Loading...
HomeMy WebLinkAboutBLD00-217Building std Community Development Waterman & Katz Building 181 Quincy Street Suitc 301 Port Townsend, WA 98368 Phone: (360)379.3208 Fax: (360)383-76'73 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDOO-217 Issued: 11/17/00 Parcel Number: 955900000 & -010 Owner/Contractor: Hamilton Heights LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lots 9 & 10 2292 Rainier Street Zoning: PUD Type: V_N Occupancy: R-3/U-1 Total Occupant Load: 5/2 Nature of Work: Set Manufactured Home w/ attached site-built garage GENERAL CONDTPIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7:30 tcm. to tS:00 p.m. Monday through Friday and prohibited on weekends and national holidays*** RF.OTITRF.D TNSPF,CTTONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See details attached to ~41IP and general condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE 1 ~ :~~/~ ~ ~~ ~r~tf-~- ~L iA~ Setbacks . . ' Forms // ~~~ nn /n / Y~ ~~/ ~~ S' (J J t Monolithic S1ab/Foundation (garage) , C / tt~~ Reinforcement Anchor Botts Alternate Braced Wall Panel Holdown Hazdwaze Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 '\`'t r~anawoazn REQUIRED INSPECTIONS APPRnVF.11lIlATF, FLOOR FRAMING (prior to skirting) D Anchors ~ 7 ,~ C Z,r o® ~ Steel Support Piers - Load~7amped acrd installed per `~~ l `'j, marnrfacturer's installation manual; clearance of 18"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual species; otherwise area around home graded to provide runoff away from home PLUMBING: „ n Water Supply -Main shut-off valve (port or ball valve) V V /J ~ ~ ~ ~V V ' J installed in water supply piping prior to comrection to home, min. ~ '/+"diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS minutes . Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between. 6"and 24"above ground Drainage Piping -sloped min. %."per foot MECHANICAL Ducts & Duct Insulation ~ ~ l ~/of, Dryer Exhaust -vented to outside. Extension into crawl space 1 l/~ requires venting through skirting with no dips; follow dryer mamrfacturer's instructions; total combined length of ducting not to exceed 14' w/2-90° elbows FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls Alternate Braced Wall Panels Header Roof Garage/Ilouse Attachmern DRY WALL NAILING Garage/House Occupancy Separation w/20 minute self-closing door U Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Permit # BI.D00.217 • FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number - 5" numbers Plumbing Mechanical Final -Building No holes or gaps greater than l/. "allowed in skirting. Skirting to be rated for contact with earth tf backfill is involved. Crawl space ventilation per installation manual @ I sq. ft./150 sq. ft. (11 req'd); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must pravide access to all areas under home; minimum ]8"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. GENERAL CONDITIONS • 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Ca1148 hours before you dig for utility line locates 1-800-424-SS55 Page 3 of 4 Permit # BLD00$17 - 6. The Building Department is unable to pass final inspection oo your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within sin months, or if no inspections are dom by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making chwges to the approved plans. 10. POST THIS PERNIIT ON-SITE WITH THE APPROVED PLANS. U Call 48 hours before you dig for uts7ity line locates i-800.424-5555 Page 4 of 4