Loading...
HomeMy WebLinkAboutBLD00-236wstemen ~ xatz Hdmu,s tat Q~r surn, s~k 3ot Port Townsend WA 98366 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-236 Issued: 12/12/00 Parcel Number: 957307802 Job Address: 409 Walker Street #3 Zoning: RR=II Type: VV=N Occupancy: R_3 Nature of Work: Realace single sane windows with double glazed Milgard windows - 8 in apartment unit and 1 window at ton of landing -using existing rough openings. Owner: Robert Dishington Contractor: Owner 385-0562 GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE • FRAMING/FINAL: Windows -safety glazing where applicable per attached details. Escape Windows -applicable in bedrooms if enlarging existing window sizes Window Ufactor - .40 or better (electric heat) NFRC window stacker must be on windows at inspection time Air Seal FINAL Smoke Detectors throughout house per 1997 Uniform Building Code; battery powered smoke detectors adequate in existing construction House Numbers -check for 5" high Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 r~~ astooo-zsc GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down whilethis is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6: The Building Department is unable to pass final inspeMion on your project until Public. Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works annroval must be received prior to schedulin¢ the Buildine DeoartmenYs final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2