HomeMy WebLinkAboutBLD00-236wstemen ~ xatz Hdmu,s
tat Q~r surn, s~k 3ot
Port Townsend WA 98366
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-236 Issued: 12/12/00 Parcel Number: 957307802
Job Address: 409 Walker Street #3 Zoning: RR=II Type: VV=N Occupancy: R_3
Nature of Work: Realace single sane windows with double glazed Milgard windows - 8 in
apartment unit and 1 window at ton of landing -using existing rough openings.
Owner: Robert Dishington Contractor: Owner
385-0562
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS APPROVED/DATE
•
FRAMING/FINAL:
Windows -safety glazing where applicable per
attached details.
Escape Windows -applicable in bedrooms if
enlarging existing window sizes
Window Ufactor - .40 or better (electric heat)
NFRC window stacker must be on
windows at inspection time
Air Seal
FINAL
Smoke Detectors throughout house per 1997
Uniform Building Code; battery powered
smoke detectors adequate in existing
construction
House Numbers -check for 5" high
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r~~ astooo-zsc
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down whilethis is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6: The Building Department is unable to pass final inspeMion on your project until Public. Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works annroval must be received prior to
schedulin¢ the Buildine DeoartmenYs final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2