CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDOO-217 Issued: 11/17/00 Parcel Number: 955900000 & -010
Owner/Contractor: Hamilton Heights LLC Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lots 9 & 10 2292 Rainier Street Zoning: PUD Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 5/2 Nature of Work: Set Manufactured Home w/ attached site-built garage
GENERAL CONDTPIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
***Hours of Construction are limited to 7:30 tcm. to tS:00 p.m. Monday through
Friday and prohibited on weekends and national holidays***
RF.OTITRF.D TNSPF,CTTONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See details attached to ~41IP and general condition #2
Silt Fence
Drive Off Mat
SLAB/CONCRETE
1
~ :~~/~
~
~~
~r~tf-~- ~L
iA~
Setbacks .
.
'
Forms //
~~~
nn /n
/
Y~ ~~/ ~~
S'
(J
J
t
Monolithic S1ab/Foundation (garage) ,
C
/
tt~~
Reinforcement
Anchor Botts
Alternate Braced Wall Panel Holdown Hazdwaze
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
'\`'t
r~anawoazn
REQUIRED INSPECTIONS
APPRnVF.11lIlATF,
FLOOR FRAMING (prior to skirting)
D
Anchors ~ 7 ,~ C Z,r o® ~
Steel Support Piers - Load~7amped acrd installed per `~~ l `'j,
marnrfacturer's installation manual; clearance of 18"min. from
lowest point of I-beam and the ground or footing for min. of 75%
of area under home w/ 12 "min. elsewhere unless installation
manual species; otherwise area around home graded to provide
runoff away from home
PLUMBING: „ n
Water Supply -Main shut-off valve (port or ball valve) V V /J
~ ~ ~ ~V V
' J
installed in water supply piping prior to comrection to home, min. ~
'/+"diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s.i. for IS minutes .
Pressure relief valve drain - to exterior of skirting, exhaust
dowmvard between. 6"and 24"above ground
Drainage Piping -sloped min. %."per foot
MECHANICAL
Ducts & Duct Insulation
~ ~ l ~/of,
Dryer Exhaust -vented to outside. Extension into crawl space 1 l/~
requires venting through skirting with no dips; follow dryer
mamrfacturer's instructions; total combined length of ducting not
to exceed 14' w/2-90° elbows
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
Walls
Alternate Braced Wall Panels
Header
Roof
Garage/Ilouse Attachmern
DRY WALL NAILING
Garage/House Occupancy Separation w/20 minute self-closing
door
U
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
Permit # BI.D00.217
•
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number - 5" numbers
Plumbing
Mechanical
Final -Building
No holes or gaps greater than l/. "allowed
in skirting. Skirting to be rated for contact with
earth tf backfill is involved.
Crawl space ventilation per installation
manual @ I sq. ft./150 sq. ft. (11 req'd);
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must pravide access to
all areas under home; minimum ]8"x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
GENERAL CONDITIONS
• 1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
Ca1148 hours before you dig for utility line locates
1-800-424-SS55
Page 3 of 4
Permit # BLD00$17 -
6. The Building Department is unable to pass final inspection oo your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within sin months, or if no inspections are
dom by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making chwges to the approved plans.
10. POST THIS PERNIIT ON-SITE WITH THE APPROVED PLANS.