank clty d.0 Ken Clow l Port . . Public works Director 250 Madison, Suite 2R . Port Townsend, WA 98368 360-379-5090 Fax 360-385-7675 kclow @cityofpt.us June 3, 2014 John McDonagh, Senior Planner Department of Development Services City of Port Townsend 250 Madison St Port Townsend, WA 98368 RE: SEPA checklist and Washington Department of Health (DOH) Consistency Review Checklist for City of Port Townsend 2014 Water System Plan (WSP) Dear Mr. McDonagh: Enclosed is the 2014 City of Port Townsend Water System Plan update and associated SEPA checklist (including the non-project supplemental checklist) and DOH consistency review checklist for your Department's review. The City's current plan was approved in July 2008 which was a comprehensive update. The DOH has approved providing a limited update that will be valid for three years to allow the City to install filtration and evaluate the changes needed to the system once the filtration is online. Port Townsend is maintaining the same service area as indicated in the 2008 Service Area map and 2008 land use and zoning map— both of these figures are included as attachments. Specific updates to the 2014 WSP include: • Basic Planning Data — Updated population, service connections, and ERU data. Identification of major water users. Updated information on monthly and annual production and consumption, annual use by customer class and annual use for wholesale or other systems. • System Analysis — System capacity analysis identifying the limiting factors for the system and associating them with equivalent ERU's and a summary of hydraulic capacity results which describe any areas which do not meet minimum pressure requirements. • Capital Improvement Plan (CIP) — Updated CIP to show what the City has planned for at least the next three years. • Budget —Three year budget with impact of projects identified in the CIP. Summary of the current rate structure and changes to the rates because of capital improvements. A NATIONAL MAIN STREET COMMUNITY WASHINGTON'S HISTORIC VICTORIAN SEAPORT The City is working with the DOH to have the plan reviewed and approved by September 1, 2014 in order for the City to be eligible for the 2014 Drinking Water State Revolving Fund cycle. Public Hearings are planned for June 26, 2014 with the Planning Commission for a Comprehensive Plan consistency review and August 4, 2014 at the City Council meeting. The County Planning Department is also conducting a DOH consistency review of the plan update. We look forward to your comments and please let me know if you have any questions. Sincerely, en Clow Enclosures cc: Judy Surber Development Services ekp°a7'o 250 Madison Street, Suite 3 Port Townsend WA 98368 Phone: 360-379-5095 Fax: 360-344-4619 WA SEPA ENVIRONMENTAL CHECKLIST www.cityofpt.us Name of proposed project, if applicable: Office Use Only City of Port Townsend Water System Plan Update Permit Legal Description: Tax#: N/A Associated Permits: Addition: N/A, Block(s): Lot(s): N/A Describe the location of the proposal, including physical characteristics and the extent of land area that would be affected. (Attach additional pages if necessary.)SEPA review for this plan will apply to the entirety of the Port Townsend Planning Area ti.e_ the City's incar orated limits and out-of-city water service area. The out ofcitz service area includes an area west of the city limits Glen Cove and portions of unincorporated Jefferson County as shown on Service Area Map(,�ttachment 1).A more detailed description of the City of Part Townsend Planning Area can he found in Chapter IV of the Comprehensive Plan. Property Owner: Contact/Representative (if different): Name: City of Port Townsend Name Ken Clow, Public Works Director Address: 250 Madison Street, Suite 2 Address Same City/St/Zip: Port Townsend,WA 98368 City/St/Zip: Same Phone 360-379-5090 Phone: Same Email: kclow .cityofpt.us Email: Same Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Attach additional pages if needed. The City of Port Townsend is updating its 2005 Water System Plan. The Plan is prepared to comply with the requirements of the Washington Deportment of Health 1W17UH1 as set forth in the Washinatan Administrative Cade fWAC1246 29[1- 100. Adoption of this document is a non-project action designed to improve and update the existing Plan. The plan will apply throughout the incur orated limits of the City of Port Townsend areas of unincorporated Jefferson County s eci ied as the out-of-city sery/ce area and where applicable,to users o contractual water service orsupply. This checklist covers the potential significant environmental impacts resulting from the adoptio►?of the Man.Following adoption of this plan, other detailed regulations which implement the pion may,be developed, Future SEPA reviews may be required for p ra'eet actions undertaker:to implement the adopted Plan(i.e., construction of capitol focilities).The City of Part Townsend retains the authority to impose site specific mitigation measures to address probable significant adverse environmental impacts within the City limits or on water system projects where the City assumes lead agency. Under the authority of Chapter 197-11-635 WAC the SEPA documents prepored for Port Townsend's Comprehensive-Pion are incorporated by reference herein•these documents include the Port Townsend Comprehensive Plan. Have any known wetlands or their buffers been identified on the property? ❑ No ❑ Yes If yes, attach wetland report. Wetlands will be evaluated during the design and construction of each capital project. Are there any steep slopes(greater than 15%)on the property? ❑ No ❑ Yes If yes, attach geotechnical report. Steep slopes will be evaluated durinq the design and construction ofeach capital profit. List any environmental information you know about that has been prepared,or will be prepared, directly related to this proposal: Information on water production and consumption will be updated. Water system capacity will be evaluated. (Continued on Page 2) Page 1 of 30 Agency requesting Checklist: City of Port Townsend Date Checklist prepared: May 27, 2014 Proposed timing or schedule (including phasing, if applicable):The Water Svstem Plan will take effect after SEPA determination, Planning Commission Council public hearings, Council adoption and WA Department of Health approval. This update of the plan is scheduled to be completed by September 1, 2014. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? ❑ No X Yes. If yes, explain: The purpose of the 2014 Water System Plan-(2014 WSP) is to update the 2008 Water System Plan(20088 WSP) for a 3- ear period that will be in effect beginning September 1 2014 through September 1 2017. At the end of the period, the City's water treatment plant that complies with the USEPA's Long-Tenn 2 Enhanced Sulfate Water Treatment Rule (LT2) will be completed. The Cit 's current plan, approved in July 2008 is cam rehensive. The Washington Department of Health (DOH met with the City in March 2014--and s ecified sections that would be updated. Other sections do not Reed to be updated and will remain valid for the length of approval of this Plan, DOH and the City agreed that the update would be valid for three years to allow the City to install filtration and evaluate the chegges needed to the system once the filtration system is online. The City has committed to meeting approximately one_y_ear prior to the "iration of this update to discuss the scope of the next water system iolan update. Do you know whether applications are pending for government approvals of other proposals directly affected the property covered by your proposal? ❑ No ❑ Yes. If yes, explain: List any government approvals or permits that will be needed for your proposal, if known: The City of Port Townsend Planning Commission and City Council will hold Public Hearings on the Water System Plan, and the Council will formally ado t the plan as a functional Ian under the City's Comprehensive Plan. The WDOH Office of Drinking Water will approve the final Water System Plan as set forth In the Washington Administrative Code WAC 246-290-100. SEPA Application Submittal Requirements CHECKLIST Completed Checklist Application fee Minor: $773.00 $673.00 — If optional DNS process is used Major: $1,181.00 (i.e. Planned Unit Developments, Full Subdivisions, Commercial projects in excess of 10,000 square feet) ❑ The latest list of tax parcels and their owners within 300 feet of the property, prepared by a Title Company, with said owner's names and addresses typed on mailing labels. (City will supply envelopes.) For minor SEPA, include 1 set of mailing labels and for major SEPA, include 2 sets of mailing labels. ❑ A vicinity map of the area as shown by the Jefferson County Assessor's Office ❑ Three copies of a site plan showing the dimensions and shape of: ❑ Existing lots ❑ All existing or proposed structures/improvements ❑ Existing and Proposed building floor space (if applicable) ❑ Conceptual building elevations (if applicable) ❑ Adjacent streets, alleys, driveways and off-street parking ❑ Utilities, parking, landscape areas, adjacent land uses ❑ All easements, deeds, restrictions or other encumbrances restricting the use of the property, if applicable ❑ Significant natural features such as creeks, wetlands, steep slopes, etc. ❑ The location of any critical areas and/or buffers as described in PTMC 19.05, including all floodplains, lying within or adjacent to the proposed variance; Critical Areas special reports where required by (PTMC 19.05-Critical Areas) ❑ North Arrow and scale If the above site plan is larger than 8-1/2" x 11", provide one 8-1/2"x 11" copy A drainage plan. If there are existing structures on-site, show and calculate the total amount of impervious surfaces (i.e. building roof areas, driveways) in square feet and current method of stormwater management(i.e. downspouts, drywells, etc.) Attach any additional information (reports, studies, maps, illustrations, leases, permits, etc.) that may further describe the proposal or as required by the Development Services Department. Page 3 of 30 SEPA INFORMATION THE PURPOSE OF SEPA The State Environmental Policy Act(SEPA) requires the City to consider the environmental impacts of a proposal before making decisions. The purpose of SEPA is to provide the information to help you and the City identify impacts from your proposal, and to help the City decide whether an Environmental Impact Statement(EIS) is required from a Determination of Significance (DS), or a Determination of Non- Significance (DNS) may be issued. An EIS must be prepared for all proposals with probable significant adverse impacts on the environment. Frequently, however, the impacts of a proposal can be mitigated through certain conditions or voluntary measures agreed to by the applicant. Mitigation measures may include, for example, limiting construction hours to reduce noise, preserving significant tees or habitat, and a variety of other issues regarding the environment. New development proposals may also place an added burden on public services. New residents and employees use public parks, require fire and police protection, and other general government services. These impacts are significant during the first few years after a proposal is submitted to the City, and before the tax the City receives generated by the project. City service providers must cover increasing expanses without compensating revenues. Impact mitigation under SEPA is designed to help reduce the strain on public services. Also, capital costs associated with providing facilities for new residents and employees are not covered by these tax revenues. In a rapidly growing community, existing City taxpayers must make up unpaid short- term operational costs and capital expanses. Unless these impacts are mitigated, current City taxpayers would be put in the position of subsidizing new development and would not realize a full return on their tax dollars. WHEN A CHECKLIST IS REQUIRED The SEPA review process generally begins when someone submits a permit application to the City, for example, a building permit, land use application such as a conditional use or a rezone, grading permits, or any such project where the City is required to issue a permit or approval. This is considered an "action" under SEPA, WAC 197-11-704. EXEMPTIONS TO SEPA To be exempt from SEPA review, the proposed project must be smaller than or equal to the following: 0 The construction or location of any residential structures of nine (9) dwelling units; 0 The construction of an office, school, commercial, recreational, service, or storage building 4,000 square feet in size with 20 parking spaces; 0 Repair, remodel, and maintenance activities (unless associated with a non-exempt proposal); 0 The vacation of streets and roads; 0 The granting of variances based on special circumstances. CRITICAL AREAS Pursuant to the Washington Growth Management Act (GMA), the city requires protection of critical areas within the city limits. These areas, along with protective buffers, include wetlands and streams, frequently flooded areas, aquifer recharge areas, fish and wildlife habitat, and geologically hazardous areas (steep slopes, soils with high erosion rates). Originally adopted by the City Council in November 1992, the ordinance was recently updated (Ordinance 2899, 2005) to incorporate best available science. The Critical Areas Ordinance, as codified in Chapter 19.05 of the Port Townsend Municipal Code, establishes protection standards that minimize development impacts. If your property is in a mapped critical area, or meets the criteria for a critical area, City staff will conduct a site investigation to determine if the mapping is correct. If it is, you may be required to obtain a critical areas permit. Critical areas maps are on display on the third floor of City Hall, 250 Madison Street, in the Development Services Department. Page 4 of 30 COMPLETING A SEPA ENVIRONMENTAL CHECKLIST The Environmental Checklist asks you to describe some basic information about your proposal. Please answer the questions descriptively, but briefly. Be as accurate as possible, and use the most precise information available to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. However, answers to some questions may require expertise or technical assistance from qualified persons. The cost of obtaining such information is the responsibility of the applicant. If you do not know the answer, write, "do not know," or if it does not apply to your proposal, write "does not apply." Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and land use designations. Answer these questions if you can. If you need help, City staff can assist you. The Checklist questions apply to all parts of your proposal, even if you plan to do it over a period of time, or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. THE PROCESS A pre-application conference with City Development Services Department (DSD) staff is required prior to submitting an environmental checklist. Filing a checklist with thorough answers the first time may avoid unnecessary delays later. Within 14 days of determining that an application is complete, the DSD will provide the public and adjacent property owners with notice and an opportunity to comment on the pending threshold determination. The DSD will provide the applicant with two (2) notices of the pending threshold determination posted on two signboards, and one (1) copy of an affidavit of posting. The applicant posts the notices, placing the boards in conspicuous locations on or near the property, and maintains them in place until the determination is issued. The affidavit of posting must be signed, notarized, and returned to the Department no later than seven (7) days after the notices are provided. Upon issuance of the determination, any conditions imposed must be posted on the signboards and remain there until the project has been finaled. The DSD will arrange one (1) publication of the notice to appear in a newspaper of general circulation within the City. Any person will then have a period of 20 days (30 days if a shoreline permit is involved) from the date of publication to submit information and comments to the DSD relating to the project. All comments received will be provided to the proponent. In addition to having the property posted and publishing the notice, DSD staff may opt to hold a public meeting to review the checklist, schedule a public site visit or informal meeting with the proponent, adjacent property owners, or interested citizens, or use any other reasonable method deemed appropriate by the staff. The staff member who is the responsible official will make the threshold determination and issue either a Determination of Non-Significance (DNS), a Mitigated Determination of Non-Significance (MDNS), or a Determination of Significance (DS). An applicant may request in writing early notice if a DS is likely. A DS may not be appealed. If the responsible official finds that a proposal is likely to have some potential significant environmental impacts, the applicant may modify the proposal to reduce such impacts, therefore the MDNS issuance. An MDNS lists specific mitigation measures to be implemented by the applicant to reduce impacts. If the project is approved with specific mitigating conditions, the applicant must post the conditions and return a signed, notarized affidavit of posting, and maintain the posted conditions during construction. The conditions must be removed upon completion of the project. No threshold determination is final until expiration of the 15-day administrative appeal period. If it is appealed, then the determination is final when the decision is made on the appeal. If no written comments have been received on a threshold determination, no appeal is available. A written statement appealing the threshold determination of the responsible official must be filed with the Building and Community Development Director within fifteen (15) calendar days of the date of publication of the threshold determination. If a person has filed comments on the pending determination, submittal of Page 5 of 30 a written appeal letter is required. If a person has not commented previously, both a comment letter and a separate appeal letter must be submitted within the 15-day administrative appeal comment period. The fee to appeal the Director's decision is $200. The fee is waived if a valid petition is signed by 200 Port Townsend citizens and is submitted to the Department within the 15-day appeal period. The appeal must clearly list the names and addresses of each signatory. Decisions on additional necessary permits for a proposal cannot take place until the environmental review process is completed. In addition, no site work, including clearing or grading, may commence prior to completion of the SEPA process. So, while a hearing before the Planning Commission or the Hearings Examiner may be held before the environmental review process is completed, decisions must await completion of SEPA review. The SEPA review process can normally be accomplished within 90 days of the City receiving a complete application, unless the City requests additional technical studies. Please contact a City planner at 360.379.5095 if you have questions. USE OF CHECKLIST FOR NON-PROJECT PROPOSALS: Complete this checklist for non-project proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For non-project actions, the references in the checklist to the words"project", "applicant", and "property or site" should be read as"proposal", "proposer", and "affected geographical area", respectively. For further information, see the Port Townsend Municipal Code, Chapter 19.04, State Environmental Policy Act, or contact the Development Services Department for assistance in completing the checklist, and for information on the procedures for its processing. Page 6 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (mark one): x Flat x Rolling x Hilly x Steep slopes ❑ Mountainous x Other: Areas include varied terrain. The City of Port Townsend water system lies within the Puget Lowlands in the eastern section of Jefferson County. The Olympic Mountains are located to the west and are the source of the river systems that drain to the east into AdmiraltV inlet and Hood Canal. Landforms have been shaped by past glacial periods leaving a complex series of sediments yp to 2,000 feet thick. The Quirn er Peninsula and the City of Port Townsend are characterized by wooded gently rolling, north/south trending hills. Elevations in the water service planning area vary from sea level to approximately 300 feet. Steep wave-cut bluffs along Discovery Bay, the Strait of Juan de Fuca and Puqet Sound are common. The areas that will potentially be affected by the Plan range widely in topographical conditions. For further information regarding the City of Port Townsend. refer to the Comprehensive Plan. b. What is the steepest slope on the site (approximate percent of the slope)? Steep slopes greater than 30% represent a relatively small percentage of the City's total acreage 0.7. or 33 acres). A majority of Port Townsend's existing development has taken place in areas with slopes of less than 15%. Areas of steep slopes are concentrated on the Citv's perimeter, adjacent to the saltwater bodies that surround the area. For further_information, refer to the Comprehensive Plan. C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. The soils within Port Townsend reflect the region's geologic history. Townsend gravelly loam (Tnc) and Clallam gravelly sandy loam (CmC) are the predominant soil.groups within the City. Both of these soil types range from 20 to 40 inches in depth, have low to moderate permeability and compressibility, and are cemented below about two feet. These soils are _generally found on till plains_ and terraces. Hydric soils are present on approximately three percent of the total land area of the City. These 150 acres are primarily situated in areas surrounding wetlands, and in areas Page 7 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY close to the City's shoreline, where the water table is at or near the surface. Representative h dric soil classifications include A new silt loam A B McMurray and Mukilteo peats Mm and Mukilteo series soils (Mu). For further information refer to the Comprehensive Plan. Soils in the vicinity of specific construction projects will be evaluated during the design of each project d. Are there surface indications or a history of unstable soils in the immediate vicinity? If so, describe. Areas with a history of unstable soils exist in a number of locations throughout the Cit . including the vertical bluffs on the southeastern, northeastern and northwestern perimeter of the town. These areas are relatively stable under ordina conditions. However, seismic events of moderate to high magnitude could cause slope failures, or exacerbate erosion and landslide hazards in areas where the bluff is fractured or where talus slopes are low. Approximately 665 acres (14.3%) of Port Townsend's land base is comprised of landslide and erosion hazards. For additional information, refer to the Comprehensive Plan. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Filling and grading rading information will be available and evaluated with the desi n of each Proiect As a non- ro ect action, the proposal does not involve site alterations of any kind. Future Project actions that are not categorically exempt pursuant to Chapter 197-11-800 WA C. and which require issuance of a City license or permit will be subiect to review under the City's SEPA Implementinq Ordinance (Chapter 19.04 PTMC) and the Critical Areas (CA 0) Ordinance (Chapter 19.05 PTMC). After reviewing applications for such project actions the City of Port Townsend maV determine that mi ation measures are necessaa to avoid probable significant adverse environmental impact. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Because the proposal is a non-protect action it will not result in clearing or construction-related erosion. Future proiect level actions which require issuance of any state or local permit or license: and that are not categorically. exempt under Chapter 197- 11-800 WAG will be sub'ect to review under the Cit 's SEPA Implementinq Ordinance (Chapter 19.04 PTMC) and the Critical Areas (CA O) Ordinance (Chapter 19.05 PTMC] or Jefferson County's Comprehensive Plan and Unified Development Code After reviewing applications for such proiect actions the City of Port Townsend or Jefferson Count ma determine that mjti ation Page 8 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY measures are necessary to avoid probable si gnificant adverse environmental impacts. Proper construction practices following City of Port Townsend uidelines should minimize erosion. g. About what percent of the site would be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The ro osa/is a non-project action that does not involve construction of impervious surfaces. As a desi nated Urban Growth Area (UGA), Port Townsend has enacted a Comprehensive Plan that, over time, will result in a variety of urban densities and building intensities throughout the City, which will be supported by the municipal water system. The commercial, manufacturing, mixed use and multi-family zoning desi nations in the southern one-third (113) of the City will likely result in the greatest cumulative total of impervious surfaces (refer to the adopted Land Use Map. and the descriptions of the C-1. C-1 1MU, C- ll. C-11/MU C-11(H), C-lll, M/C, and M-11(A) and 8 designations in the Final Port Townsend Comprehensive Plan). Impervious surfaces could reach or exceed 90% of the building site in the highest density commercial and manufacturing districts. Impervious surface evaluations will be completed during the design of each capital project, h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Because the proposal is a non- roiect action, it does not involve site alterations of any kind. Future project level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be sub'ect to review under the City's SEPA Im lementin Ordinance (Chapter 19.04 PTMC) and the Critical Areas (CA 0) Ordinance (Chapter 19.05 PTMC) Jefferson County's Comprehensive Plan and Unified Development Code. After reviewing a lications for such project actions, the City of Port Townsend or Jefferson County may determine that mitigation measures are necessa to avoid probable si nificant adverse environmental impacts. The use of Best Management Practices for erosion and sedimentation control following the City of Port Townsend Engineerinq Design Standards and Ecology's 2005 Stormwater Design Manual for Western Washington will minimize or avoid impacts to the earth. Page 9 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY 2. AIR a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Because the pr000sal is a non-project action, it will not result in emissions to the air. It is acknowledged, however, that regardless of the ro osed action reviewed herein, continued develo ment activity will increase the amount of air pollution in the Port Townsend Urban Growth Area (UGA) (e.g., through the location of new sources or through increases in automobile traffic). Refer to the Comprehensive Plan for further information. Typical emissions from construction, demolition and construction equipment during construction of new facilities identified in the plan. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No off-site sources of emissions are known. C. Proposed measures to reduce or control emissions or other impacts to air, if any: Future project level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC) and the Environmentally Sensitive Areas (ESA) Ordinance (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan and Unified Development Code. After reviewing applications for such project actions. the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. For construction related activities identified in the capital improvement plan, pro er mufflers and air emissions control devices will be maintained on equipment. Disturbed areas will be wetted to control dust. 3. WATER a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round or seasonal streams, salt waters, lakes, ponds, and wetlands)? If yes, describe the type and provide names. If appropriate, state what stream or river it flows into: Page 10 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY Port Townsend contains a variety of natural and human modified aquatic resources. These include Port Townsend Bay, Admiralty Inlet, the Strait of Juan de Fuca and ponds, wetlands and aquifers. Each of these features has its own hydrological functions as well as other important and sometimes competing functions, such as economic recreational wildlife and fisheries habitat open space and aesthetic functions. S nificant bodies of surface water include Kah Tai Lagoon, the pond at Chinese Gardens, the Port Townsend Municipal Golf Course Pond and the Winona Wetland. There are also numerous perennial and seaso17al wetlands within the City. The unincorporated area of Jefferson County also contains a variety of surface waters including the Big Quilcene and Little Quilcene Rivers. The Big and Little Quilcene Rivers empty into Quilcene Bay on the Hood Canal. These waters are associated with significant wetlands. These waters and wetlands provide similar functions as described above. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, describe the work and attach the available plans. No. Because the action is a non- ro'ect proposal, it will not involve any work over, in or adjacent to the waters described in the response to question #7 above. The City and County will continue to require either a shoreline substantial development permit or a shoreline permit exemption for anZ proLect-related work occurrin within 200 feet of the jurisdictional waters described above. A _Hydraulic Project Approval from the WA Department of Fish & Wildlife would also be required. Operation of the munici al diversions and transmission pipeline will continue to require work in. over and adjacent to various water bodies including the Big Quilcene and Little Quilcene Rivers. 3) Estimate the amount of fill and dredge material that would be placed in or removed from the surface water or wetlands and indicate the area of the site that would be affected. Identify the source of the fill material. Because the p ro osal is a non-project action, it does not involve fill and dredge material. Future project applications that involve the removal or placement of dred ge or fill materials would be subject to review and mitigation under the City's Critical Areas Ordinance, Shoreline Master Program, and the Jefferson County Shoreline Management Master Program. Future protect level actions which require issuance of any state or local permit or license, and that are not categorically exempt under__ Page 11 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY Chapter 197-11-800 WAC will be subject to review under the City's ' SEPA implementing Ordinance (Chapter 19.04 PTMC) and the Critical Areas Areas (CAO) Ordinance (Chapter 19.05 F MC) Jefferson County's Comprehensive Plan and Unified Development Code. After reviewing applications for such proiect actions the City of Port Townsend or Jefferson County may determine that miti ation measures are necessaa to avoid probable si nificant adverse environmental impacts, 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose and approximate quantities, if known. This is a non-project proposal, and does not require water withdrawals or diversions. The Cit l holds a water ri ht of 30 cfs 19.4 m d on the B Quilcene River and 9.56 cfs (6.18 mgd) on the Little Quilcene River. In addition, the Little Quilcene water right contains a storage provision of 2.000 acre-feet per year, and a separate storage rovision for 800 acre-feet Pet-year at City Lake exists for the Bi Quilcene River. Water is used for domestic, commercial and industrial purposes. - The Little Quilcene water ri ht is sub"ect to an instream flow restriction. The City cannot divert water that reduces the flow in the river below 6 cfs. A junior instream right to supply the fish hatche for 25 cfs exists on the Big Quilcene River downstream of the City's diversion. There are several other small downstream domestic and irrigation users with water rights junior to the City on both the Biq and Little Quilcene Rivers. There is currently a flow requirement on the B4q Quilcene River as a cor7dition of the City's Special Use Permit with the US Forest Service mandating a 27 cfs minimum instream flow. 5) Does the proposal lie within a 100-year flood plain? If so, note the location on the site plan. The pr000sal is a non ro'ect action that would affect all areas within Port Townsend's city limits and the areas of Jefferson County specified as the out-of-city water service area. Port Townsend's frequently flooded areas are those lands that have been identified as likely to flood at least once evety 100 years. or sub"ect to a one percent or greater chance of flooding in any year Jefferson County Critical Area Ordinance uses a similar definition for regulatory purposes. Areas of higher elevation surrounding frequently flooded areas may also be at risk if develo ment increases stormwater runoff, thereby raising the Dotential for Page 12 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY _ flooding by modifvinq existing drainage pattems or storage capabilities. Because Port Townsend's flood hazard areas occur principalIV along its marine shorelines most fall within the jurisdiction of the Shoreline Management Act (SMA). Structures in these areas are subject to hazards associated with the effects of wind and water loadinq caused by storm surges or tsunamis. Some problem flood areas also correspond to the location of critical drainage corridors and wetlands throughout the utility service areas. Projects related to implementation of this plan that occur in frequently flooded areas would be subject to review pursuant to Chapter 197-11-800 WAC. Future project level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC and the Critical Areas Areas (CA 0) Ordinance (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan and Unified Development Code. After reviewinq applications for such project actions, the City of Port Townsend or Jefferson County may determine that instigation measures are necessa to avoid probable si gnificant adverse environmental impacts. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. The proposal is a non-project action that will not involve any discharges of waste materials. Discharge of treated wastewater to the Straits of Juan de Fuca will increase relative to increases in indoor water use and population growth. b. Ground Water: 1) Will ground water be withdrawn or will water be discharged to ground water? Give a general description and identify the purpose and approximate quantities, if known. Because the proposal is a non-project action it does not involve withdrawals from or discharges to .groundwater. Outdoor use of water by domestic and commercial customers and use of septic systems result in some unknown quantity of.ground water recharge throughout the water service area. 2) Describe waste material that would be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewa e; industrial, containing the following chemicals; Page 13 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY _ agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve: Because the proposal is a non project action, it does not involve any discharges of waste materials. On-site septic systems can be installed within the City's water service area if they are permitted by Jefferson Count b. Water runoff (including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Because the proposal is a non-project action it will not result in additional sources of runoff. Stormwater drainage issues will be considered during the desi n of new facilities identified in this plan. 2) Could waste materials enter ground or surface waters? If so, generally describe. Proper construction practices will prevent waste materials from entering round or surface waters. Additional evaluation of waste materials will be done during the design of capital projects Future ro ject level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be subiect to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC) and the Critical Areas (CAO) Ordinance (Chapter 19.05 PTMC) or Jefferson Count 's Comprehensive Plan and Unified Develo ment Code. After reviewing applications for such project actions the City of Port Townsend or Jefferson County may determine that miti ation measures are necessary to avoid probable significant adverse environmental impacts. 3) Proposed measures to reduce or control surface, ground and runoff water impacts, if any. The use of Best Management Practices for erosion and sedimentation control and drainage facility design following the City of Port Townsend EngAneering Engineering Desi n Standards and Ecology's 2005 Stormwater Design Manual for Western Washington will minimize or avoid impacts surface water runoff. Additional mitigation measures_ will be evaluated during the design of capital proiects. I Page 14 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY 4. PLANTS a. Check the types of vegetation found on the site: Deciduous tree: X Alder X Maple X Aspen Evergreen tree: X Fir X Cedar X Pine X Shrubs X Grass X Pasture X Crop or Grain Wet Soil Plants: X Cattail X Buttercup X Bulrush X Skunk Cabbage_ Water Plants: X Water Lily X Eelgrass X Milfoil X Other Port Townsend and the out-of-city service areas support a diversity of native and nonnative plants, including all of the s ecies listed above. Native shrubs, herbs, .grasses and wetland plants also exist within the Planning Area. The shorelines support a variety of estuarine and marine aquatic vegetation. b. What kind and amount of vegetation would be removed or altered? Because the proposal is a non-proiect, programmatic action, it would not involve the removal or alteration of vegetation. C. List threatened or endangered species known to be on or near the site. There are no occurrences of threatened or endangered plant species within the Water Service Area. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Because the proposal is anon-project, programmatic action, it does not directly involve landscaping or vegetation enhancement. Vegetation removal in Environmentally Sensitive and Critical Areas are reviewed and conditioned under CitV and County ordinances. Future proiect level actions which require issuance of any state or local permit or license: and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's Page 15 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY _ USE ONLY SEPA Implementing Ordinance (Chapter 19.04 PTMC and the Critical Areas (QA 0) Ordinance (Chapter 19.05 PTMC or Jefferson County's Comprehensive Plan and Unified Development Code. After reviewing applications for such pMtect actions the CitV of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. 5. ANIMALS a. Check any birds and animals that have been observed on or near the site or are known to be on or near the site: Birds: x Hawk x Heron x Eagle x Songbirds x Other: Varied Mammals: x Deer x Bear x Elk x Beaver ❑ Other: Varied Fish: ❑ Bass x Salmon x Trout x Herring x Shellfish x Other: varied The water service area and the source watersheds contain a variety of habitat types that provide shelter, feeding and breeding sites for a number of migrating and indigenous birds pecies. The Jefferson Countv Significant Natural Areas Report prepared by the Admiralty Chapter of the National Audubon Society indicates that urban natural areas, freshwater marsh, eelgrass beds, cliffs undisturbed bluffs and caves are si gnificant tvpes of bird habitat all of which are found in the water service area or watersheds. Other important bird species known to exist within the area include: alcids; great blue herons; common loon; brandt geese; harlequin ducks; pigeon guillemots; coots; ruddy ducks; hooded mergansers; red winged black birds; belted king fishers; and mallard ducks. Large and medium sized mammals such as deer, coyotes, skunks and otters are found within the City limits. Bear, cougar, fox beaver and elk occur in the out-of-town service area and related watersheds. Page 16 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY Fish in the vicinity of the service area include salmon and steelhead species, and other saltwater species, including sun` smelt. Shorelines and the City's water supply watershed also provide habitat for various life stages of these fish. For further information_ please refer to the Comprehensive Plan. b. List any threatened or endangered species to be on or near the site. Threatened and endangered species that may occur in the water service area and Big and Little Quilcene watersheds include bull trout, Puget Sound chinook and steelhead trout and Hood Canal summer-run chum salmon, northern spotted owl, marbled murrelet, and the northern bald eagle. The range of the Southern Resident killer whale listed as an endangered species, includes salt water in the vicinity of Port Townsend. C. Is the site part of a migration route? If so, explain. The water service area and municipal watershed lie within the Pacific Flyway. Consequently, numerous waterfowl use the wetlands ponds and surrounding marine waters as a migratory rest stop. or as a permanent wintering area. d. Proposed measures to preserve or enhance wildlife, if any: Because the proposal is a non- ro'ect programmatic action it does not directly involve impacts to wildlife. However, the Water System Plan does include policies and programs related to water conservation and protecting water quality and habitat within the City's drinking water watershed. Water conservation ensures that there will be water available in the rivers that feed our City water source, and watershed protection measures ensure clean water for City water users as well as for fish and wildlife. In addition to the Critical Areas Ordinance, the Land Use Element of the Comprehensive Plan contains policy subsections, which specifically address Natural Resource Lands & Environmentally Sensitive Areas Water Quality & Management, and Air Quality & Management. The Water Quality & Management Goal 7 directs the City to manage surface, ground, storm, waste, and coastal waters to ensure that Port Townsend's water resources are protected and preserved. The Land Use Element of the Comprehensive Plan also directs the City to develop an interconnected system of open spaces, trails arid parks. One of the potential benefits of this system is that it is intended to link kev wildlife habitat areas, thereby preserving habitat continuity and movement corridors. Page 17 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY Application of the City's SEPA Im lementin Ordinance Cha ter 19.04 PTMC) and Critical Areas Ordinance (Chapter 19.05 PTMC and implementation of the Conn ►ehensive Plat) policies described above will help to preserve and enhance Port Townsend's wildlife habitats. Future proiect level actions which require issuance of any state or local permit or license: and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC) and the Critical Areas Areas (CA O) Ordinance (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan and Unified Development Code. After reviewing applications for such project actions the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it would be used for heating, manufacturing, etc. As_a non-project action, the proposal would not create any additional needs for energy. However. the City's new drinking water treatment facility which uses membrane filtration,will increase the water system electric energy usage. The principal energy sources associated with the planning area are electricity, propane and petroleum. Solar and wind energy are also being advanced as alternative energZ sources. Electrical Power, propane and petroleum have historically all been used for heating, lighting, operation of facilities, electrical appliances and manufacturing. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. As a non-project action, the proposal would not affect solar energy by adjacent properties. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Because the proposal is a non-project action, no specific energy conservation measures are proposed. Future project level actions which require issuance of any state or local permit or license; and that are not categoticaliv exempt under Chapter 197-11-800 WAC Page 18 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY will be subject to review under the Ci 's SEPA Im lementin Ordinance (Chapter 19.04 PTMC) and the Critical Areas Ordinance(CAO) (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan and Unified Development Code. After reviewinq applications for such project actions, the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. Because the proposal is a non-project action no environmental health hazards are posed. 1) Describe special emergency services that might be required. Because the proposal is a non-project action. no environmental health hazards are posed. 2) Proposed measures to reduce or control environmental health hazards, if any: Because the proposal is a non-project action, no emergency services will be required. Future project level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC) and the Critical Areas Ordinance (CA 0) (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan. After reviewing applications for such project actions, the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid prob able significant adverse environmental im acts. b. NOISE 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Because the proposal is a non-project action it will not be affected by, noise. Page 19 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Because the proposal is a non-project action it will not generate noise on either a short or a long-term basis. However, noise levels will inevitablV increase alon g with the overall increases in the City's population and employment base. Growth will increase the number of residential and business noise sources. 3) Proposed measures to reduce or control noise impacts, if any: Because the proposal is a non-erect action, none are proposed. 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? The proposal is to adopt a 2014 Water System Plan that includes WA Department of Health required elements for ongoing operations and maintenance of the water utility, water use efficiency, water quality and watershed protection measures and --providing for future water service to land within the City of Port Townsend and areas of unincorporated Jefferson County— the City's water service area. The purpose of the 2014 Water System Plan 2014 WSP is to update the 2008 Water System Plan 2008 WSP for a 3-year period that will be in effect beginning September 1 2014 through September 1 2017. At the end of the period, the Cis wafer treatment planf that complies with the USEPA's Long- Term 2 Enhanced Surface Water Treatment Rule (LT2) will be completed. The City's current plan, approved in July 2008 is comprehensive The Washington Department of Health DOH met with the City in March 2014 and specified sections that would be updated Other sections do not need to be updated and will remain valid for the length of approval of this Plan. DOH and the City agreed that the update would be valid for three years to allow the City to install filtration and evaluate the than es needed to the system once the filtration system is online. The Water System Plan is a functional element of the City Comprehensive Plan that provides a more detailed report on existing conditions within the City. The plan implements the goals and policies of the Cit of Port Townsend Comprehensive Plan and is consistent with land use regulations adopted in accordance with the Comprehensive Plan. The City Comprehensive Plan includes Page 20 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY a capital improvement element for the City of Port Townsend Water Utility. The Water System Plan, through provision of water service to Port Townsend and specified areas of Jefferson County, enables potential construction of certain residential, commercial and industrial facilities in accordance with adopted land use regulations. The Plan also includes a service area definition for the out of city service area b. Has the site been used for agriculture? If so, describe. Because this is a non-protect review, It is unknown whether any water related capital pLojects,-operational activities or prograrns will impacts agricultural activities at this time. Within the water service area Port Townsend has several properties that are used for agricultural projection, but does not have any land exclusively zoned for agricultural uses. Most of these properties have individual wells that provide them with irrigation water. In Jefferson County— outside the City limits, the R-1 zone allows for a wide range of a ricultural uses and the R-11 zone allows selected forms of agriculture. C. Describe any structures on the site. The water service area for the City of Port Townsend contains a diversity of residential, commercial, manufacturing, and ublic/institutional structures including many Victorian era homes and downtown commercial and public buildings. d. Will any structures be demolished? If so, what? Because the proposal is a non-project action, it will not involve the demolition of any structures. e. What is the current zoning classification of the site? The Port Townsend Comprehensive Plan shows zoning classifications with the City and the Jefferson County Comprehensive Plans shows zoning within the County. Port Townsend Comprehensive Plan, was adopted in June, 1996 and last updated in 2005. The Jefferson County Comprehensive Plan was adopted in 1998 and last revised in 2004. Both of these plans have processes eve!y year for amendments. f. What is the current comprehensive plan designation of the site? Page 21 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY The Port Townsend Comprehensive Plan shows zonin classifications with the City and the Jefferson County Cam mehensive Plans shows zoning within the Count V. Port Townsend Comprehensive Plan, was adopted in June, 1996 and last updated in 2005. The Jefferson County Comprehensive Plan was adopted in 1998 and last revised in 2004. Both of these plans have processes every year for amendments. g. If applicable, what is the current Shoreline Master Program designation of the site? None of the Water System Plan elements directly relate to the Shoreline Master Program. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. A variety of environmentally sensitive areas occur within the Water Service Area. The City of Port Townsend maintains a map showing specific locations of environmentally sensitive areas. Designation of the Critical Areas in the out-of-citv service area in Jefferson County is on file with Jefferson County_ i. Approximately how many people would reside or work in the completed project? Because the proposal is a non-project action this question is inapplicable. The City of Port Townsend serves approximately 9933 residential customers. and an average of 73._000 per month temporary users. j. Approximately how many people would the completed project displace? Because the proposal is a non-project action no dis lacement impacts are anticipated. k. Proposed measures to avoid or reduce displacement impacts, if any: Because the proposal is a non-project action, no displacement impact mitigation is proposed. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The proposal is a non-project action,. however it is a functional plan which implements and is consistent with the adopted Port Page 22 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY _ USE ONLY Townsend Comprehensive Plan. Future project level actions which require issuance of any state or local permit or license and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the Cit 's SEPA implementing Ordinance Chapter 19.04 PTMC and the Critical Areas Ordinance (CA 01 (Chapter 19.05 PTMC or Jefferson County's Comprehensive Plan. After reviewin applications for such pEptect actions the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Because the proposal is a non-project action it would not affect the provision of housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. As a non-project, programmatic action, the proposal does not involve the elimination of anV existing housing units. Future project level actions which require issuance of any state or local permit or license and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC and the Critical Areas (CA O) Ordinance (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan. After reviewing applications for such protect actions, the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. C. Proposed measures to reduce or control housing impacts, if any: None proposed or needed. 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building _ Page 23 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY material(s) proposed? As a non-project programmatic action, the proposal does not involve the construction of an structures. b. What views in the immediate vicinity would be altered or obstructed? As a non-p oiect Programmatic action, the pnoposal does not involve the alteration or obstruction of views. C. Describe proposed measures to reduce or control aesthetic impacts, if any: Future M ect level actions which require issuance of any state or local permit or license and that are not categotically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC) and the Critical Areas (CA 0) Ordinance (Chapter 19.05 PTMC or Jefferson County's Comprehensive Plan. After reviewing applications for such project actions, the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental_ impacts. 11. LIGHT AND GLARE a. What type of light or glare would the proposal produce? What time of the day would it mainly occur? Because the proposal is a non-project programmatic action it would not produce any light or glare. Levels of artificial Aghting lighting and glare will increase with population and business growth in the Planning Area. b. Could light or glare from the finished project be a safety hazard or interfere with views? Because the proposal is a non-project action, it would not create light or glace safety hazards or view obstructions. Future proiect level actions which require issuance of any state or local permit or license: and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementing Ordinance (Chapter 19.04 PTMC) and the Critical Areas (CA O) Ordinance (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan. After reviewing applications for such project actions, the City of Port Townsend or Page 24 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY Jefferson County may determine that miti anon measures are necessary to avoid probable significant adverse environmental impacts. C. What existing off-site sources of light or glare may affect your proposal? As a non- M ect action the proposal would not be affected by li ht or lare. d. Proposed measures to reduce or control light and glare impacts, if any: No measures are proposed. Future project level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be subiect to review under the City's SEPA Im lementin _Ordinance (Chapter 19.04 PTMC) and the Critical Areas CAO) Ordinance (Chapter 19.05 PTMC) or Jefferson County's Comprehensive Plan. After reviewing applications for such proiect actions, the City of Port Townsend or Jefferson County may determine that miti atjon measures are i iecessary to avoid probable significant adverse environmental impacts. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Please refer to the City's Parks, Recreation & Open Space Functional Plan (Parks Plan) for an inventory of existing facilities and recommendations to meet future needs. The Big Quilcene River and Little Quilcene River watersheds which provide surface water for the Port Townsend waters stem are substantially within the Olympic National Forest and are managed for multiple uses including recreation. b. Would the proposed project displace any existing recreational uses? If so, describe. No, because the proposal is a non-project action it would not affect existinq recreational uses. C. Proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the project or applicant, if any: Page 25 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY _ USE ONLY ~None required. The City of Port Townsend is under an Agree Notice of Correction with the WA Department of Health for the City's Drinkinq water supply to provide additional watershed controls in the form of monitoring and public education for people recreatinq in the municipal watershed. 13. HISTORICAL AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. Because the proposal is a non-project action it would not directly affect historical sites. Port Townsend contains numerous'national and state listed historic places, with the highest concentrations occurring within the limits of the Port Townsend National Register Historic District. The National Register Historic District includes the downtown area from Point Hudson to Polk Street and the area on the bluff irregularly bounded by Kearney and Walker streets on the south and Blaine and Taft streets on the west. There are over 700 residences and 60 commercial buildin s within the Historic District. The downtown business area includes approximately 40 buildings that are on the National Register of Historic Places. The boundaries of the National Register Historic District also encompass Point Hudson. The white clapboard buildings constructed in 1934 were built as part of the depression-era public works proiects and were designed to serve as a quarantine area for the U.S. Customs operation. Another site of considerable historic value to Port Townsend is Fort Worden State Park A1ong with Forts Casey and Flagler, Fort Worden was among three coastal artillery installations established in the late 1890s to protect the entrance to Puget Sound. As of January 1988 37 Port Townsend properties were listed on the National Register of Historic Places. Fifty-two (52) buildings were identified as-pivotal, prims or secondaa on the map which accompanied the certification of the Port Townsend Historic District in Mav of 1976 i.e. one 1 ivotal twenty-four(24Yprimary, twenty-seven (27) secondaryj. Most of the properties listed on the National Register are located in the Historic District and in loo established nei hborhoods within the limits of the oti final fatted town site. The Washington State Office of Archaeology and Historic Preservation lists several sites in Jefferson County in the database Page 26 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY for historic, cultural, and archaeological sites. Individual proiecfs will be reviewed through the SEPA process to avoid site impacts to these resources. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site: Please refer to the response to the guestion #13a, above, regarding historic resources. To date no general archaeological study of the City, or any major portion of it, has been conducted, although 19th century photographs of the City suggest where archaeologically important sites may exist. Wessen & Associates conducted an archaeological study of the Thomas Oil site in July 1990. Although no archaeological deposits were found, the study concluded that ' iven the paucity of known archaeological materials in the Point Hudson area even a small remnant de osif would have considerable historical and cultural significance." Wessen . C. Proposed measures to reduce or control impacts, if any: Regardless of the proposed code amendments, existing regulations, including the historic preservation provisions embodied within the Waterfront Design Guidelines Overlay District (Chapter 17.28 PTMC) and the Design Review provisions (Chapter 17.38 PTMC) of the zoning code would continue to be used to guide development within the National Register Historic District. 14. TRANSPORTATION a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. Because the proposal is a non- ro"ect action. it is not directl served by public streets. Port Townsend has approximately 100 miles of platted public ri hts-of-wa . The vast maLority of Port Townsend's roads are neighborhood or local access roads. The Quimper Peninsula is accessed by State Route 20 from Snow Creek to Port Townsend and State Route 19 through the Tri Area. The out of town water system components are accessed by US Forest Service roads and the transmission pipeline crosses numerous public and private rights of ways. b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Because the proposal is a non-project action, it does not directly _ Page 27 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY affect public transit operations. Jefferson Transit provides service to the Planning Area and focuses primarily upon providing public transportation services to transit-dependent persons in Jefferson County. C. How many parking spaces would the completed project have? How many spaces would the project eliminate? Because the proposal is a non-pM ect action, it does not directly involve the creation or elimination of parkinq spaces. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). As a non-project action, the proposal will not require new roads or streets or improvements to roads or streets. Water system improvements are typically scheduled to coordinate with city and county road improvements. A growing population served by the water system will require new and improved street access. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. The proposed plan would not use water, rail, or air transportation facilities. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur: Because the pal is a non-project action. it would not directly generate any vehicle trips. g. Proposed measures to reduce or control transportation impacts, if any: None are proposed. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: Fire protection, police protection, health care, schools, other)? If so, generally describe. Because the proposal is a non- Mject action it will not generate a Page 28 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY requirement for increased public services. The plan provides analysis of existing conditions with regard to water service available for potable use and fire protection. This analysis allows for development of improvement recommendations consistent with the goals and policies of the City Comprehensive Plan. The Port Townsend Comprehensive Plan defines the City's intended measures to reduce or control impacts of.growth with regard to water service and related public services. b. Proposed measures to reduce or control direct impacts on public services, if any: Implementation of the Capital Facilities & Utilities Element of the Port Townsend ComprehensivePlan will reduce or control future impacts to public services. Future project level actions which require issuance of any state or local permit or license; and that are not categorically exempt under Chapter 197-11-800 WAC will be subject to review under the City's SEPA Implementin_g Ordinance (Chapter 19.04 PTMC) and the Critical Areas Areas (CA 0) Ordinance (Chapter 19.05 PTMC or Jefferson Count's Comprehensive Plan. After reviewing applications for such proiect actions. the City of Port Townsend or Jefferson County may determine that mitigation measures are necessary to avoid probable significant adverse environmental impacts. 16. UTILITIES a. Check which utilities are currently available at the site: X Electricity ❑ Natural Gas X Water X Refuse Service X Telephone X Septic System X Sanitary Sewer ❑ Other With the exception of piped natural gas, all of the above listed utilities are found within a portion of, or throughout, the Port Townsend Planning Area. For more detailed information. please refer to the Comprehensive Plan. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity that might be needed. As growth and development occurs, demands for public services will increase. The Capital Facilities & Utilities Element of the Comprehensive Plan is intended to ensure that new growth and development is provided with adequate public services and facilities concurrent with the approval of new development. The water system '-'iarx for the out-of-city service area describes the provisions the utility will make to meet the needs of.growth based on Jefferson County future land use regulation. Page 29 of 30 Please print in ink or type each answer. Please do not write in EVALUATION area designated "Evaluation." FOR AGENCY USE ONLY SIGNATURE The above answers are true and complete to the best of my knowledge. I understand the lead agency is relying on this information to make its decision. In addition, I understand that review under SEPA does not constitute approval of a proposal; compliance with local, state, and federal regulations applicable to the proposal shall constitute approval. SEPA approval is based on the information I have provided. If the information is found to be inaccurate, approval could be withdrawn. Authorized Signature DAW Submitted I declare under penalty of the perjury laws that the information I have provided on this form / application is true, correct and complete. Signature: I' Date: Page 30 of 30 City of Port Townsend " d Development Services Department y`f SEPA RULES SUPPLEMENTAL SHEET FOR NON-PROJECT ACTIONS WAC 197-11-960 Because these questions are very general, so it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity of at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? The proposed adoption of the 2014 Water System Plan will not alter any existing requirements for environmental review under Chapters 19.04 or 19.05 PTMC (i.e., the SEPA Implementing Ordinance and the Critical Areas Ordinance). Environmental review for plan related proposals in the out-of-city service area would be conducted under existing Jefferson County Ordinances. These provisions will continue to be employed in the review and mitigation of individual project applications. Possible indirect effects of the proposed action relating to water, air, environmental health, and noise are summarized below: Withdrawal and/or Discharges to Water: The City of Port Townsend Water System Plan outlines a program to utilize existing surface water and groundwater rights. No additional withdrawal or discharges to water are proposed in the Water System Plan. Emissions to air, release o 'toxic or hazardous substances and noise: The potential adverse environmental impacts of urban growth relating to increased emissions are not significant as discussed in the Port Townsend Comprehensive Plan. Proposed measures to avoid or reduce such increases are: Withdrawals o Sur ace and Ground Water: The Conservation Chapter of the Water System Plan outlines the City's programs to promote the efficient use of water resources. City of Port Townsend Water System Plan Update:\\citygis\PWEngineering\Water\Water System Plan\SEPA review\2014 update\SEPA Supplemental Sheet for Non-Project Actions 2014 WSP Update 05.27.14.doc Page 1 Emissions to air, release o toxic or hazardous substance, and noise: No measures are proposed beyond project specific environmental review and enforcement of implementing ordinances in compliance with the City Comprehensive Plan. 2. How would the proposal be likely to affect plants, animals, fish, or marine life? The Water System Plan will not directly affect plants, animals,fish or marine life. Growth and development within the service area may negatively impact plant and animal populations. Surface water withdrawals at the Big and Little Quilcene Rivers could impact these resources through lower instream flows that affect salmonid migration, spawning and rearing habitat- although flow restrictions are in place through a Special Use Permit with the US Forest Service - that will mitigate these impacts. Proposed measures to protect or conserve plants, animals, fish, or marine life are: Adoption of this Water System Plan would not require inclusion of any specific measures to conserve plants, animals,fish, or marine life. However the plan recognizes and incorporates the recommendations of the Dungeness/Quilcene Water Resources Pilot Plan and Watershed Management Plan for the Quilcene-Snow Water Resource Inventory Area (WRIA-17). 3. How would the proposal be likely to deplete energy or natural resources? The proposal would not directly deplete energy or natural resources, except through water use. Growth and development in the service area will consume energy and natural resources. Proposed measures to protect or conserve energy and natural resources are: The Water System Plan includes a Water Conservation Chapter that outlines strategies for conserving water. 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible for under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? The proposal would not affect environmentally sensitive areas or areas designated for governmental protection. Proposed measures to protect such resources or to avoid or reduce impacts are: The Water System Plan includes a Cooperative Watershed Protection Program which includes strategies within the municipal watershed that protect downstream water quality City of Port Townsend Water System Plan Update:\\citygis\PWEngincering\Water\Water System Plan\SEPA review\2014 update\SEPA Supplemental Sheet for Non-Project Actions 2014 WSP Update 05.27.14.doc Page 2 in the Big and Little Quilcene Rivers. Otherwise, no specific measures have been proposed. 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Availability of water within the designated service area shall be consistent with the adopted land use designations within the City of Port Townsend and the shoreline designation in the City of Port Townsend Shoreline Master Program. Impacts of growth and development are not likely to be significant. Potential impacts are assessed in the City of Port Townsend Comprehensive Plan. In the out of city service area the Plan is not likely to affect land or shoreline use. Adoption of land use designations will be reviewed under the Jefferson County SEPA ordinance and must comply with the Growth Management Act. Proposed measures to avoid or reduce shoreline and land use impacts are: No specific measures have been proposed. The Water System Plan contains policies that assure compatibility with adopted land use designations including those within the Shoreline Management Master Program jurisdiction within the City of Port Townsend and in the unincorporated areas of Jefferson County. 6. How would the proposal be likely to increase demands on transportation or public service and utilities? The proposal provides mechanism to assure adequate public water service and supply to the adopted water service area. Proposed measures to reduce or respond to such demand(s) are: Not applicable. 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. No aspect of the proposal is in conflict with local, state, or federal laws, or requirements for the protection of the environment. The proposal complies with the Washington State enforcement of the Federal Safe Drinking Water Act and the Washington State Department of Health requirements under 246-290-100 WA regarding water system plans. ACKNOWLEDGMENT I acknowledge that all information provided in this checklist and all attached material is true and correct to the best of my knowledge. I understand the lead agency is relying on this information to make its decision. In addition, I understand that review under SEPA does not constitute City of Port Townsend Water System Plan Update:\\citygis\PWEngineering\Water\Water System Plan\SEPA review\2014 update\SEPA Supplemental Sheet for Non-Project Actions 2014 WSP Update 05.27.14.doc Page 3 approval of a proposal; compliance with local, state, and federal regulations applicable to the proposal shall constitute approval. (Check with appropriate agencies to determine what approvals are required.) SEPA approval is based on the information I have provided. If found inaccurate, approval could be withdrawn. Authorized Signature: r Date Submitted: June 3, 2014 City of Port Townsend Water System Plan Update:\\citygis\PWEngineering\Water\Water System Plan\SEPA review\2014 update\SEPA Supplemental Sheet for Non-Project Actions 2014 WSP Update 05.27.14.doc Page 4 SEPA FINAL DETERMINATION OF NONSIGNIFICANCE Proposal: City of Port Townsend 2014 Water System Plan update The City of Port Townsend is seeking to adopt a Water System Plan(WSP) update. The purpose of the WSP update is, in part, to ensure compliance with requirements set forth by the Washington State Department of Health(WDOH) under the state's administrative rules found in Chapter 246-290-100 WAC. Specifically,the 2014 WSP update provides: • Basic planning data, such as population and service connections, production and consumption amounts, and major users; • A systems analysis of capacity factors that affect overall water system operation; • A 3-year Capital Improvement Plan(CIP) outlining planned system improvements; and, • A corresponding 3-year budget, with a summary of the current rate structure and rate changes necessary to fund the planned capital improvements. The adoption of this document is a non-project action designed to improve and update the 2008 WSP adopted by the City Council via Ordinance 2954. File Reference: LUP14-037 Proponent: City of Port Townsend, Public Works Department 250 Madison Street, Ste. 2R Port Townsend, WA 98368 Location: The SEPA review for this code amendment will apply to properties located within the City of Port Townsends Water Service Area(see City of Port Townsend 2008 Water System Plan for detailed maps). Lead Agency: City of Port Townsend, Development Services Department The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information in file with the lead agency. This information is available to the public on request. City Council Open Record Public Hearing: At least one open record public hearing will be held before the City Council prior to plan adoption. The date for this hearing(s) has been scheduled for August 4, 2014 beginning at or about 6:30 p.m. in Council Chambers of Port Townsend's City Hall, located at 540 Water Street. Separate public notice of the hearing will be provided in accordance with municipal code. 1 Responsible Official: Rick Sepler, AICP Director, Development Services Department Staff Contact: John McDonagh, DSD Senior Planner Address: City of Port Townsend 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 344-3070 Date: July 16, 2014 Signatur 2 TO: All Permit and Review Authorities ENVIRONMENTAL RECORD The environmental review consisted of analysis based on the following documents included in the environmental record. DOCUMENTS/REFERENCES: Exhibit A: Environmental Checklist, dated June 5, 2014 Exhibit B: 2014 Water System Plan(WSP) update Exhibit C: Notice of Determination of Non-Significance, Adoption of Existing Environmental Documents and Availability of SEPA Checklist, dated June 18, 2014. Exhibit D: 2008 City of Port Townsend Water System Plan(including SEPA checklist and DNS issued for its adoption. City File No LUP06-135) Unless otherwise noted, the above information is available for review at the Development Services Department, City Hall, 250 Madison Street, Suite 3,between the hours of 8 am to 5 pm Monday through Friday. I. PROPOSAL DESCRIPTION The City of Port Townsend is seeking to adopt a Water System Plan(WSP)update. The purpose of the WSP update is, in part,to ensure compliance with requirements set forth by the Washington State Department of Health(WDOH) under the state's administrative rules found in Chapter 246-290-100 WAC. Specifically,the 2014 WSP update provides: • Basic planning data, such as population and service connections, production and consumption amounts, and major users; • A systems analysis of capacity factors that affect overall water system operation; • A 3-year Capital Improvement Plan(CIP) outlining planned system improvements; and, • A corresponding 3-year budget, with a summary of the current rate structure and rate changes necessary to fund the planned capital improvements. The adoption of this document is a non-project action designed to improve and update the 2008 WSP adopted by the City Council via Ordinance 2954. II. PERMITS/APPROVALS REQUIRED PRIOR TO CONSTRUCTION While not a construction-oriented proposal, approval of the 20104 Water System Plan update by Port Townsend City Council and Washington State Department of Health(WA DOH) is required. Subsequent capital improvement projects, including extension of water lines greater than 10" 3 diameter, may be subject to further project-level SEPA review unless they are found to be categorically exempt under Chapter 197-11-800 WAC. Where system projects would occur within the City's water service area lying outside of city limits, permits from Jefferson County may be required. Some projects related to surface water diversion or storage may require Hydraulic Project Approval from the Washington State department of Fish and Wildlife. III. PUBLIC COMMENT No public comment was received in response to the Notice of Pending Threshold Determination (Exhibit Q. IV. RESPONSIBLE OFFICIAL'S AMENDMENTS TO CHECKLIST ITEMS The applicant's environmental checklist is incorporated by reference. Two (2) prior SEPA. Threshold Determinations were issued as part of the adoption process for the 1998 and 2008 Water System Plans. Both of these prior determinations are adopted by reference. Consistent with the requirements of WAC 197-The following discussion is intended to address potential environmental impacts not addressed by the environmental checklist. The checklist covers the potential significant environmental impacts resulting from the Water System Plan. Following adoption of this plan, other detailed regulations that implement the plan may be developed. Future SEPA reviews may be required for project actions undertaken to implement the adopted Plan(i.e., construction of capital facilities). V. ANALYSIS AND THRESHOLD DETERMINATION The Environmental Checklist(Exhibit A) adequately addresses the environmental impacts of the proposed Plan. Subsequent non-exempt project actions will require separate, individualized SEPA review. No probable significant adverse impact on the environment have been identified, therefore issuance of a Determination of Non-significance is warranted. 4