CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-224 Issued: 12/01/00 Parcel Number: 985-500-101
Job Address: 951 G Street Zoning: R_II Type: VV=N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Construct detached Accessory Dwellin8 Unit
Owner: Jens & Karle Coapenrath Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
u
SEPARATE PERMTI'S REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.niTiRF,D iNSPF,CTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 and conditions of Street and
Utility Development Permit
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS ~ .Z/~I D~
Setbacks
Footings
Forms
Reinforcement
Interior Footings
UFER
. Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
PaotitMBLD00.Y79
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
(Z~ ~ Z~
Reinforcement
Anchor Bolts with washers
Foundation Vents - 3 required
Crawl Access
Beam Pockets
Alternate Braced Wall Panel Holdowns
FLOOR FRAMING
Girder ~~
~~3 f 0 f l ',f'
Joists I " ~,
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/ 2 " x 2 "x 3/16" washers
PLUMBING:
Rough-In (D-V-T & Clean outs) , / .
~J W V ~ 1/~~ 3,2`~
Water Supply
Water Hammer Arrestor at clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL .,/
Whole House Fan - @ Bathroom ~~~/~
Source Specific Fans
Environmental Air Exhaust ducting (w! backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
Ca1148 hours before you dig Tor utility line locates
1-800-424-5555
Page 2 of 4
Permit H BI.D00.224
u
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
Alternate Braced Wall Panels ` /~
®~ ////
`'
Ceiling ~
l
~
Roof
Rafter Positive Connection
Attic Venting - ventilation @ I/ISO if located only at /~/
~~( 7l t~
eaves
Windows -escape
Window safety glazing
Windows Ufactor - .36 or better
NFRC window sticker must be on windows, .doors
and skylights at inspection time
Door U-factor -exempt
Air Seal
Fresh Air Intake (Window Ports)
Fire Blocking
Weather Resistive Bazrier
INSULATION
Floor (R=30) /)~
3~~ ~J~~~11
7
Walls (R=21 ) (
Ceiling (R-30 -vault
Battles
Vapor Barrier: faced bolts
6 mil black poly in crawl
DRY WALL NAILING
Walls
3~~/6 /
Ceiling
Enclosed Usable-Space under Stairs
FINAL
Public Works Sign-Off
House Numbers - 5" minimum _ n
~~ /y/
~~` 9~ (~
Plumbing / /
Mechanical/Heating
Smoke Detectors
Final -Building
• Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 3 of 4
«arn~.~
I. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
U
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits eapire if no progress has been made.within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.