HomeMy WebLinkAboutBLD00-222Walumen &KatsBuildmg
181 Quinq Shat, Snite 301
Pwt Townsend, WA 98368
Phme: (360) 379-3208 Fan: (360) 365-1675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Cal! 385-2294 for Inspection
Permit Number: BLDOO-222 Issued: 11/21/00 Parcel Number: 989706301
Job Address: 305 Pierce Street Zoning: R_II Type: VV=N Occupancy: RR=3
Nature of Work: Remove roofine material replace sheetine install composition roof, provide ventilation
Owner: Edear Allen. Trustee of Shilo Herita¢e Trust
(360) 385-A888
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Contractor: Affordable Services
RFOTTTRF.T)1NCPFC'.TTCINS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
1/2" CDX plywood requires 8d @ 6" o.c. edges & 12"
field or 1 '/s" staples (a3 6" o.c. edges and field.
ROOF VENTING
Net free ventilation area shall not be less than 1 square
foot per 300 square feet of the azea of the space
ventilated. Openings shall be covered with corrosion
resistant''/s" mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15
FINAL
House Numbers - 5" numbers of contrasting color
posted neaz main entrance of house and visible from
street per City Ordinance
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
ranur tBinoo-z22
ENERAL CONDITION
1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mniching, plastic sheeting, etc. Soils.
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and sltemate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project und7 Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works aonroval must be received prior to
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within .one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes is the field. Contact the Bm7ding
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2