HomeMy WebLinkAboutBLD00-216r
i
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
City of Port Townsend
Waterman & Katz Building
181 Quincy Street, PMTowxtsend, W A 98368
(360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
Permit Number: BLD00-216 Issued: 12/06/00 Parcel Number: 984601301
Job Address: 405 Foster Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: add 2 Nature of Work: Residential Addition.
Owner: Kevin Buraler and Gail Boulter-Buraler Contractor: Same as Owner
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS APPROVED/DATE
EROSION CONTROL
Installation of graveled drive-off mat and sweeping
of paved surfaces may be required to eliminate the
tracking of dirt and debris onto City rights-of--way
FOOTINGS
Setbacks %tn'LcTitt7 1 Z/2~ /O~ n/J
` ! (_
am
Footings l
.
Forms
Reinforcoment
Interior Footings
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts Vents
Crawl Access
Beam Pockets
R-10 @ perimeter
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Building Pmnit #BI.D00-216
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
TJI joist plan shall be on-site at time of inspection
1 ~~ ~ ~ 0 ,q
Girder ( l
Joists
Blocking
Hangers
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Cln Outs)
(~
Water Supply I
I
Hydronic Piping
Hose Bibs (bckflw pro. req'd)
Pressure Reduction Valve if > 80 psi
MECHANICAL
Whole House Fan -new bath
f a `~ Z~
Environmental Air Exhaust ducting (with backdraft
damper), insulation (R-4) and terminus (located 3'
from openings)
FRAMING:
Walls //l1
~
Attic Venting -ridge and eave ~ ~
~ Z t o
L
Ceilings
Roof
Posts, Beams and Headers -DF #I speed @ porch
Windows -safety glazing
Windows Ufactor - .63 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
Fresh Air Intake (Wall)
Door UFactor - .42 or better
RaftedTruss Positive Connection
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates •
1-800-424-5555
Page 1 of 4
Building Permit #BI,D00.216
RF.(ITiTRF.TI TNSPF,CTTnNS APPROVED/DATE
•
•
INSULATION ---- -- -------
Slab (R-10) ,, /~,nn r ~
W ~t~' ~ ~ [~'-(.Y~`-1
~~/
Wall(R-19)
Floor (R-19 )
Ceiling (R-38/R-30 )
Baft7es
Vapor Barrier. paint & poly
DRY WALL NAILING
~ '
Walls ~
Ceiling ~\ _ ~ `\ `5~
`~ ~ 1
FINAL
House Numbers
Plumbing
Mechanical
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors throughout existing construction
Final -Building
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details). Adjacent
rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
s~°~
Building Permit.#BI,D00.2BS
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works approval must be
received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
4. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4