Loading...
HomeMy WebLinkAboutBLD00-222Walumen &KatsBuildmg 181 Quinq Shat, Snite 301 Pwt Townsend, WA 98368 Phme: (360) 379-3208 Fan: (360) 365-1675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Cal! 385-2294 for Inspection Permit Number: BLDOO-222 Issued: 11/21/00 Parcel Number: 989706301 Job Address: 305 Pierce Street Zoning: R_II Type: VV=N Occupancy: RR=3 Nature of Work: Remove roofine material replace sheetine install composition roof, provide ventilation Owner: Edear Allen. Trustee of Shilo Herita¢e Trust (360) 385-A888 GENERAL CONDITIONS APPLY -SEE LAST PAGE Contractor: Affordable Services RFOTTTRF.T)1NCPFC'.TTCINS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING 1/2" CDX plywood requires 8d @ 6" o.c. edges & 12" field or 1 '/s" staples (a3 6" o.c. edges and field. ROOF VENTING Net free ventilation area shall not be less than 1 square foot per 300 square feet of the azea of the space ventilated. Openings shall be covered with corrosion resistant''/s" mesh. ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter 15 FINAL House Numbers - 5" numbers of contrasting color posted neaz main entrance of house and visible from street per City Ordinance Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ranur tBinoo-z22 ENERAL CONDITION 1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mniching, plastic sheeting, etc. Soils. shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and sltemate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project und7 Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aonroval must be received prior to 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within .one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes is the field. Contact the Bm7ding Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2