Loading...
HomeMy WebLinkAboutBLD00-226Waterman & Kafx au8ding l8l Quincy 81rce4 Sui4 301 Part 1'awmend. WA 98368 Phony. 36037A5086 Fax 360385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-226 Issued: 12/04/00 Parcel Number: 951902703 Job Address: 4801 Emerald Zoning: RR=I Type: VV=N Occupancy: R-31U-1 Total Occupant Load: 7/2 Nature of Work: Construct Sinele-family DwellinE with aaraQe Owner: Steve Craig Contractor: Same as Owner 379-8036 GENERAL CONDITIONS APPLY: See last paEe SEPARATE PERMITS REQUIRED: Electrical Permit -..Contact WA State Dept. of Labor & Industries 360-417-2702 7?Ti l1TTTRFiI TNQPF("TT(lNC APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Inspection required prior to footing work See General Condition #2 Silt Fence as needed Graveled construction entrance to prevent dirt and sediment from leaving the site FOOTINGS 1 ~ ~/~~ Setbacks Footings Forms Reinforcement Interior Footings Porch/Deck Piers LIFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 1 Build'mg Permit N00-226 RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Vents -13 required Crawl Access Beam Pockets Alternate Braced Wall Panel Holdown Hardwaze ~ ~ ~~~ FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Girders Joists Blocking I.`~ ` ~ I " I , ' Shield under Posts ~2 ' ~ ~ I` b' a Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) /~, / / /~ Water supply / 6/ ` l Water Hammer Arrestor Gas Supply /~ /~©t Hose Bibbs - backflow protection. required T` Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground J C~ Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 5 Building Permit #1W-226 U C~ uiN nTrTUFn T7VCPF.C'TTnNC APPROVED/DATE MECHANICAL LPG Whole house ventilation -guest bath, F-1 Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfm) and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING-Street and Utility Development Permit ~ C~~/~'~ ~ ?/~, l~/~ ~ ~'~' //'~ c%~' required prior to Framing - Walls Alternate Braced Wall Panels Rafters Collar Ties Roof -engineered truss plan for garage to be on-site at time '~ ~L of Inspection i i i ~ on ve connect Rafter/truss pos t Attic venting -ridge, gable and soffit ~/~~r Posts, beams and headers /' Windows -escape Windows -safety glazing Window U-factor - 39 or better NFRC sticker must be on windows and French doors at time of inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 required) ~ IZ,/~~ /// Walls (R-21 including garage/house common wall) C/ l l,/ Ceiling (R-30 vault; R-38 attic) Baffles Vapor Barrier -faced batts & vapor barrier paint 6 mil black poly in crawl space -seams lapped 12" DRYWALL NAILING Walls ~~~ 3~~~ Ceiling GGGG Garage/House Occupancy Separation Interior Braced Wall Panels Enclosed Usable Space under Stairs Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 5 Suild'mg Pemtil N00-226 FINAL Public Works Sign-off LPG -Fire Department Sign-off House Numbers - 5" numbers Plumbing Mechanical/Heating F h i i ll \ ~ /' a res a r cert frcation from insta er Insulation Certificate ~ ~ p lS D ~ Vapor Barrier Paint Certificate Smoke Detectors ~ ~ ~ ~~ l - 1/ ~, Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works anarovat must be received prior. to scheduline the Buildint Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 4 of 5 Building Pttmit tt00-226 • 8. Att building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 u 1_