Loading...
HomeMy WebLinkAboutBLD00-227Waterman & Kazz Building l el Qwnry Sveet, Suite 307 Putt Townsend WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSENU CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-227 Issued: 11/22/00 Parcel Number: 948305402 Job Address: 1208 Gise Street Zoning: RR=H Type: VV=N Occupancy: RR_3 Nature of Work: Replace 17 windows and 4 sliding class doors in bedrooms 1 - 5, living room and kitchen bath den hall rec room and dining room in existing rough oaeninQS. Owner: William and Karen Bloemker 385-0544 Contractor: Groves & Co. Inc. GENERAL CONDITIONS APPLY - 5EE LAST PAGE REOiJIRED INSPECTIONS • APPROVED/DATE FRAMING/FINAL: Windows -safety glazing where applicable per attached details. Escape Windows -applicable in bedrooms if enlarging existing window sizes Window Ufactor - .40 or better (electric heat) NFRC window sticker must be on windows at inspection time Air Seal FINAL Smoke Detectors throughout house per 1997 Uniform Building Code; battery powered smoke detectors adequate in existing construction House Numbers -check for 5" high Final -Building CaII 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pami[ #BLD00-227 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construMPon entrance (see attached details). Adjacent rights-ot way shall be kept free of dirt debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aoaroval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2