Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-234
Walmem & Katz Buildwg ]81 Quincy Stied, Suite 301 Poet touuen~ WA 98366 P]nne: (360) 379-3108 Fu: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-234 Issued: 12/27/00 Parcel Number: 989800046 Job Address: 823 Commerce Loop Zoning: PTBP PUD Type: VV=N Occupancy: F-1 Occupant Load: 21 Nature of Work: Construct Manufacturine Building Owner: Port Townsend Business Park, LLC Contractor: F.P,H. Construction, Inc. c/o 1" Western Development Bob Mathwig 360-731-3810 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -See Labor & Industries ****Hours of construction are limited to 7 a.m. to 6 n.m. Mondav throuPh Friday and prohibited on weekends and national holidays**** REOiTiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 -inspection required prior to foundation work FOOTINGS Setbacks ~Z ~/©7 Footings Forms Reinforcement LIFER FOUNDATION -per engineering R-10 rigid @ perimeter - 24" vertical / ~~/~jr~ Stem Wall l v/ `~~ Forms Reinforcement Anchor Bolts - 5/8" with 2" x 2" x 3/16" washers Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 5 REQUIRED INSPECTIONS APPROVED/DATE i PLUMBING -Barrier Free design required Rough-in (D-W-V & clean outs) ~~ n,,,,,,,,,~ 2~7/~yJ ~`D ~ ~ " ~ Water supply ~ ~`~" " / "~ LPG su ly 'pe insulation ~~ ~~ ~ n r ' (/ e reduction valve if> 80psi l ~ Hose bibs - backflow protection require Water heater Seismic restraint 2 places ~ ~~ ,c (//~ 7l~ /` -, (~ ~ b PR&T valve drain to eacterior ( R-10 if electric placed on slab MECHANC)iAL LPG forced air furnace w/ ductwork 2 ~ ~~ Combustion air ~ J Heat source equipment & contro s Factory applied nameplate Manu's operating instructions attached Unit identified for area served Access and work space for maintenance Disconnect Condensate drain to approved location NREC temperature zones Thermostat controls Deadband control Nght setback w/7 different day types ampers Ducting uc R-7: supply & return in enclose ceiling space R-3.3: supply & return in conditioned space w/air temperature <55 or >105 Source specific fan w/exhaust terminus 3' from building openings (bath fans) Fresh air via building openings r ~_ Ca1148 hours before you dig for utility line locates i-800-424-5555 Page 2 of 5 R UIRED INSPECTIONS • APPROVED/DATE Permit q BI.D00-I34 FRAMING -Minor Improvement Permit approval required prior to final Walls r ~/~~~ Weather resistive barrier Engineered shear walls Front & rear walls nailing: 7/16" plywood w/8d @ 6" o.c. edges, 12" o.c. field Roof Eng'd truss plan required at inspection ~/~ ~~~ Truss positive connection ~ `~J o / Attic ` Drag stop per 3000SF of attic space Venting Attic access Posts, beams & headers Fireblocking @ 10' o.c. horz. & vert. Air seal Windows - U-factor:.90 max. NFRC window sticker must be on windows at inspection time Doors - U-factor:.60 (includes roll-ups) CMU FAtyADE @ CORNERS (brick) Wall ties 22 gage x'/," 24" o.c. w/hook engaging ~~~~ horizontal joint reinforcement wire (9 B.W. gage) Stud spacing 2x4 @ 16" o.c. & 2x6 @ 24" o.c. max. Approved paper over sheathing INSULATION 1 I l '' Wa l R- Ceiling R-30 ~~ ~~ // ~~/~ Z Baffles ! VAPOR BARRIER Paint, kraft paper or 4 mil visqueen DRYWALL NAILING ,.' ~/'~` Walls 4 Ceiling LIGHTING See approved plans and NREC lighting summary Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 5 ~~ REQUIRED INSPECTIONS APPROVF.T1/iIATF. PARKING call John McDonagh @ BCD, 379-5085, for inspection 1 Barrier Free Van Accessible space required - - - -- - - - - - LANDSCAPING -plan to be submitted for review and approval; landscaping installed prior to final inspection Per PUD; call John McDonagh @ BCD, 379-5085 for inspection FINAL Property address posted w/ 5" numbers Fire Department signoff Public Works signoff Electrical signoff (L&I) Insulation certificate Vapor barrier paint certificate (if applicable) Barrier Free Access Plumbing MechanicaUHeating Exits Signs & Illumination ~ /3 / /O Final -Building l/ ll GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's renistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shad be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. t)wner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Pmnit # BLD00.23M1 s • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. A Temporary Certificate of Occupancy (TCO) request requires minimum 72 hours notice. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 x 1