HomeMy WebLinkAboutBLD00-237Watemun ad Katz Building
181 Quincy Street Suite 301
Port Townsen4 WA 98368
Plwne (360) 379-3208 Fax (360) 385-7675
CITY OF PORT T
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-237R-I Issued: 12/18/00 Parcel Number: 972-903-501
Job Address: 910 54th Street Zoning: R-11 Type: VV=N Occupancy: UU=1
Total Occupant Load:N/C Nature of Work: SFR Addition: Revision #1: unheated storaee
Owner: Jim and Helen Everett
Contractor: ,QED Builders
301-2802
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUH2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
sLAB
Setbacks ~ Z~ Z l C
~~ /
Forms
Monolithic Stab Foundation
Reinforcement
Anchor Bolts
FRAMING /J
Walls 1 /~/~
~! (`/',
(
Ceiling ~
Roof
Blocking between rafters
Rafter Positive Connection
Attic Venting -gable end & eave
DRYWALL NAII.ING
Walls
Ceiling
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Bw7ding Pmnil #B[,D00-237R-1
Smoke Detectors throughout existing construction per
1997 LTBC; battery powered okay
House Numbers - 5" high
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pa~
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by
required inspections.
5, Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass 1"inal inspeMion on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspeMions are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-SD86 riot to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman and Katz Huilding
181 Quincy Street Suite 301
Port Townsend, WA98368
Phone (360) 379.3208 Fax (360) 383-7675
C
i_
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: SLDOO-237 Issued: 12118!00 Parcel Number: 972-903-501
Job Address: 910 54th Street Zoning: R-11 Type: V_N Occupancy: UU=1
Total Occupant Load:N/C Nature of Work: SFR Addition: caruort and unheated storaee (see R-11
Owner: Jim and Helen Everett
Contractor: OED Builders
301-2802
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF,nTTTRF,n TNSPECTIONS
APPROVED/DATE
FOOTINGS -per engineered detail / Z [ld
Setbacks l Z
c
Post Footings
Reinforcement
Post Base
FRAMING -per engineered detail
Walls
Knee Brace
Lag Bolts
Beam-to-Beam Connection
Post-to-Beam Connection
Roof
Rafter Positive Connection - H3
Engineered Connection Rafter to Ridge Beam
Engineered Hangers Rafter End to Ridge Beam
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
BuildingPmnit #BLD00.737
FINAL
Smoke Detectors throughout existing construction per
19971:IBC; battery powered okay
House Numbers - 5" high
Final -Building
GENERAL CONDTITONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall. par
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca1138S2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval urior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2