W atennan and Katz Building
I81 Quincy Slreel Suite 301
Port Townsend, WA 98368
Plane (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaI1385-2294 for Inspection
Permit Number: BLDOO-231R-1 Issued: 1117101 Parcel Number: 936-300.503
Job Address: 1231 Milo Street Zoning: R_II Type: VV=N
Occupancy: RR=3 Total Occupant Load: N/C
Nature of Work: Revision #1: ADU remodel: add door in south bathroom wall, move lavatory from south
to west wall, and reroute drain waste vent usine either 3" nine or ventine to south wall and ioinine with
lavatory ainin>: in ceilin¢.
Owner: Wendy Davis Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS APPROVED/DATE
See original inspection record BLD00-231
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r
Building Permit #BLD00.23~-I
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted b
required inspections.
5. Re-inspection is required after any correMions are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspeMion ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. ContaM the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
~~- ---- v.: ----~......-~.._-..._._ -_
W alennan and Katz Building
181 Quincy Streel Suite 301
PoK Townsen4 WA 98368
Plwne (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
C~
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-231 Issued: 12!08/00 Parcel Number: 936-300-503
Job Address: 1231 Milo Street Zoning: R-I1 Type: VV=N , Occupancy: RR=3
Tote) Occupant Load:N/C Nature of Work: SF Residential Remodel: Chance unheated UtilitvAaundrv
room to ADU bathroom
Owner: Wendv Davis
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-4I7-2702
RF.(ITTTRF.T) TN4PF.C'TT(7NS
APPRnVET)/DATE
FLOOR FRAMING
Joists
Blocking
Positive Connection
Treated Wood to Concrete
PLUMBING
Rough-In (D-V-T & Clean Outs) ~// ~ ~~
~i (~Q (/~~
Water Supply
Pipe Insulation
Pressure Reduction Valve if pressure > 80 psi
Water Heater
Seismic Straps @ 1/3 points
Pressure relief valve drain to exterior, terminate 6" -
24" above grade, elbow down
MECHANICAL ~/
~ ~
3
Bathroom Fan /
/
Environmental Air Exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings)
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
REQUIRED INSPECTIONS
Buildi(g I'emtil #BLD00-I31
APPROVED/DATE
FRAMING:
Walls
Ceilings
3
~ 5~o r
Attic Venting l
Air Seal
Fire Blocking
INSULATION
Floor - (R-21) ~ / rn
C~~3/ 0 j ("i
/
Walls - (R-19) `
/
Ceiling - (R-38)
Upgrade insulation in existing ADU (R-19 to R-30)
Baffles
Vapor Barrier required
DRYWALL NAILING /
~ /mn
Walls ~
~
UUl
/ +l
Ceiling ,
l
FINAL
Smoke Detectors throughout existing construction per r~~Z Q ,~
77
1997 UBC; battery powered okay .~
House Numbers - 5" high
Vapor Barrier Paint Certificate (if applicable)
Insulation Certificate (if applicable)
Plumbing
Mechanical
Final -Building
J
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shat! be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates •
1-800-424-5555
Page 2 of 3
~ BuildingPrnnit #BLD00.231
• 3. All elements of engineering including nailing, holdowns, sheathing, and a]ternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Pu61ic Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or it no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval grior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig Tor utility line locates
1-800-424-5555
Page 3 of 3