Loading...
HomeMy WebLinkAboutBLD00-216r i CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection City of Port Townsend Waterman & Katz Building 181 Quincy Street, PMTowxtsend, W A 98368 (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND Permit Number: BLD00-216 Issued: 12/06/00 Parcel Number: 984601301 Job Address: 405 Foster Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: add 2 Nature of Work: Residential Addition. Owner: Kevin Buraler and Gail Boulter-Buraler Contractor: Same as Owner GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE EROSION CONTROL Installation of graveled drive-off mat and sweeping of paved surfaces may be required to eliminate the tracking of dirt and debris onto City rights-of--way FOOTINGS Setbacks %tn'LcTitt7 1 Z/2~ /O~ n/J ` ! (_ am Footings l . Forms Reinforcoment Interior Footings FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts Vents Crawl Access Beam Pockets R-10 @ perimeter • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Pmnit #BI.D00-216 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING TJI joist plan shall be on-site at time of inspection 1 ~~ ~ ~ 0 ,q Girder ( l Joists Blocking Hangers Positive Connection Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: Rough-In (D-V-T & Cln Outs) (~ Water Supply I I Hydronic Piping Hose Bibs (bckflw pro. req'd) Pressure Reduction Valve if > 80 psi MECHANICAL Whole House Fan -new bath f a `~ Z~ Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from openings) FRAMING: Walls //l1 ~ Attic Venting -ridge and eave ~ ~ ~ Z t o L Ceilings Roof Posts, Beams and Headers -DF #I speed @ porch Windows -safety glazing Windows Ufactor - .63 or better NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Wall) Door UFactor - .42 or better RaftedTruss Positive Connection Fire Blocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 1 of 4 Building Permit #BI,D00.216 RF.(ITiTRF.TI TNSPF,CTTnNS APPROVED/DATE • • INSULATION ---- -- ------- Slab (R-10) ,, /~,nn r ~ W ~t~' ~ ~ [~'-(.Y~`-1 ~~/ Wall(R-19) Floor (R-19 ) Ceiling (R-38/R-30 ) Baft7es Vapor Barrier. paint & poly DRY WALL NAILING ~ ' Walls ~ Ceiling ~\ _ ~ `\ `5~ `~ ~ 1 FINAL House Numbers Plumbing Mechanical Insulation Certificate V. B. Paint Certificate Smoke Detectors throughout existing construction Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 s~°~ Building Permit.#BI,D00.2BS 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 4. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4