Loading...
HomeMy WebLinkAboutBLD00-228weu~men d xatz 181 Quiory Street, Suite 301 PoR Toumend, WA 98368 Phone 1360)37937A8 Fsx (360)379.6923 CITY OF PORT TOWNSEND ' CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD00-228R-3 Issued: 05/22/02 Parcel Number: 957-900-601 Job Address: 1111 Hastings Avenue Zoning: R-II Type: VV=N Occupancy: R-3 Total Occupant Load:1~_ Nature of Work: Rev #3: construM second-story deck (96 sa. ft.) and add door to access deck. Owner: Jenno Catastini ContraMor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: NONE For other inspections, see other inspection records BLD00-228, BLD00.228R-1 and R-2 REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Deck Piers - 16" x 16" x 6" w/#4 rebar ~/~~~~ FLOORFRAMING/FRAMING All framing members and deck surface to be pressure treated wood or wood of natural resistance to decay. Treated Wood to Concrete Treated Wood Exposed to Weather 4 x 4 Posts 4x8Beam Positive Connection -post-to-beam and post-to- footing Joists Blocking Ledger Guardrails Windows -safety glazing Tempered Door U Factor:.65 or better FINAL See original permit and revisions. • Call 48 hours before you dig utility line locates 1-800-424-5555 Page 1 of 2 Pnmil MBLDpO-Z2ga-3 GENERAL CONDITIONS 1. Contractors working on this projeM are required to have a Labor & Industries contractor's resnstration number and a City business license. Fas7ure to provide proof of this documentation prior to work may result in job shut down.while this is accomplished. Z. Temporary erosion apd sediment control (TESC) messurea shall be installed oa-site and inspected prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils e=posed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soda shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applica-rt is responsible for protection of adjacent properties. 3. All elements of eagmeering including nailing, holdowns, sheathing, snd akernate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pasa final inspection oe your project until Public Works requirements have been completed and inspected. For Public Works inspection cs11385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scbedulin¢ the Buildin¢ Deoartme~'s final inspection. 7. Final Inspections are required prior to oce~ancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within su months, or if no inspections are done by the Building Depsrhnent within one year. Call for at least one inspection per year to keep your building permit active 9. Revisions require review and approval prior to making changes in the field Contact the Bns7ding Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig utility line locates 1-800-424-SSSS Page 2 of 2 J Walemvn and Katz Building I81 Quincy Slrod Suite 301 Pat Tow~wd, WA 98368 Phase (360) 379.3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Nmnber: BLD00-228R-2 Job Address: 1111 Hastines Avenue Issued: 412102 Parcel Number: 957-900-601 Zoning: R-II Type: VAN Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Rev #2: ADU above unheated studio. Owner: Jennifer (Schuler) Catastini Contractor: Same ss Owner GENERAL CONDTI'IONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries (n; 360-417-2702 REOIJIRED INSPECTIONS For other inspections, see original inspection record BLD00-228 PLUMBING Rough-1n ~~ ~ ~~~~~ Water Supply Gas Supply Water Hammer Arrestor (a~ clothes and dishwasher - ~c"~- ~ ~ ~ ` Pipe Insulation (R-3) l l - ` Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint Pressure Reducing Valve Drain to exterior MECHANICAL LPG Stove Whole House Fan Kitchen Fan Environmental Air Exhaust ducting, termination and Insulation APPROVED/DATE Ca1148 hours before you dig for utility line locates i-800-424-5555 Page 1 of 3 Building Permit MBLD00-22gR-2 REQUIRED INSPECTIONS APPRnVF,il/11ATF. FRAMING ---- ---- Walls Ceiling ~/~ / Roof ~ f Attic Venting -ridge and eave ` Air Seal Fresh Air -wall ports Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be windows and doors at time of Inspection Rafter Positive Connections F'ueblocking Weather Resistive Barrier INSULATION Floor (R-19) ///~~~ ~~~/o Walls (R-19) G Ceilings (R-30) VV Baffles Vapor Barrier - 4 mil poly DRYWALL NAILING Walls Ceiling ADU separation with 1-hour construction (not required if /~ (~ ~/ ~/® ~/ 6 - art studio remains R 3 occupancy) ((„ FINAL Plumbing Mechanical Insulation Certificate LPG ~/~~D~ Deck, Stairs, Handrails, Guardrails Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a ~itv business license. Failure to provide proof of this documehtation prior to work may resole in job shut down while this is accomplished. Call 48 hours before you dig for utility line locates I-800.424-5555 Page 2 of 3 BuiWwg Pumit #BLD00-228A 2 • 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing snd graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilnxd with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any correMions are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 3 of 3 ~~ Waterman and Katz Building ] 8l Quvwy Street Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TO~IVSEND r 1 U n 1.J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-228R-1 Issued: 6/26/01 Parcel Number: 957-900-601 Job Address: 1113 Hastines Avenue Zoning: RR=1I Type: VV=N Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Rev #1: Chances to unheated studio -added dormer to east side of storace loft, two skvli~hts in SE and NW roof enlareed bathroom and added tub, chanced sizes of some windows, and chanced north door to single door, Owner: Jennifer Schuler Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUHtED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,nTITRF.D INSPECTIONS APPROVED/DATE For other inspections, see original inspection record BLD00-228 FRAMING Windows -safety glazing / ~ Q L Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD00-228R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment contro{ (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. SoiLc shall be permanentty stabilized with seeding, plantings, sodding; etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-lour hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CaII 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • Waterman and Katz Building 18l Quincy Street Suite 30l Port Townsend, WA 98368 Phone (360) 379-3208 Faz (360) 383.7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-Z2g Issued: 4/24/01 Parcel Number: 957900601 Jab Address: 1113 Hastin¢s Avenue .Zoning: R-11 Type: V;N Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Construct Detached Art Studio accessory to SFR Owner: Jennifer Schuler Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.(1T1TRF.11 TNCPF.(`TTnNC APPRnVF.T)/nATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details if needed MONOLITHIC SLAB FOIINDATION Setbacks ' / ~/Y"l~ Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers te braced wall panel {ABWP) holdowns '~'C~ FLOOR MING Joists Blocking Positive Connections Ca1148 hours before you dig for utility line locates 1 1-800-424-5555. Page 1 of 3 Building Pertnil #BLDOOd28 REQUIRED INSPECTIONS APPRQVF.D/DATF. FRAMING n Walls ~ ~M ~! ( - ~( Alternate Braced Wall Panel `, ' I Roof /Ceiling Rafter Venting - cave & ridge w/ I" air above Rafters Rafter Ties Q 48" o.c. Headers Rafter/Truss Positive Connection Fireblocking Weather Resistive Barrier INSULATION -Building is considered unheated space; verification of insulation values is optional Wall(R-19) Ceiling (R-25 ) Baft7es Vapor Barrier: faced batts DRY WALL NAILING Walls Ceiling FINAL House Number -check 5" numbers on main house Smoke Detectors Final -Building /) /f `1 / v ( 'f / ~(" 1 `~ i lr GENERAL CONDITIONS • 1. Contractors working on this project are required to have a Labor & Industries contraMor's rev_istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (7'ESC) measures sha116e installed on-site and inspeMed prior to beginning construction; ca11 385-2 2 9 4, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Building Permit #BLD00.228 3. AI- elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 3 1-800-424-5555 Page 3 of 3 i