HomeMy WebLinkAboutBLD00-221watemun ~ xat[suimug
I81 Quitny Stree4 Suite 30I
Port Totmsend,WA 98368
Phone: (360) 3793208 Fan: (360) 3817675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-221 Issued: 11127!00 Parcel Number: 985209801
Job Address: 1630 Walnut Street Zoning: RR=II Type: VV=N Occupancy: R_3
Nature of Work: Residential Addition: Construct unheated storage
Owner: Harold Andersen and Jane Albee Contractor: Owner
360-683-7019
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• RE UIRED INSPECTIONS
APPROVED/DATE
MONOLITHIC SLAB FOUNDATION
Setbacks
Forms
Footings
Reinforcement
Anchor Bolts @ 32" o.c.
FRAMING
Walls
Treated Wood to Concrete
Ceiling
Roof -engineered truss plan shall be on-site @ time of
Inspection
Attic Venting
Blocking
Seismic Ties
Fireblocking
Weather Resistive Bamer
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
tt~' ~~
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION - unheated space
Wals -verify R-11
Ceiling -verify R-19
DRYWALL/NAILING
Walls
Ceiling
FINAL
House Numbers -check for 5" numbers
Smoke detectors throughout existing construction per 1997
UBC: one in each sleeping room, in each area or hallway
leading to steeping rooms, with minimum one each floor;
battery powered olury
Final -Building
J
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istratian
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment.control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
ete. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on yourproject until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Ca1148 hours before you dig Tor utility line locates •
I-800-424-5555
Page 2 of 3
r~i «ewoazzi
7. Final Inspections .are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
U
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 3
1